PurposeIn developing countries, such as Brazil, the construction sector is consistently focused on the construction of new buildings, and there is no dissemination of the preservation, restoration and maintenance of historic buildings. Idle buildings, due to the use and lack of maintenance, present pathological manifestations, such as moisture problems that compromise specially their thermal and energy performance. With this in mind, the purpose of this work is to create a digital model using terrestrial photogrammetry and suggest retrofit interventions based on computer simulation to improve the thermal and energy performance of a historical building.Design/methodology/approachThe proposed methodology combined terrestrial photogrammetry using common smartphones and commercial software for historical buildings with building information modeling (historic building information modeling (HBIM)) and building energy modeling (BEM). The approach follows five steps: planning, site visit, data processing, data modeling and results. Also, as a case study, the School of Architecture and Urbanism of the Fluminense Federal University, built in 1888, was chosen to validate the approach.FindingsA digital map of pathological manifestations in the HBIM model was developed, and interventions considering the application of expanded polystyrene in the envelope to reduce energy consumption were outlined. From the synergy between HBIM and BEM, it was concluded that the information modeled using photogrammetry was fundamental to create the energy model, and simulations were needed to optimize the possible solutions in terms of energy consumption.Originality/valueFirstly, the work proposes a reasonable methodology to be applied in development countries without sophisticated technologies, but with acceptable precision for the study purpose. Secondly, the presented study shows that the use of HBIM for energy modeling proved to be useful to simulate possible solutions that optimize the thermal and energy performance.

2020 ◽  
Vol 27 (9) ◽  
pp. 2409-2427
Author(s):  
Honglei Liu ◽  
Jiule Song ◽  
Guangbin Wang

PurposeWith the increasing attention acquired from researchers and practitioners in Architecture, Engineering and Construction (AEC) industry, building information modeling (BIM) has fundamentally changed the approach we design, construct and delivery, as well as operate and maintenance of buildings and civil infrastructures. This study tries to provide an innovative perspective on BIM research. This study aims to analyze the necessity and feasibility of BIM user satisfaction research and define what BIM user satisfaction is, and then to develop a quantitative method for the measurement of BIM user satisfaction.Design/methodology/approachAs it is indicated in the content, BIM user satisfaction is measured by the sum of the user's weighted reactions to a set of factors. To be specific, the entropy method was adopted to calculate the “weighting” of the factors, and the triangular fuzzy number (TFN) method was selected to compute the “scoring” of the factors. Through the literature review, methodology and tool development, as well as case study and discussions, this paper was generated sequentially.FindingsThis study found that the proposed tool for the measurement of BIM success is valid and reliable; it formerly translated the conceptual definition of BIM user satisfaction into an accurate measurement instrument. It also indicated that many factors are affecting the BIM users' satisfaction, and each of the factors inherited various importance and score, and the findings are expected to improve the performance and effectiveness of BIM management.Originality/valueThrough the translation of the conceptual BIM user satisfaction into a valid quantitative measurement instrument, this research provides an excellent framework for the management of BIM from the user's perspective, and it could help to stimulate user's acceptance of BIM in the AEC industry in future.


Facilities ◽  
2016 ◽  
Vol 34 (3/4) ◽  
pp. 233-246 ◽  
Author(s):  
Alireza Golabchi ◽  
Manu Akula ◽  
Vineet Kamat

Purpose Organizations involved in facility management (FM) can use building information modeling (BIM) as a knowledge repository to document evolving facility information and to support decisions made by the facility managers during the operational life of a facility. Despite ongoing advances in FM technologies, FM practices in most facilities are still labor intensive, time consuming and often rely on unreliable and outdated information. To address these shortcomings, the purpose of this study is to propose an automated approach that demonstrates the potential of using BIM to develop algorithms that automate decision-making for FM applications. Design/methodology/approach A BIM plug-in tool is developed that uses a fault detection and diagnostics (FDD) algorithm to automate the process of detecting malfunctioning heating, ventilation, and air conditioning (HVAC) equipment. The algorithm connects to a complaint ticket database and automates BIM to determine potentially damaged HVAC system components and develops a plan of action for the facility inspectors accordingly. The approach has been implemented as a case study in an operating facility to improve the process of HVAC system diagnosis and repair. Findings By implementing the proposed application in a case study, the authors found that automated BIM approaches such as the one developed in this study, can be highly beneficial in FM practices by increasing productivity and lowering costs associated with decision-making. Originality/value This study introduces an innovative approach that leverages BIM for automated fault detection in operational buildings. FM personnel in charge of HVAC inspection and repair can highly benefit from the proposed approach, as it eliminates the time required to locate HVAC equipment at fault manually.


