Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Suhaiza Ismail ◽  
Rosnani Mohamad ◽  
Julia Mohd Said

PurposeThis paper has two objectives. The first objective is to examine the important performance indicators of the lifecycle process of public private partnership (PPP) projects. The second objective is to investigate the difference in the perception of the importance of the performance indicators between the public and private sectors.Design/methodology/approachTo achieve the research objectives, the study used a questionnaire survey. The questionnaire was distributed via postal mail to officers of government departments and private sector companies who may have been involved in PPP projects. A total of 237 completed questionnaires were received, representing a 51.52% response rate. To examine the importance of performance indicators, the descriptive statistical tests of mean, standard deviation and mean score ranking were used. Independent t-tests were conducted to investigate the differences in the perceptions of the importance of performance indicators between the two respondent groups.FindingsThe findings show that all the 16 performance indicators are perceived as important and very important. The top five important performance indicators for a PPP project lifecycle process are “Time management”, “Contractual management”, “Cost management”, “Safety management” and “Effective risk management system”, while “stress or conflicts management” is the least important. In terms of the differences in the perception of the public and private sector groups, the results indicate that four indicators (“environment protection”, “cost management”, “effective risk management system” and “good work environment”), show a significant statistical difference between the perception of the public and the private sector respondents.Originality/valueThis study offers empirical evidence on key performance indicators for a PPP project that are crucial throughout its lifecycle as perceived by two key parties in a PPP contract, i.e. the public and the private sectors.

2014 ◽  
Vol 41 (10) ◽  
pp. 994-1010 ◽  
Author(s):  
Abouzar Zangoueinezhad ◽  
Adel Azar

Purpose – Public-private partnership (PPP) is mutually beneficial relationships that are formed between the public and private sectors. The private-sector partner typically makes a substantial equity investment, and in return the public sector gains access to new or improved services. When properly vetted and structured, PPP allocate risk to the party best suited to handle it. The purpose of this paper is to examine the relationship between the scale and nature of the PPP's contribution as a driver of the economic growth and gross domestic product (GDP). Design/methodology/approach – Using statistics causality modeling and relevant statistical techniques, the dynamic interactions and interdependencies over PPP and economic growth were addressed and quantified. Findings – Although PPP can free up government resources for other public priorities, three key factors enable PPP to stimulate a country's economic growth: the number of PPP projects under way, the value of PPP projects, and the ideal type of PPP contracts in use. Originality/value – The number, value, and type of PPP, combined with supportive policies, power economic growth. Governments with well-established and enforced policies against corruption, combined with low business transaction costs, a transparent legislative system, and exchange rate and monetary stability are far more attractive to the private sector.


2014 ◽  
Vol 4 (3) ◽  
pp. 238-250 ◽  
Author(s):  
Suhaiza Ismail ◽  
Fatimah Azzahra Haris

Purpose – The purpose of this paper is to study two objectives. First, it intends to scrutinize the challenges in implementing Public Private Partnership (PPP) by examining the factors that hinder the successful adoption of PPP in Malaysia. Second, it aims to investigate the differences in the perceptions of the government and the private sector pertaining to the hindrance factors. Design/methodology/approach – A questionnaire survey was used to elicit the perceptions of the public and private sectors concerning the constraints of PPP implementation in Malaysia. A total of 122 usable responses were obtained, which were analysed using Statistical Package for Social Sciences software. The mean score and mean score ranking were used to examine the importance of the hindrance factors based on the overall responses as well as on the respective responses of the public and the private sectors. An independent sample t-test was used to examine the differences in the perceptions between the two sectors. Findings – The overall results show that “lengthy delays in negotiation”, “lack of government guidelines and procedures on PPP”, “higher charge to direct users”, “lengthy delays because of political debate” and “confusion over government objectives and evaluation criteria” are the top five constraints for adopting PPP in Malaysia. In terms of the differences in the perceptions between the public and private sector groups, the statistical test results indicate that there are only significant differences in the perceptions for two hindrance factors. Originality/value – The paper contributes to the existing literature on PPP, which is currently limited, by focusing on the challenges of implementing PPP in a developing country (i.e. Malaysia). More importantly, this paper provides evidence concerning the differences in the opinion of two key players (i.e. the government and the private sector) on the PPP hindrance factors.


