Barriers to the adoption of value management in developing countries

2018 ◽  
Vol 25 (7) ◽  
pp. 818-834 ◽  
Author(s):  
Douglas Omoregie Aghimien ◽  
Ayodeji Emmanuel Oke ◽  
Clinton Ohis Aigbavboa

Purpose The purpose of this paper is to determine the barriers to the adoption of value management (VM) in the construction industry of developing countries with a view to providing possible measures in avoiding these barriers and increasing the usage of the system within the construction industry. Design/methodology/approach The level of knowledge and adoption of VM practices, as well as the barriers to its adoption in the construction industry were assessed through a survey design. Construction professionals were sampled from the six geo-political zones in Nigeria through the use of a structured questionnaire. Factor analysis was conducted on data gathered on the barriers of VM. Findings The study revealed a moderate level of knowledge of VM among construction professionals. This implies that the problem of VM is not that of awareness, but readiness to adopt the system. The study also reveals that the barriers to the adoption of VM can be categorised under the general stakeholder’s barriers, training and education barriers, client barriers and government/top management barriers. Practical implications This study was conducted across the six geo-political zones of the country as against common practice of selecting a particular region or states to represent the entire country. The findings therefore show a true reflection of the barriers to VM adoption in the country and its recommendations can to a large extent promote the adoption of VM in the country and also other developing countries where construction projects are executed through similar method, style and approach. Originality/value This paper highlights the possible barriers to the adoption of VM in Nigeria construction industry and provides ways to avoiding these barriers in order to achieve better quality construction and value for money.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi ◽  
Olusola Ogunsina

Purpose The Nigerian construction industry is bedeviled with poor project performance and outcomes which value management (VM) could address if applied. The application of VM on Nigerian construction projects is very minimal due to certain obstacles, namely, lack of VM experts, paucity of knowledge on the techniques, etc., which inhibits the adoption into the construction industry. Therefore, this study aims to develop a conceptual framework of the adoption of VM on construction projects in a typical developing economy. Design/methodology/approach This study engaged 15 selected VM experts in two rounds of Delphi survey to develop a conceptual framework of VM adoption. The method of data analysis includes mean score, standard deviation, Kendall’s coefficient of concordance, chi-square (χ2) test, interrater agreement analysis and significant level analysis. The developed conceptual framework was sent to a team of local and international VM experts for validation. Findings This study reveals that the adoption of VM requires the collective effort of relevant stakeholders in the construction industry. The framework developed presents individual and collective activities to be undertaken by the stakeholders. The activities include training, legislation, government-funded research, etc. Thus, the adoption of innovative management methodology like VM requires the collaboration of academics, construction professional bodies and government parastatals. This will assist in the judicious use of limited construction resources and boost the relevance of the Nigerian construction industry among developing nations and in the global construction market. Originality/value This study used the opinions of few construction professionals that can be regarded as VM experts in Nigeria, as against engaging a pool of construction professionals who may not be knowledgeable in VM process. Engaging the few VM experts in the Nigerian construction industry is important to have a valid basis for drawing conclusion, as large questionnaire survey could be possibly filled by inexperienced or unqualified respondents if stringent criteria are not considered at the outset of this study.


2020 ◽  
Vol 10 (4) ◽  
pp. 547-565 ◽  
Author(s):  
Temidayo Oluwasola Osunsanmi ◽  
Clinton Ohis Aigbavboa ◽  
Ayodeji Emmanuel Oke ◽  
Muredini Liphadzi