2020 ◽  
Vol 27 (8) ◽  
pp. 1679-1702
Author(s):  
Hong Xian Li ◽  
Zhiliang Ma ◽  
Hexu Liu ◽  
Jun Wang ◽  
Mohamed Al-Hussein ◽  
...  

PurposeThe operational phase of a building's lifecycle is receiving increasing attention, as it consumes an enormous amount of energy and results in tremendous detrimental impacts on the environment. While energy simulation can be applied as a tool to evaluate the energy performance of a building in operation, the emergence of Building Information Modeling (BIM) technology is expected to facilitate the evaluation process with predefined and enriched building information. However, such an approach has been confronted by the challenge of interoperability issues among the related application software, including the BIM tools and energy simulation tools, and the results of simulation have been seldom verified due to the unavailability of corresponding experimental data. This study aims to explore the interoperability between the commonly used energy simulation and BIM tools and verifies the simulation approach by undertaking a case study.Design/methodology/approachWith Autodesk Revit and EnergyPlus selected as the commonly used BIM and energy simulation tools, respectively, a valid technical framework of transferring building information between two tools is proposed, and the interoperability issues that occur during the data transfer are studied. The proposed framework is then employed to simulate the energy consumption of a single-family house, and sensitivity analysis and analysis on such parameters as schedule are conducted for building operations to showcase its applicability.FindingsThe simulation results are compared with monitored data and the results from another simulation tool, HOT2000; the comparison reveals that EnergyPlus and HOT2000 predict the total energy consumption with a difference from the monitoring data of 8.0 and 7.1%, respectively.Practical implicationsThis research shows how to efficiently use BIM to support building energy simulation. Relevant stakeholders can learn from this research to avoid data loss during BIM model transformation.Originality/valueThis research explores the application of BIM for building energy simulation, compares the simulation results among different tools and validates simulation results using monitored data.


2019 ◽  
Vol 27 (1) ◽  
pp. 227-244 ◽  
Author(s):  
Xiaofeng Liao ◽  
Cen Ying Lee ◽  
Heap-Yih Chong

Purpose The management of building information modeling (BIM)-enabled construction projects is challenging and unstructured in nature, particularly in terms of contract administration. Even though previous studies have revealed various legal issues related to BIM, little is known regarding the contractual practices of BIM. Hence, the purpose of this paper is to explore the contractual practices between the BIM consultant and employer in detail. Design/methodology/approach An explanatory case study was carried out on four large BIM-enabled construction projects in China. Findings The contractual practices differed from one project to another in terms of ownership and intellectual property rights (IPRs) of the BIM model, roles of the BIM consultant, liability of the BIM consultant in the event of errors and delays of the BIM model, and BIM-related costs and payments. Some of the interesting findings are as follows: the employer shall retain the ownership and IPRs of the BIM model, the BIM consultant shall provide a warranty to ensure usability of the BIM model after project handover, the BIM consultant shall pay for damages or losses if the BIM model fails to deliver and the costs of BIM implementation shall be borne by both contracting parties. Originality/value This study provides a fresh, realistic insight on the development of plausible contractual practices between the BIM consultant and employer and the findings can be used to improve BIM contract protocols in future projects.


2019 ◽  
Vol 18 (4) ◽  
pp. 923-940
Author(s):  
Abdul Rahman Ahsan Usmani ◽  
Abdalrahman Elshafey ◽  
Masoud Gheisari ◽  
Changsaar Chai ◽  
Eeydzah Binti Aminudin ◽  
...  

Purpose Three dimensional (3 D) laser scanner surveying is widely used in many fields, such as agriculture, mining and heritage documentation and can be of great benefit for as-built documentation in construction and facility management domains. However, there is lack of applied research and use cases integrating 3 D laser scanner surveying with building information modeling (BIM) for existing facilities in Malaysia. This study aims to develop a scan to as-built BIM workflow to use 3 D laser scanner surveying and create as-built building information models of an existing complex facility in Malaysia. Design/methodology/approach A case study approach was followed to develop a scan to as-built BIM workflow through four main steps: 3 D laser scanning, data preprocessing, data registration and building information modeling. Findings This case study proposes a comprehensive scan to as-built BIM workflow which illustrates all the required steps to create a precise 3 D as-built building information model from scans. This workflow was successfully implemented to the Eco-Home facility at the Universiti Teknologi Malaysia. Originality/value Scan to as-built BIM is a digital alternative to manual and tedious process of documentation of as-built condition of a facility and provides a detail process using laser scans to create as-built building information models of facilities.


