Risk assessment and ranking in the developing countries’ construction industry: the case of Jordan

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Muhammad T. Hatamleh ◽  
Gary P. Moynihan ◽  
Robert G. Batson ◽  
Ammar Alzarrad ◽  
Olugbenro Ogunrinde

PurposeRisk impedes the success of construction projects in developing countries due to planning in an unpredictable and poorly resourced environment. Hence, the literature suggests that practitioners are not fully aware of how important the risk identification process is. Some of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry. Therefore, this study highlights this process and identifies the key risks that affect the Jordanian construction industry.Design/methodology/approachThis study adopted an exploratory sequential mixed approach, two rounds of face-to-face interviews that were conducted in Jordan among 12 experts followed by a questionnaire randomly distributed to 122 practitioners. This study utilized the relative importance index, coefficient of variation, and Mann–Whitney (U) to analyze the data. Also, the factor analysis technique was used to identify and regroup the risk factors to further understand the correlation among the risks.FindingsThe result revealed an agreement among contractors’ and consultants’ responses toward allocating risks. Furthermore, several risks can be traced back to the project communication management process, highlighting a deficiency in the process. Also, four-factor groups were established, the first group includes the risk of defective design, late decisions making by other project participants and poor coordination with the subcontractor. The second group has only the risk of corruption, including bribery at sites. The third group includes stakeholders’ financial instability and inadequate distribution of responsibilities and risks. The fourth group includes adverse weather conditions and the use of illegal foreign labor.Originality/valueSome of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Charles Igwe ◽  
Fuzhan Nasiri ◽  
Amin Hammad

PurposeThis study highlights the findings of an empirical study to investigate waste factors (WFs) affecting the performance and delivery of construction projects in developing countries. The objectives of this study are to identify non-physical WFs in developing nations and rank the identified factors based on their degree of influence on the key performance indicators (KPIs) of cost, quality and time.Design/methodology/approachIn total, 34 WFs were identified through a detailed literature review and consolidated using semi-structured interviews with construction practitioners. The statistical analysis involved a normality test using the Shapiro–Wilk test to determine if sample data have been drawn from a normally distributed population, ranking the WFs using the Frequency Index (FI), Severity Index (SI) and Importance Index (IMPI), ranking the WFs based on their effect on the project KPIs of cost, quality and time, and identify clustering structures for the identified WFs to using factor analysis (FA).FindingsThe results revealed ineffective planning and scheduling, rework/repair of defective work and resource quality problems (human, material and equipment) as the three most important WFs affecting construction projects. The factor analyses showed that WFs can be grouped into five interrelated components, suggesting the need for integrated and holistic strategies to overcome the identified WF.Practical implicationsUnderstanding the effects of WFs on construction projects is a first step towards designing holistic solutions to ensuring projects deliver value to the clients and other stakeholders. The findings of this study provide direction to construction practitioners on where to focus appropriate strategies to manage the identified WFs effectively and, therefore, improve the productivity of construction projects.Originality/valueThis study provides the first holistic analysis of WFs affecting the productivity of construction projects in developing countries.


2018 ◽  
Vol 25 (7) ◽  
pp. 818-834 ◽  
Author(s):  
Douglas Omoregie Aghimien ◽  
Ayodeji Emmanuel Oke ◽  
Clinton Ohis Aigbavboa

Purpose The purpose of this paper is to determine the barriers to the adoption of value management (VM) in the construction industry of developing countries with a view to providing possible measures in avoiding these barriers and increasing the usage of the system within the construction industry. Design/methodology/approach The level of knowledge and adoption of VM practices, as well as the barriers to its adoption in the construction industry were assessed through a survey design. Construction professionals were sampled from the six geo-political zones in Nigeria through the use of a structured questionnaire. Factor analysis was conducted on data gathered on the barriers of VM. Findings The study revealed a moderate level of knowledge of VM among construction professionals. This implies that the problem of VM is not that of awareness, but readiness to adopt the system. The study also reveals that the barriers to the adoption of VM can be categorised under the general stakeholder’s barriers, training and education barriers, client barriers and government/top management barriers. Practical implications This study was conducted across the six geo-political zones of the country as against common practice of selecting a particular region or states to represent the entire country. The findings therefore show a true reflection of the barriers to VM adoption in the country and its recommendations can to a large extent promote the adoption of VM in the country and also other developing countries where construction projects are executed through similar method, style and approach. Originality/value This paper highlights the possible barriers to the adoption of VM in Nigeria construction industry and provides ways to avoiding these barriers in order to achieve better quality construction and value for money.


2022 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Hashim Ibrahimkhil ◽  
Laith Hadidi

PurposeThe aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.Design/methodology/approachA literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.FindingsThe safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.Practical implicationsThe findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.Originality/valueTo the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.


