scholarly journals Performance indicators for public private partnership (PPP) projects in Malaysia

2018 ◽  
Vol 34 (2) ◽  
pp. 137-152 ◽  
Author(s):  
Rosnani Mohamad ◽  
Suhaiza Ismail ◽  
Julia Mohd Said

Purpose The purpose of this paper is twofold: first, to identify the important performance indicators used in assessing public private partnership (PPP) performance in terms of the two aspects of PPP which are “financing and markets” and “innovation and learnings”; and second, to investigate the differences in the perception between public and private sectors on the importance of performance indicators in terms of the two aspects of PPP. Design/methodology/approach Using a questionnaire survey, 237 completed questionnaires were received representing 51.52 per cent response rate. In examining the importance of performance indicators, the descriptive statistical tests of mean, standard deviation and mean score ranking were used. The independent t-tests were conducted to investigate the differences in the perceptions between the two respondents’ groups on the importance of performance indicators. Findings In relation to the two areas of indicators used in assessing PPP performance, the findings show that the top three important performance indicators for financing and markets are: “Operational cost”, “Construction cost” and “Construction period”. While the top three important performance indicators for innovation and learning are: “Technology innovation”, “Employee training” and “Financial innovation”. In terms of the differences in the perceptions between the public and private sector groups, the test results indicate that there is only one significant statistical difference for each aspect of performance indicators. Originality/value This study offers empirical evidence on key financial performance indicators for PPP projects as perceived by two key parties in a PPP contract that are public and private sectors.

2014 ◽  
Vol 4 (3) ◽  
pp. 238-250 ◽  
Author(s):  
Suhaiza Ismail ◽  
Fatimah Azzahra Haris

Purpose – The purpose of this paper is to study two objectives. First, it intends to scrutinize the challenges in implementing Public Private Partnership (PPP) by examining the factors that hinder the successful adoption of PPP in Malaysia. Second, it aims to investigate the differences in the perceptions of the government and the private sector pertaining to the hindrance factors. Design/methodology/approach – A questionnaire survey was used to elicit the perceptions of the public and private sectors concerning the constraints of PPP implementation in Malaysia. A total of 122 usable responses were obtained, which were analysed using Statistical Package for Social Sciences software. The mean score and mean score ranking were used to examine the importance of the hindrance factors based on the overall responses as well as on the respective responses of the public and the private sectors. An independent sample t-test was used to examine the differences in the perceptions between the two sectors. Findings – The overall results show that “lengthy delays in negotiation”, “lack of government guidelines and procedures on PPP”, “higher charge to direct users”, “lengthy delays because of political debate” and “confusion over government objectives and evaluation criteria” are the top five constraints for adopting PPP in Malaysia. In terms of the differences in the perceptions between the public and private sector groups, the statistical test results indicate that there are only significant differences in the perceptions for two hindrance factors. Originality/value – The paper contributes to the existing literature on PPP, which is currently limited, by focusing on the challenges of implementing PPP in a developing country (i.e. Malaysia). More importantly, this paper provides evidence concerning the differences in the opinion of two key players (i.e. the government and the private sector) on the PPP hindrance factors.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Danrong Song ◽  
Jinbo Song ◽  
Hehui Yuan ◽  
Yu Fan