PurposeConstruction 4.0 technology has the capabilities for improving the design, management, operations and decision making of construction projects. Therefore, this study aimed at examining the willingness of construction professionals towards adopting construction 4.0 technologies.Design/methodology/approachThe study adopts a survey design, and construction professionals in South Africa are assessed using a convenience sampling technique through a structured questionnaire. The questionnaire was analysed with SPSS while statistical test like; mean score, t-test and principal component analysis was used to present the data.FindingsThe findings, from the analysis, revealed that the construction professionals are willing to adopt construction 4.0 technologies for construction project. However, the possibility of fully integrating the technologies into the construction industry is low. This is because the major technologies such as; Internet of things, robotics, human-computer interaction and cyber-physical systems that encourage smart construction site are rated as not important by the construction professionals.Practical implicationsIt is believed that the findings emanating from this study will serve as an indicator for investors that are interested in procuring construction 4.0 technologies for the construction industry.Originality/valueThis paper presents a framework for the application of construction 4.0 technologies for the construction industry. It also contributes to the development of digitalising construction industry in South Africa.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Abdulmalik Abubakar Badamasi ◽  
Komal Raj Aryal ◽  
Usman Umar Makarfi ◽  
Mansir Dodo

PurposeVirtual reality (VR) offers unique features of a three-dimensional (3D) model during early design stages in the virtual environment with immersive functions. Although the potential of VR is to increase the effectiveness and productivity of the project phases from initial concept design to detailed design preparation. VR adoption in the United Kingdom (UK) Architectural Engineering and Construction (AEC) sector is slow compared to other sectors. This research focuses on ascertaining the drivers and barriers of VR in construction projects in the UK.Design/methodology/approachThe study adopts an online survey design. It uses Bristol Online Survey (BOS) to create a structured questionnaire that is used to assess UK construction professionals using a convenience sampling technique. Therefore, researcher uses descriptive and inferential technique for data analysis and presentation based on Statistical Package for Social Sciences (SPSS) to analyze the questionnaire.FindingsThe research findings revealed the most significant barriers to VR adoption in UK construction industry were lack of skills/expertise and cultural change. Hence, the main drivers of VR adoption as rated by the professionals in the UK construction industry are improved safety, improved quality and improved productivity.Practical implicationsThe identification and assessment of the drivers and barriers to VR adoption could advance VR adoption among construction professionals and other stakeholders of the UK AEC sector. This could also be extended to developing countries, given the status of VR as being in the developing stage.Originality/valueThis study provides valuable insights to construction professionals and stakeholders to plan actions that could enhance the drivers and mitigate the barriers of VR. This study's main contribution is to group and classify various drivers and barriers into easily understood categories, in order to potentiate the drivers and reduce the barriers effectively. The groupings could be used as benchmarks in similar studies in developing countries.


2022 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Hashim Ibrahimkhil ◽  
Laith Hadidi

PurposeThe aim of this paper is to assess the safety level of construction sites in Afghanistan following the US Army Corps of Engineers (USACE) safety practices and compare this with other construction sites in Afghanistan that follow local government safety guidelines. The USACE oversees and funds many infrastructure projects in Afghanistan, and these projects are supposed to follow the same standards implemented in the USA, including safety standards. The local government of Afghanistan also funds infrastructure projects in Afghanistan; however, these do not follow USACE best practices. This research explores the question of whether the USACE standards provide a safer construction site. The effect of the USACE standards on safety practices in construction projects is also investigated in the Afghanistan construction industry.Design/methodology/approachA literature review and other safety checklists were used to develop a safety checklist containing 104 items (questions) in 17 categories. Subsequently, the checklist was used to assess the safety performance of 57 construction projects (25 USACE projects, and 32 governmental projects). Utilizing quantitative analysis, the Spearman rank correlation coefficient (Rho) and Mann–Whitney tests were carried out for correlation and statistical disparity between USACE and governmental projects.FindingsThe safety performance level of Afghan government projects was found to be poor in relation to other developing countries, while in USACE projects it was excellent. In addition, fire prevention, safety administration, PPE, heavy equipment, and handling and storage of materials for all types of contractors were the most overlooked aspects of Afghan Government projects.Practical implicationsThe findings clearly demonstrate the deficiencies in construction sites observed during this study and also support the adoption of USACE standards in Afghanistan projects.Originality/valueTo the best of the authors’ knowledge, this study is the first to investigate the safety of construction sites in Afghanistan. The study also demonstrates the benefits of adopting international standards (USACE) to improve the safety of construction sites in a developing country such as Afghanistan. The findings provide evidence of the safety of the Afghanistan construction industry compared to other developing countries. These findings will contribute to the Afghan Government's efforts to track injury statistics.