2020 ◽  
Vol 20 (3) ◽  
pp. 313-330 ◽  
Author(s):  
Ernest Kissi ◽  
Theophilus Adjei-Kumi ◽  
Samuel Twum-Ampofo ◽  
Caleb Debrah

Purpose The non-achievement of projects of best value remains a perennial problem within the construction industry. This paper aims to identify the latent shortcomings affecting the achievement of value for money (VfM) within the Ghanaian construction industry. Design/methodology/approach From a comprehensive literature review and pilot survey, 18 variables responsible for the non-achievement of VfM were identified. Through purposive and snowballing sampling techniques, a questionnaire was administered to the target professionals. Factor analysis was used to establish the latent shortcomings underlying the same dimensions of VfM achievement in the Ghanaian construction industry. Findings A total of six components were identified and explained as external factors; institutional culture and policy constraints; technical and decision-making factors; human-related factors and accountability and transparency constraints. The relative importance index was used in analysing the strategies to addressing the shortcomings. Social implications The prevalent situation of poorly delivered projects and the continuous campaign for VfM necessitated the need for a study into explaining the latent shortcomings in achieving VfM within the Ghanaian construction industry. It is recommended that governments give VfM in public projects serious attention. This would help to reduce the overall cost of construction projects without compromising quality. When VfM is taken seriously, governments can save more money and undertake more projects as well as gain public acceptance in terms of transparency and accountability. Originality/value This study has set the pace for further research in the VfM analysis by identifying the latent shortcoming, which other developing countries can emulate.


Author(s):  
Ali Fathalizadeh ◽  
Parviz Ghoddousi ◽  
Ali Akbar Shirzadi Javid ◽  
M. Reza Hosseini ◽  
Arka Ghosh

This paper is an attempt to explore the barriers to integrating sustainability into construction project management in developing countries. To this end, a comprehensive review of the literature is conducted, as a result of which a list of 30 barriers is culled from existing studies. The list of barriers is subsequently assessed in terms of relative importance index (RII) through a survey questionnaire administered to Iranian construction industry experts, resulting in a dataset of 176 completed questionnaires. Findings bring to light the most influential barriers to incorporating sustainability in construction projects for a developing country. These were: (1) lack of understanding of the potential selfbenefits of proactivity and high economic risks that unsustainable practices may carry, (2) inadequate assessment of risks and a silo-based approach, namely, insufficient cooperation among practitioners, research institutions and environmental organisations and (3) the lack of a systematic approach to planning and acting for the fulfilment of sustainability goals. As one of the first studies in its kind, the paper offers invaluable insight for researchers, practitioners, and policy makers, in supporting the transition of construction project management practices towards fulfilling sustainable development goals.


2017 ◽  
Vol 24 (3) ◽  
pp. 451-462 ◽  
Author(s):  
Ali Rostami ◽  
Chike F. Oduoza

Purpose Risks play an important role in the success of construction projects. Failure in identification and assessment of risks can lead to inadequacy in the process of managing risks, which in turn can critically affect the projects’ resources. A formal risk management is rarely practised in construction projects due to the lack of contractors’ awareness of key risks. The purpose of this paper is to focus on the investigation of risk factors in construction projects in Italy from contractors’ perspective. Design/methodology/approach Semi-structured interviews were conducted to collect data, based on which a total of ten key risks were ascertained. The identified risks were compared with the findings of the surveys conducted in the Australian and Chinese construction industry to address the unique risks associated with construction projects in Italy. Findings The key risks included delays in payments, client variations, design variations, inaccurate cost estimates, and tight project schedules. The comparison between those three countries specified the delays in payments and project funding problems as the most critical factors that are related to cultural influences and behaviour of clients. The findings assist contractors in the risk identification process, and can be applied to the development of a risk management framework for construction projects. Research limitations/implications The findings of this study cannot be generalised statistically for the whole of Italy as it was constrained geographically, with respondents drawn only from a self-selection sample of construction projects in the Veneto region of Northern Italy. The findings represent a snapshot of the key potential internal and external risks from the perspective of contractors. Originality/value The results of the study specified the key risks of construction projects from the perspective of contractors which can contribute to risk management for construction projects.


2019 ◽  
Vol 26 (3) ◽  
pp. 386-407 ◽  
Author(s):  
Abid Hasan ◽  
Kumar Neeraj Jha

PurposeDelays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy. However, previous studies have shown that inadequate understanding and wrong implementation of schedule I/D provisions could result in unintended results. Moreover, the use of the I/D contracting method is in its initial stages in many countries such as India. The purpose of this paper is to identify various factors that are essential for schedule I/D success in construction projects.Design/methodology/approachA questionnaire survey was conducted among experienced professionals (clients, contractors and consultants) from across the Indian construction industry.FindingsTop success factors related to clients in the descending order of their importance are: realistic targets; detailed guidelines for I/D implementation; close coordination with other stakeholders; correct estimation of I/D duration and amount; and imposing disincentives after due consideration. Meanwhile, factors related to contractor organisations are: continuous monitoring and control; thorough understanding of schedule I/D targets; specific considerations in appointing senior project personnel; effective communication; and proper labour management.Research limitations/implicationsThis empirical research was conducted in the Indian construction industry. Similar studies from developed construction markets may provide more insights into the successful use of schedule I/D provisions in construction projects.Practical implicationsThe uptake of these recommendations is likely to increase the success of schedule I/D provisions in construction projects, especially in developing countries where the use of I/D contracting strategy is not very popular.Originality/valueThis research highlights the specific roles of both clients and contractors in the success of schedule I/D projects in developing countries such as India.