2021 ◽  
Vol 11 (4) ◽  
pp. 1855
Author(s):  
Franco Guzzetti ◽  
Karen Lara Ngozi Anyabolu ◽  
Francesca Biolo ◽  
Lara D’Ambrosio

In the construction field, the Building Information Modeling (BIM) methodology is becoming increasingly predominant and the standardization of its use is now an essential operation. This method has become widespread in recent years, thanks to the advantages provided in the framework of project management and interoperability. Hoping for its complete dissemination, it is unthinkable to use it only for new construction interventions. Many are experiencing what happens with the so-called Heritage Building Information Modeling (HBIM); that is, how BIM interfaces with Architectural Heritage or simply with historical buildings. This article aims to deal with the principles and working methodologies behind BIM/HBIM and modeling. The aim is to outline the themes on which to base a new approach to the instrument. In this way, it can be adapted to the needs and characteristics of each type of building. Going into the detail of standards, the text also contains a first study regarding the classification of moldable elements. This proposal is based on current regulations and it can provide flexible, expandable, and unambiguous language. Therefore, the content of the article focuses on a revision of the thinking underlying the process, also providing a more practical track on communication and interoperability.


Energies ◽  
2021 ◽  
Vol 14 (14) ◽  
pp. 4100
Author(s):  
Mariana Huskinson ◽  
Antonio Galiano-Garrigós ◽  
Ángel Benigno González-Avilés ◽  
M. Isabel Pérez-Millán

Improving the energy performance of existing buildings is one of the main strategies defined by the European Union to reduce global energy costs. Amongst the actions to be carried out in buildings to achieve this objective is working with passive measures adapted to each type of climate. To assist designers in the process of finding appropriate solutions for each building and location, different tools have been developed and since the implementation of building information modeling (BIM), it has been possible to perform an analysis of a building’s life cycle from an energy perspective and other types of analysis such as a comfort analysis. In the case of Spain, the first BIM environment tool has been implemented that deals with the global analysis of a building’s behavior and serves as an alternative to previous methods characterized by their lack of both flexibility and information offered to designers. This paper evaluates and compares the official Spanish energy performance evaluation tool (Cypetherm) released in 2018 using a case study involving the installation of sunlight control devices as part of a building refurbishment. It is intended to determine how databases and simplifications affect the designer’s decision-making. Additionally, the yielded energy results are complemented by a comfort analysis to explore the impact of these improvements from a users’ wellbeing viewpoint. At the end of the process the yielded results still confirm that the simulation remains far from reality and that simulation tools can indeed influence the decision-making process.


2021 ◽  
Vol 13 (14) ◽  
pp. 7990
Author(s):  
Suman Paneru ◽  
Forough Foroutan Jahromi ◽  
Mohsen Hatami ◽  
Wilfred Roudebush ◽  
Idris Jeelani

Traditional energy analysis in Building Information Modeling (BIM) only accounts for the energy requirements of building operations during a portion of the occupancy phase of the building’s life cycle and as such is unable to quantify the true impact of buildings on the environment. Specifically, the typical energy analysis in BIM does not account for the energy associated with resource formation, recycling, and demolition. Therefore, a comprehensive method is required to analyze the true environmental impact of buildings. Emergy analysis can offer a holistic approach to account for the environmental cost of activities involved in building construction and operation in all its life cycle phases from resource formation to demolition. As such, the integration of emergy analysis with BIM can result in the development of a holistic sustainability performance tool. Therefore, this study aimed at developing a comprehensive framework for the integration of emergy analysis with existing Building Information Modeling tools. The proposed framework was validated using a case study involving a test building element of 8’ × 8’ composite wall. The case study demonstrated the successful integration of emergy analysis with Revit®2021 using the inbuilt features of Revit and external tools such as MS Excel. The framework developed in this study will help in accurately determining the environmental cost of the buildings, which will help in selecting environment-friendly building materials and systems. In addition, the integration of emergy into BIM will allow a comparison of various built environment alternatives enabling designers to make sustainable decisions during the design phase.


Energies ◽  
2020 ◽  
Vol 13 (20) ◽  
pp. 5519
Author(s):  
Sanjin Gumbarević ◽  
Ivana Burcar Dunović ◽  
Bojan Milovanović ◽  
Mergim Gaši

With the increasing number of nearly zero-energy buildings (NZEB) due to increase of global awareness on climate change, the new concepts of design and control must be developed because of great NZEB dependency on detailing and multidisciplinary approach. This paper proposes a three-level gateway control method for NZEB project delivery by using digital representation of the building in building information modeling (BIM) environment. These controls (C1, C2 and C3) are introduced before three main phases of any project delivery—design phase, construction phase and handover. The proposed project control procedure uses black-box building energy modeling within the BIM environment, so the paper explores the reliability of one tool for direct energy modeling within the BIM-authoring software. The paper shows two types of validation tests with satisfactory results. This leads to conclusion that analyzed tool for energy simulation within BIM environment can be used in a way that is described in a proposed project control procedure. For further research it is proposed to explore reliability of tools for energy simulation connected to other BIM-authoring software, so this project control procedure could be independent of BIM-authoring software used in the paper.