2019 ◽  
Vol 26 (3) ◽  
pp. 386-407 ◽  
Author(s):  
Abid Hasan ◽  
Kumar Neeraj Jha

PurposeDelays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy. However, previous studies have shown that inadequate understanding and wrong implementation of schedule I/D provisions could result in unintended results. Moreover, the use of the I/D contracting method is in its initial stages in many countries such as India. The purpose of this paper is to identify various factors that are essential for schedule I/D success in construction projects.Design/methodology/approachA questionnaire survey was conducted among experienced professionals (clients, contractors and consultants) from across the Indian construction industry.FindingsTop success factors related to clients in the descending order of their importance are: realistic targets; detailed guidelines for I/D implementation; close coordination with other stakeholders; correct estimation of I/D duration and amount; and imposing disincentives after due consideration. Meanwhile, factors related to contractor organisations are: continuous monitoring and control; thorough understanding of schedule I/D targets; specific considerations in appointing senior project personnel; effective communication; and proper labour management.Research limitations/implicationsThis empirical research was conducted in the Indian construction industry. Similar studies from developed construction markets may provide more insights into the successful use of schedule I/D provisions in construction projects.Practical implicationsThe uptake of these recommendations is likely to increase the success of schedule I/D provisions in construction projects, especially in developing countries where the use of I/D contracting strategy is not very popular.Originality/valueThis research highlights the specific roles of both clients and contractors in the success of schedule I/D projects in developing countries such as India.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Muhammad T. Hatamleh ◽  
Gary P. Moynihan ◽  
Robert G. Batson ◽  
Ammar Alzarrad ◽  
Olugbenro Ogunrinde

PurposeRisk impedes the success of construction projects in developing countries due to planning in an unpredictable and poorly resourced environment. Hence, the literature suggests that practitioners are not fully aware of how important the risk identification process is. Some of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry. Therefore, this study highlights this process and identifies the key risks that affect the Jordanian construction industry.Design/methodology/approachThis study adopted an exploratory sequential mixed approach, two rounds of face-to-face interviews that were conducted in Jordan among 12 experts followed by a questionnaire randomly distributed to 122 practitioners. This study utilized the relative importance index, coefficient of variation, and Mann–Whitney (U) to analyze the data. Also, the factor analysis technique was used to identify and regroup the risk factors to further understand the correlation among the risks.FindingsThe result revealed an agreement among contractors’ and consultants’ responses toward allocating risks. Furthermore, several risks can be traced back to the project communication management process, highlighting a deficiency in the process. Also, four-factor groups were established, the first group includes the risk of defective design, late decisions making by other project participants and poor coordination with the subcontractor. The second group has only the risk of corruption, including bribery at sites. The third group includes stakeholders’ financial instability and inadequate distribution of responsibilities and risks. The fourth group includes adverse weather conditions and the use of illegal foreign labor.Originality/valueSome of the prior studies identified risks in developing countries without highlighting how they can be beneficial to the practitioners in the industry.