PurposeWith the growing demand for infrastructure and public services in recent years, PPP-UP have attracted a great deal of attention. However, while the user focuses on the payment for use and the private sector is concerned with its return on investment, the public sector pays more attention to the efficient utilization of public funds. In order to analyze the willingness of each stakeholder to join PPP-UP, an evolutionary game model involving the three parties is constructed.Design/methodology/approachAn evolutionary game model is established that considers the users and the public and private sectors in user-pay public-private-partnership projects (PPP-UP). Eight scenarios of equilibriums and the game's evolutionary stable strategies are analyzed, and the corresponding stability conditions are then obtained. A situation where all three players are willing to cooperate in theory is also examined. The key influencing parameters that affect cooperation behaviors are further discussed.FindingsFirst, the results illustrate that by properly adjusting the influencing factors, the cooperation status among the three parties can be changed along with certain evolutionary trends. Second, it is hard to modify unsatisfactory evolutionary stability by small changes in both the price compensation of and the construction and operation compensation. Third, it is necessary to involve the users in the decision-making process in PPP-UP and take their demands regarding benefits and payments into account.Originality/valueIn this paper, we focus on PPP-UP to research interactions among the public and private sectors and the users. Based on the analysis of the evolutionary game, to facilitate the successful implementation and development of a project, several conditions are needed to ensure tripartite cooperation. Several recommendations are then proposed for decision-makers in PPP-UP.


2014 ◽  
Vol 41 (10) ◽  
pp. 994-1010 ◽  
Author(s):  
Abouzar Zangoueinezhad ◽  
Adel Azar

Purpose – Public-private partnership (PPP) is mutually beneficial relationships that are formed between the public and private sectors. The private-sector partner typically makes a substantial equity investment, and in return the public sector gains access to new or improved services. When properly vetted and structured, PPP allocate risk to the party best suited to handle it. The purpose of this paper is to examine the relationship between the scale and nature of the PPP's contribution as a driver of the economic growth and gross domestic product (GDP). Design/methodology/approach – Using statistics causality modeling and relevant statistical techniques, the dynamic interactions and interdependencies over PPP and economic growth were addressed and quantified. Findings – Although PPP can free up government resources for other public priorities, three key factors enable PPP to stimulate a country's economic growth: the number of PPP projects under way, the value of PPP projects, and the ideal type of PPP contracts in use. Originality/value – The number, value, and type of PPP, combined with supportive policies, power economic growth. Governments with well-established and enforced policies against corruption, combined with low business transaction costs, a transparent legislative system, and exchange rate and monetary stability are far more attractive to the private sector.


Author(s):  
Rogers Mwesigwa ◽  
Vincent Bagire ◽  
Joseph Mpeera Ntayi ◽  
John C. Munene

Purpose The purpose of this paper is to assess stakeholder management antecedents in public private partnership (PPP) projects in Uganda. Design/methodology/approach This study is cross sectional and quantitative in nature. Data were collected by means of a questionnaire survey from a sample of 94 PPP projects in Uganda. Stratified random sampling was used in selecting projects for this study. Smart PLS–SEM was used for analysis. Findings Results from the study show that the key antecedents of stakeholder management include; communication, engagement, commitment and trust. Communication was found to be the strongest antecedent of stakeholder management. Results also show that trust and commitment are insignificantly associated with stakeholder management in PPP projects. Research limitations/implications This paper is limited to the antecedents of stakeholder management in PPP projects in Uganda. Further studies should be conducted in the public and private sectors where there are also multiple stakeholders. Practical implications The paper has documented the antecedents of stakeholder management in PPP projects in Uganda. The results will help project managers and policy makers appreciate the different antecedents of stakeholder management and how they are important in managing interests and expectations of different stakeholders. Originality/value This research focused on the key antecedents of stakeholder management in PPP projects within the Ugandan context.


2019 ◽  
Author(s):  
Md. Mahmudul Alam ◽  
Abu Rashed

In spite of the complexity in defining the boundary, the concept of Economic Zones (EZ) has been evolved as a way forward for the government of the developing countries for enhancing the national trade. Similarly the recent phenomenon of widespread Public Private Partnership (PPP) practices especially in infrastructure sector is also providing a window to develop many of such economic zones through PPP model as EZ typically is capital intensive. Bangladesh has discrete success both under PPP and EZ regime. However, developing EZ under PPP model has few commercial complexities as both the public and private sector need to bear some roles and obligations one of which is selection of appropriate location for EZ development. The location study for PPP EZ development therefore receives paramount attention both from developer and lenders perspective. Such location study generally is not typical project site study by nature, rather it is more economic concentrated. This paper will try to identify the factors that are essential to consider for conducting these location studies based on the examples of Bangladesh. The paper will also identify the appropriate methods and approaches required for successful EZ development through PPP.