2018 ◽  
Vol 8 (3) ◽  
pp. 293-304 ◽  
Author(s):  
Chukwuka Christian Ohueri ◽  
Wallace Imoudu Enegbuma ◽  
Ngie Hing Wong ◽  
Kuok King Kuok ◽  
Russell Kenley

Purpose The purpose of this paper is to develop a motivation framework that will enhance labour productivity for Iskandar Malaysia (IM) construction projects. The vision of IM development corridor is to become Southern Peninsular Malaysia’s most developed region by the year 2025. IM cannot realise this foresight without effective labour productivity. Previous studies have reported that the labour productivity of IM construction projects was six times lower than the labour productivity of Singapore construction projects, due to lack of motivation among IM labourers, and a shortage of local skilled labour. Therefore, there is a need to study how to motivate IM construction labourers, so as to increase their productivity. Design/methodology/approach A quantitative research method was used to collect data from IM construction skilled labourers and construction professionals, using two sets of questionnaire. The respondents were selected using a purposive sampling technique. In total, 40 skilled labourers and 50 construction professionals responded to the questionnaire survey, and the data were analysed using Statistical Package for Social Science software (version 22). Findings The analysis revealed the major factors that motivate labourers participating in IM construction projects. The factors were ranked hierarchically using Relative Importance Index (RII) and the outcome of the ranking indicated that effective management, viable construction practices, financial incentives, continuous training and development, and safe working environment were the most significant motivation strategies that positively influence IM construction labourers. Originality/value The study developed and validated a framework that can be used to boost the morale of IM construction labourers, so that their productivity can be increased. Implementation of the established motivation framework will also lead to career progression of IM construction labourers, based on the training elements in the framework. This career prospect will attract local skilled labourers to participate in IM construction projects.


Author(s):  
Aly Elgayar ◽  
Salwa Mamoun Beheiry ◽  
Alaa Jabbar ◽  
Hamad Al Ansari

Purpose Over the past decade, the United Arab Emirates (UAE) introduced several green regulatory guidelines, federal decrees, and a considerable number of environmentally friendly initiatives. Hence, the purpose of this paper is to investigate the top green materials and systems used currently in the UAE construction industry as per the new laws dictate as well as see if professionals are switching over to incorporate more green materials, systems, and/or designs. Design/methodology/approach The work involved reviewing internationally popular green materials and systems for construction, developing a questionnaire based on the literature review, surveying professionals in the seven UAE emirates, and ranking the findings based on the relative importance index. Findings Findings found the top used green materials and system in the UAE’s construction industry. As well as identified that there is a communication gap between the design and implementation phases that is possibly hindering the use of more green materials and systems. Originality/value This study sets a baseline to measure the UAE’s progress over the coming years in terms of integrating more green construction materials, systems, methodologies, and trends.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi ◽  
Olusola Ogunsina

Purpose The Nigerian construction industry is bedeviled with poor project performance and outcomes which value management (VM) could address if applied. The application of VM on Nigerian construction projects is very minimal due to certain obstacles, namely, lack of VM experts, paucity of knowledge on the techniques, etc., which inhibits the adoption into the construction industry. Therefore, this study aims to develop a conceptual framework of the adoption of VM on construction projects in a typical developing economy. Design/methodology/approach This study engaged 15 selected VM experts in two rounds of Delphi survey to develop a conceptual framework of VM adoption. The method of data analysis includes mean score, standard deviation, Kendall’s coefficient of concordance, chi-square (χ2) test, interrater agreement analysis and significant level analysis. The developed conceptual framework was sent to a team of local and international VM experts for validation. Findings This study reveals that the adoption of VM requires the collective effort of relevant stakeholders in the construction industry. The framework developed presents individual and collective activities to be undertaken by the stakeholders. The activities include training, legislation, government-funded research, etc. Thus, the adoption of innovative management methodology like VM requires the collaboration of academics, construction professional bodies and government parastatals. This will assist in the judicious use of limited construction resources and boost the relevance of the Nigerian construction industry among developing nations and in the global construction market. Originality/value This study used the opinions of few construction professionals that can be regarded as VM experts in Nigeria, as against engaging a pool of construction professionals who may not be knowledgeable in VM process. Engaging the few VM experts in the Nigerian construction industry is important to have a valid basis for drawing conclusion, as large questionnaire survey could be possibly filled by inexperienced or unqualified respondents if stringent criteria are not considered at the outset of this study.