Author(s):  
Bernard Tuffour Atuahene ◽  
Sittimont Kanjanabootra ◽  
Thayaparan Gajendran

Big data applications consist of i) data collection using big data sources, ii) storing and processing the data, and iii) analysing data to gain insights for creating organisational benefit. The influx of digital technologies and digitization in the construction process includes big data as one newly emerging digital technology adopted in the construction industry. Big data application is in a nascent stage in construction, and there is a need to understand the tangible benefit(s) that big data can offer the construction industry. This study explores the benefits of big data in the construction industry. Using a qualitative case study design, construction professionals in an Australian Construction firm were interviewed. The research highlights that the benefits of big data include reduction of litigation amongst projects stakeholders, enablement of near to real-time communication, and facilitation of effective subcontractor selection. By implication, on a broader scale, these benefits can improve contract management, procurement, and management of construction projects. This study contributes to an ongoing discourse on big data application, and more generally, digitization in the construction industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Charles Igwe ◽  
Fuzhan Nasiri ◽  
Amin Hammad

PurposeThis study highlights the findings of an empirical study to investigate waste factors (WFs) affecting the performance and delivery of construction projects in developing countries. The objectives of this study are to identify non-physical WFs in developing nations and rank the identified factors based on their degree of influence on the key performance indicators (KPIs) of cost, quality and time.Design/methodology/approachIn total, 34 WFs were identified through a detailed literature review and consolidated using semi-structured interviews with construction practitioners. The statistical analysis involved a normality test using the Shapiro–Wilk test to determine if sample data have been drawn from a normally distributed population, ranking the WFs using the Frequency Index (FI), Severity Index (SI) and Importance Index (IMPI), ranking the WFs based on their effect on the project KPIs of cost, quality and time, and identify clustering structures for the identified WFs to using factor analysis (FA).FindingsThe results revealed ineffective planning and scheduling, rework/repair of defective work and resource quality problems (human, material and equipment) as the three most important WFs affecting construction projects. The factor analyses showed that WFs can be grouped into five interrelated components, suggesting the need for integrated and holistic strategies to overcome the identified WF.Practical implicationsUnderstanding the effects of WFs on construction projects is a first step towards designing holistic solutions to ensuring projects deliver value to the clients and other stakeholders. The findings of this study provide direction to construction practitioners on where to focus appropriate strategies to manage the identified WFs effectively and, therefore, improve the productivity of construction projects.Originality/valueThis study provides the first holistic analysis of WFs affecting the productivity of construction projects in developing countries.


2019 ◽  
Vol 17 (1) ◽  
pp. 250-264 ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi

Purpose This paper aims to assess the drivers of value management (VM) in the Nigerian construction industry with a view to identify the critical ones through Delphi study. Design/methodology/approach A team of 15 carefully selected experts in VM were engaged in two rounds of Delphi survey, and the responses of the survey were analyzed with descriptive statistics (mean, standard deviation and mode). Kendall’s coefficient of concordance test and Chi-square (χ2) test were also used to test the level of consensus amongst the respondents at the two rounds of the survey to draw inference. Interrater agreement analysis and significant level analysis were further used to determine the criticality of critical drivers. Findings The critical drivers to VM adoption are adequate understanding of the benefits of VM, higher/postgraduate programme that teaches VM technique, professional’s previous experience with VM, collaboration of all construction professional bodies in Nigeria and VM training. Originality/value This paper used opinions of VM experts only to achieve the aim of this study as against the common survey method in which respondents who are not knowledgeable in the area of research might fill the questionnaire.


2012 ◽  
Vol 4 (2) ◽  
pp. 11-18 ◽  
Author(s):  
Therese Daddow ◽  
Martin Skitmore

Despite its obvious theoretical benefits, there has been some reservations regarding the practical implementation of Value Management (VM) for construction projects. In particular, these concerns the extra time and costs involved in conducting VM in relation to the actual benefits gained as a consequence of its use. This paper provides the result of an interview survey of the experiences and observations of 17 professionals working in the property and construction industry to establish the extent to which this is an issue. The main conclusion is that the process is working well, with VM being popular among those with experience in its use - which has been extended into the area of consultant selection. However, in contrast with the prescriptive literature, much of the participants' experiences appear to be more concerned with VM's contribution to the identification and management of the risks involved in project delivery than the straight value-for-money aspects. This may be due to the higher levels of uncertainty involved in construction work than in VM's original use in construction.