2018 ◽  
Vol 16 (1) ◽  
pp. 161-191 ◽  
Author(s):  
Akintayo Opawole

Purpose The purpose of this study is to develop penalty measures against concessionaires’ defaults as a mechanism for protecting the interests of parties (public and private) in public–private partnership (PPP) contracts for enhancing project delivery. Design/methodology/approach The research methodology is a mixed qualitative and quantitative approach. This study commenced with an in-depth literature review, which provided the basis for identification of penalty measures in construction contract management. The qualitative assessment was based on semi-structured face-to-face interviews, which were aimed at identifying the underlying pattern of the penalty measures, and the quantitative assessment was based on a structured questionnaire. In both cases, respondents were stakeholders’ organizations that had been involved in PPP contracts in the southwestern region of Nigeria. These include industrial practitioners from government-based organizations (ministries, agencies, corporations/parastatals, etc.), private developers/concessionaires, law firms, banks, etc. The sample size was selected using a respondent-driven sampling approach, as the comprehensive lists of the participants in PPP contracts are not readily available in the Nigerian construction industry. Responses from the interview were analysed using interpretative phenomenal analysis via ATLAS.ti7. The quantitative data were analysed using percentile for flexibility between “most” and “more” preferred mechanisms. Findings This study developed mechanisms that defined the rights of the public party to redress underperformance of PPP contracts consequent to the defaults of the private party. “Step-in-right” and “termination of the contracts” were preferred against specific cases of “delayed execution”, “abandonment of the project”, “bankruptcy of the concessionaire” and “non-compliance with design and specifications”. With respect to “shortfall in performance against established dates”, the results converged on “monetary fine” and diverged on “step-in-right” and “termination of the contracts”. Practical implications The study contributes to literature on mechanisms for enforcing PPP project performance. Besides, defining rights and obligations of the parties in specific events of underperformance of the concessionaires in PPP contracts is a significant step towards the development of standard conditions of contract for managing PPP projects in which the model is being newly adopted. Originality/value Project management studies on PPP were extended by defining the liabilities that are consequent to the defaults of the private party and the mechanisms for their enforcement.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Suhaiza Ismail ◽  
Rosnani Mohamad ◽  
Julia Mohd Said

PurposeThis paper has two objectives. The first objective is to examine the important performance indicators of the lifecycle process of public private partnership (PPP) projects. The second objective is to investigate the difference in the perception of the importance of the performance indicators between the public and private sectors.Design/methodology/approachTo achieve the research objectives, the study used a questionnaire survey. The questionnaire was distributed via postal mail to officers of government departments and private sector companies who may have been involved in PPP projects. A total of 237 completed questionnaires were received, representing a 51.52% response rate. To examine the importance of performance indicators, the descriptive statistical tests of mean, standard deviation and mean score ranking were used. Independent t-tests were conducted to investigate the differences in the perceptions of the importance of performance indicators between the two respondent groups.FindingsThe findings show that all the 16 performance indicators are perceived as important and very important. The top five important performance indicators for a PPP project lifecycle process are “Time management”, “Contractual management”, “Cost management”, “Safety management” and “Effective risk management system”, while “stress or conflicts management” is the least important. In terms of the differences in the perception of the public and private sector groups, the results indicate that four indicators (“environment protection”, “cost management”, “effective risk management system” and “good work environment”), show a significant statistical difference between the perception of the public and the private sector respondents.Originality/valueThis study offers empirical evidence on key performance indicators for a PPP project that are crucial throughout its lifecycle as perceived by two key parties in a PPP contract, i.e. the public and the private sectors.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Moumita Acharyya ◽  
Tanuja Agarwala