2018 ◽  
Vol 34 (2) ◽  
pp. 137-152 ◽  
Author(s):  
Rosnani Mohamad ◽  
Suhaiza Ismail ◽  
Julia Mohd Said

Purpose The purpose of this paper is twofold: first, to identify the important performance indicators used in assessing public private partnership (PPP) performance in terms of the two aspects of PPP which are “financing and markets” and “innovation and learnings”; and second, to investigate the differences in the perception between public and private sectors on the importance of performance indicators in terms of the two aspects of PPP. Design/methodology/approach Using a questionnaire survey, 237 completed questionnaires were received representing 51.52 per cent response rate. In examining the importance of performance indicators, the descriptive statistical tests of mean, standard deviation and mean score ranking were used. The independent t-tests were conducted to investigate the differences in the perceptions between the two respondents’ groups on the importance of performance indicators. Findings In relation to the two areas of indicators used in assessing PPP performance, the findings show that the top three important performance indicators for financing and markets are: “Operational cost”, “Construction cost” and “Construction period”. While the top three important performance indicators for innovation and learning are: “Technology innovation”, “Employee training” and “Financial innovation”. In terms of the differences in the perceptions between the public and private sector groups, the test results indicate that there is only one significant statistical difference for each aspect of performance indicators. Originality/value This study offers empirical evidence on key financial performance indicators for PPP projects as perceived by two key parties in a PPP contract that are public and private sectors.


2020 ◽  
Vol 27 (6) ◽  
pp. 1401-1425
Author(s):  
Phuong Thi Le ◽  
Nicholas Chileshe ◽  
Konstantinos Kirytopoulos ◽  
Raufdeen Rameezdeen

PurposeThe Built Operate Transfer (BOT) model has been increasingly used in transportation investments in Vietnam. However, there is still an inadequacy of risk management applications in these projects and lack of research in this area. The study aims to improve the success of projects implemented through the BOT model in Vietnam.Design/methodology/approachThe study followed a sequential design including interviews and a questionnaire survey to investigate the perception of stakeholders from public and private sector regarding the probability of occurrence and the severity of impact of risks in BOT transportation projects in Vietnam. Quantitative data from the survey was subjected to descriptive and inferential statistics to explore the priority of risks as well as the differences in the perception between the public and private sectors.FindingsThe results showed that the top five most significant risks in BOT transportation projects in Vietnam are: (1) problems with land acquisition and compensation, (2) inappropriate location of toll booths, (3) public resistance to pay, (4) high toll rate and (5) lack of cash flow. With the exception of “lack of cash flow,” there were no statistically significant differences in the rankings of individual risks between the public and private sector. In addition, there is a significant positive correlation in the overall rankings of all risks for both sectors.Originality/valueThis study contributes to the body of knowledge by exploring the probability of occurrence and the severity of the impact of risks in BOT transportation projects in a developing country like Vietnam which has not been extensively explored yet. Second, it provides an insight into the perception of stakeholders from the public and private sector regarding the level of risks which is very useful for potential stakeholders in making decisions when they intend to participate in such partnerships. Third, it enables the Vietnamese government to establish suitable policies related to such projects. These contributions are very important in improving risk management in PPPs in developing countries.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Moumita Acharyya ◽  
Tanuja Agarwala

PurposeThe paper aims to understand the different motivations / reasons for engaging in CSR initiatives by the organizations. In addition, the study also examines the relationship between CSR motivations and corporate social performance (CSP).Design/methodology/approachThe data were collected from two power sector organizations: one was a private sector firm and the other was a public sector firm. A comparative analysis of the variables with respect to private and public sector organizations was conducted. A questionnaire survey was administered among 370 employees working in the power sector, with 199 executives from public sector and 171 from private sector.Findings“Philanthropic” motivation emerged as the most dominant CSR motivation among both the public and private sector firms. The private sector firm was found to be significantly higher with respect to “philanthropic”, “enlightened self-interest” and “normative” CSR motivations when compared with the public sector firms. Findings suggest that public and private sector firms differed significantly on four CSR motivations, namely, “philanthropic”, “enlightened self-interest”, “normative” and “coercive”. The CSP score was significantly different among the two power sector firms of public and private sectors. The private sector firm had a higher CSP level than the public sector undertaking.Research limitations/implicationsFurther studies in the domain need to address differences in CSR motivations and CSP across other sectors to understand the role of industry characteristics in influencing social development targets of organizations. Research also needs to focus on demonstrating the relationship between CSP and financial performance of the firms. Further, the HR outcomes of CSR initiatives and measurement of CSP indicators, such as attracting and retaining talent, employee commitment and organizational climate factors, need to be assessed.Originality/valueThe social issues are now directly linked with the business model to ensure consistency and community development. The results reveal a need for “enlightened self-interest” which is the second dominant CSR motivation among the organizations. The study makes a novel contribution by determining that competitive and coercive motivations are not functional as part of organizational CSR strategy. CSR can never be forced as the very idea is to do social good. Eventually, the CSR approach demands a commitment from within. The organizations need to emphasize more voluntary engagement of employees and go beyond statutory requirements for realizing the true CSR benefits.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  

Purpose The authors assumed PSM would be higher in the public sector, but they set up a trial to find out if this was the case. Design/methodology/approach To test their theories, the authors conducted two independent surveys. The first consisted of 220 usable responses from public sector employees in Changsha, China. The second survey involved 260 usable responses from private sector employees taking an MBA course at a university in the Changsha district. A questionnaire was used to assess attitudes. Findings The results found no significant difference between the impact of public sector motivation (PSM) on employee performance across the public and private sectors. The data showed that PSM had a significant impact on self-reported employee performance, but the relationship did not differ much between sectors. Meanwhile, it was in the private sector that PSM had the greatest impact on intention to leave. Originality/value The authors said the research project was one of the first to test if the concept of PSM operated in the same way across sectors. It also contributed, they said, to the ongoing debate about PSM in China.


2018 ◽  
Vol 8 (4) ◽  
pp. 462-480 ◽  
Author(s):  
Saad Ahmed Javed ◽  
Sifeng Liu

PurposeThe purpose of this paper is to analyse the relationship between outpatient satisfaction and the five constructs of healthcare projects’ service quality in Pakistan using Deng’s grey incidence analysis (GIA) model, absolute degree GIA model (ADGIA), a novel second synthetic degree GIA (SSDGIA) model and two approaches of decision-making under uncertainty.Design/methodology/approachThe study proposes a new synthetic GIA model and demonstrates its feasibility on data (N=221) collected from both public and private sector healthcare projects of Punjab, the most populous province of Pakistan, using a self-administered questionnaire developed using the original SERVQUAL approach.FindingsThe results of decision analysis approach indicated that outpatients’ satisfaction from the private sector healthcare projects is higher as compared to the public healthcare projects’. The results from the proposed model revealed that tangibility and reliability play an important role in shaping the patient satisfaction in the public and private sectors, respectively.Originality/valueThe study is pioneer in evaluating a healthcare system’s service quality using grey system theory. The study proposes the SSDGIA model as a novel method to evaluate parameters comprehensively based on their mutual association (given by absolute degree of grey incidence) and inter-dependencies (given by Deng’s degree of grey incidence), and tests the new model in the given scenario. The study is novel in terms of its analysis of data and modelling. The study also proposes a comprehensive structure of the healthcare delivery system of Pakistan.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Danrong Song ◽  
Jinbo Song ◽  
Hehui Yuan ◽  
Yu Fan