PurposeThe paper aims to understand the different motivations / reasons for engaging in CSR initiatives by the organizations. In addition, the study also examines the relationship between CSR motivations and corporate social performance (CSP).Design/methodology/approachThe data were collected from two power sector organizations: one was a private sector firm and the other was a public sector firm. A comparative analysis of the variables with respect to private and public sector organizations was conducted. A questionnaire survey was administered among 370 employees working in the power sector, with 199 executives from public sector and 171 from private sector.Findings“Philanthropic” motivation emerged as the most dominant CSR motivation among both the public and private sector firms. The private sector firm was found to be significantly higher with respect to “philanthropic”, “enlightened self-interest” and “normative” CSR motivations when compared with the public sector firms. Findings suggest that public and private sector firms differed significantly on four CSR motivations, namely, “philanthropic”, “enlightened self-interest”, “normative” and “coercive”. The CSP score was significantly different among the two power sector firms of public and private sectors. The private sector firm had a higher CSP level than the public sector undertaking.Research limitations/implicationsFurther studies in the domain need to address differences in CSR motivations and CSP across other sectors to understand the role of industry characteristics in influencing social development targets of organizations. Research also needs to focus on demonstrating the relationship between CSP and financial performance of the firms. Further, the HR outcomes of CSR initiatives and measurement of CSP indicators, such as attracting and retaining talent, employee commitment and organizational climate factors, need to be assessed.Originality/valueThe social issues are now directly linked with the business model to ensure consistency and community development. The results reveal a need for “enlightened self-interest” which is the second dominant CSR motivation among the organizations. The study makes a novel contribution by determining that competitive and coercive motivations are not functional as part of organizational CSR strategy. CSR can never be forced as the very idea is to do social good. Eventually, the CSR approach demands a commitment from within. The organizations need to emphasize more voluntary engagement of employees and go beyond statutory requirements for realizing the true CSR benefits.


2006 ◽  
Vol 53 (3) ◽  
pp. 299-311 ◽  
Author(s):  
Viktorija Bojovic

This paper discusses recent changes in the way public services are delivered A marked increase in the cooperation between the public and private sector in the realization of complex projects, mostly concerning development of infrastructure, is the main characteristic of present-day developing economies. The creation of new, innovative agreements is driven by the limitation of public funds and an ever-growing demand for an increase in the quality of public services. Looking upon the western economies experience alternatives to the traditional public sector procurement are identified in the public/private partnership. The public/private partnership can be seen as one component in the rearrangement of the public sector with a management culture that focuses on the citizen or customer. Also included in this are accountability for results, investigation of a wide variety of alternative service delivery mechanisms, and competition between public and private bodies for contracts to deliver services consistent with cost recovery and the achievement of value for money. The partnership can be realized through an array of models and in this paper priority is given to the DBFO (design-build-finance-operate) model, due to its importance in implementation. The DBFO model is considered to be a synonym for the public/private partnership, as it is the most suitable for complex projects and gains the most benefits.


2022 ◽  
Vol 7 (2) ◽  
pp. 111-120 ◽  
Author(s):  
Mohammed Shakil Malek ◽  
Laxmansinh Zala

The objective of this paper was to have a study on the perceptions of stakeholders of Public-Private Partnership (PPP) projects for factors affecting the attractiveness of road projects in India. A questionnaire survey was conducted among major PPP project participants of Indian PPP road projects. Fifteen attractive factors were shortlisted through a literature survey for designing the questionnaire. Collected data was analyzed with factor analysis and descriptive statistical analysis. The findings resulted in three components: effectiveness of the private sector, effective time and cost management, and the public sector’s economic benefit. Eight factors were identified as highly affecting the attractiveness of PPP in Indian road projects. PPP provides ample diversity of net benefits to both the public and private sectors. During the project development stage, both sectors have to formulate decisions based on appropriate assessment criteria. Therefore, the reflection of attractive factors will assist the public-sector to select PPP in the road sector. It also helps to establish the strategy for road projects using PPP.


Sign in / Sign up

Export Citation Format

Share Document