PurposeWith the growing demand for infrastructure and public services in recent years, PPP-UP have attracted a great deal of attention. However, while the user focuses on the payment for use and the private sector is concerned with its return on investment, the public sector pays more attention to the efficient utilization of public funds. In order to analyze the willingness of each stakeholder to join PPP-UP, an evolutionary game model involving the three parties is constructed.Design/methodology/approachAn evolutionary game model is established that considers the users and the public and private sectors in user-pay public-private-partnership projects (PPP-UP). Eight scenarios of equilibriums and the game's evolutionary stable strategies are analyzed, and the corresponding stability conditions are then obtained. A situation where all three players are willing to cooperate in theory is also examined. The key influencing parameters that affect cooperation behaviors are further discussed.FindingsFirst, the results illustrate that by properly adjusting the influencing factors, the cooperation status among the three parties can be changed along with certain evolutionary trends. Second, it is hard to modify unsatisfactory evolutionary stability by small changes in both the price compensation of and the construction and operation compensation. Third, it is necessary to involve the users in the decision-making process in PPP-UP and take their demands regarding benefits and payments into account.Originality/valueIn this paper, we focus on PPP-UP to research interactions among the public and private sectors and the users. Based on the analysis of the evolutionary game, to facilitate the successful implementation and development of a project, several conditions are needed to ensure tripartite cooperation. Several recommendations are then proposed for decision-makers in PPP-UP.


2016 ◽  
Vol 5 (4) ◽  
pp. 371-387 ◽  
Author(s):  
Sean D. Darling ◽  
J. Barton Cunningham

Purpose The purpose of this paper is to identify unique values and competencies linked to private and public sector environments. Design/methodology/approach This study is based on critical incident interviews with a sample of senior leaders who had experience in both the public and private sectors. Findings The findings illustrate distinct public and private sector relevant competencies that reflect the unique values of their organizations and the character of the organization’s environments. This paper suggests a range of distinct public sector competencies including: managing competing interests, managing the political environment, communicating in a political environment, interpersonal motivational skills, adding value for clients, and impact assessment in decision-making. These were very different than those identified as critical for the private sector environment: business acumen, visionary leadership, marketing communication, market acumen, interpersonal communication, client service, and timely and opportunistic decision-making. Private sector competencies reflect private sector environments where goals need to be specifically defined and implemented in a timely manner related to making a profit and surviving in a competitive environment. Public sector competencies are driven by environments exhibiting more complex and unresolvable problems and the need to respond to conflicting publics and serving the public good while surviving in a political environment. Originality/value A key message of this study is that competency frameworks need to be connected to the organization’s unique environments and the values that managers are seeking to achieve. This is particularly important for public organizations that have more complex and changing environments.


2018 ◽  
Vol 26 (2) ◽  
pp. 291-310
Author(s):  
Mahesh Joshi ◽  
Monika Kansal ◽  
Sharad Sharma

Purpose This paper aims to explore the awareness of terminology related to intellectual capital (IC) among executives of Indian banks and the sources in which they mostly find IC-related terminology. The paper also explores relative and specific contributions of each selected source of information in creating IC awareness among bank executives in India and determines difference among the executives from the public and private sector. Design/methodology/approach This research paper follows a survey-based approach to capture the perceptions of Indian bank managers working middle and top management across different banks. Regression analysis and ANOVA were applied to data from 166 responses. Findings The study finds that IC awareness among Indian banking executives is reasonably high and is equally spread across the three sub-categories of capital (external capital, human capital and internal capital), though the relative awareness of external capital is on the higher side. However, the sources of awareness of IC terminology differ among executives from the public- and private-sector banks. Research limitations/implications The sample was limited to middle and top managers in the Indian banking industry and suffers from the usual limitations of survey-based research such as the design of the survey instrument and the personal biases of the respondents. Some limitations may also have arisen because of the definitions of IC elements adopted by this study. Originality/value This research adds a new dimension to the IC research by exploring the practical application and awareness of IC that deviates from traditional annual report-based disclosure and valuation studies. No existing literature has examined the survey-based awareness study, particularly on the banking industry. This paper provides a foundation for future studies that examine the operational awareness and application of IC in the service industries.