Effect of change orders on rework in highway projects in Palestine

Author(s):  
Ibrahim Mahamid

Purpose This study aims at identifying the main causes of change orders in highway construction projects, determining the factors that affect rework in highway construction projects, examining the relationship between change orders and rework and at developing a predictive model that will determine the impact of change orders on rework in highway construction projects in Palestine. Design/methodology/approach A questionnaire survey was used to identify the main change order causes and rework causes from the perspectives of contractors and consultants. The questionnaire contained 16 causes of change orders and 19 causes of rework which had been identified from the literature reviewed. The study also identifies the impact of change orders on rework based on data comprising 22 highway construction projects implemented in Palestine. Both descriptive and inferential statistics were used in analyzing the data. Findings The study concluded that the five most common causes of change orders can be identified as: change of project scope by owner (additional – enhancement), lack of coordination between construction parties; owner’s financial difficulties, change in materials, and errors and omissions in design. The study has also established that among the various factors that causes rework, non-conformance with specification requirements, scope changes, late design changes, lack of labor experience, lack of labor skills and improper subcontractor selection top the list. Using regression analysis, the results reveal a significant relationship between change orders and rework cost in highway construction projects in Palestine. Practical implications By ranking the various change orders causes and rework causes from the perspectives of consultants and contractors, the study provides a fresh perspective on an old chronic problem in the construction sector. This study has provided evidence on the most significant change orders causes and rework causes in the Palestinian highway construction, as well as the impact of change orders or rework on constructions sites. Finally, although this study is specific to the country of Palestine, its results can be applicable to other developing countries facing similar problems in their public construction sectors. Originality/value The results address the common causes of change orders and reworks in highway construction projects in Palestine. The results also address the relation between change orders and rework cost based on data collected from highway construction projects implemented in the West Bank in Palestine. This study is the first study conducted in the West Bank in Palestine to identify the change orders and reworks causes in highway construction projects.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sharareh Kermanshachi ◽  
Behzad Rouhanizadeh ◽  
Paul Govan

Purpose The inevitable change orders in construction projects have either direct or indirect impacts on a project’s duration. Reduced productivity is one of the indirect consequences that lead to major delays in the completion of the project. The purpose of this study is to develop a model that could quantify the impact of change orders on labor productivity and result in the establishment of policies to lessen their effects. Design/methodology/approach A model was developed to analyze the effects of change orders on labor productivity, then policies for managing their impacts on productivity and project duration were established. A water treatment case study was selected to serve as the scenario in which to implement and evaluate the model and policies. Findings The results of this study indicated that pressure to adhere to a schedule initially leads to an increase in labor productivity, but it is often followed by a significant drop that is a result of employee frustration. It was concluded that the pressure can be positive if it is applied for a short period of time; however, it continues for a significant length of time, the duration of the project will increase appreciably. Originality/value The proposed model can be implemented to identify the factors that affect labor productivity in a construction project. Its utilization will also help project managers assess when change orders occur and determine, which policies will be most effective in optimizing labor productivity.


2017 ◽  
Vol 37 (10) ◽  
pp. 1496-1519 ◽  
Author(s):  
Ahmad Herzallah ◽  
Leopoldo J. Gutierrez-Gutierrez ◽  
Juan Francisco Munoz Rosas

Purpose The purpose of this paper is to examine the relationship between quality ambidexterity (QAMB), competitive strategies (cost leadership, differentiation, and focus), and firm performance in Palestinian industry, and to analyze the combination of quality exploitation (QEI) and quality exploration (QER) (QAMB) associated with the different levels of each competitive strategy. Design/methodology/approach Using data collected through a survey of 205 Palestinian industrial firms, the study conducted structural equation modeling to test the proposed relationships. Additional statistical analyses were applied to the combinations of QEI and QER for each competitive strategy. Findings The results show a positive and significant relationship between QAMB and three competitive strategies, and between competitive strategies and financial performance, focus strategy excepted. Balanced combination with similar levels of QEI and QER is found to be more suitable for higher levels of competitive strategies implementation, whereas an excess of QER over QEI is associated with lower levels of strategies implementation. Research limitations/implications Although Palestine has two regions, the West Bank and the Gaza Strip, all survey respondents were from the West Bank. The data used in this study come from the industrial sector only. Originality/value This study is the first empirical test to examine the impact of QAMB on financial performance through competitive strategies. The study results may help managers to implement QEI and QER practices in order to allocate resources effectively and ultimately improve financial performance.


2018 ◽  
Vol 11 (3) ◽  
pp. 650-672 ◽  
Author(s):  
Youcef J.-T. Zidane ◽  
Bjorn Andersen

Purpose Projects often face delays and unnecessary use of time due to various factors and reasons, and hence suffer from unfavourable consequences. The purpose of this paper is to identify the universal delay factors from an intensive literature review, complemented by delay factors in major Norwegian construction projects based on empirical data. Design/methodology/approach The study in which this paper is based includes an intensive literature review, and semi-quantitative open survey questionnaires. This paper addresses frequency and type of delay factors in construction projects, in Norway based on the survey, and worldwide based on the previous studies. Findings From the study, the causes of delays facing the Norwegian construction industry are: poor planning and scheduling; slow/poor decision-making process; internal administrative procedures and bureaucracy within project organisations; resources shortage (human resources, machinery, equipment); poor communication and coordination between parties; slow quality inspection process of the completed work; design changes during construction/change orders; sponsor/owner/client lack of commitment and/or clear demands (goals and objectives); late/slow/incomplete/improper design; office issues; and users’ issues. And the top 10 universal delay factors are: design changes during construction/change orders; delays in payment of contractor(s); poor planning and scheduling; poor site management and supervision; incomplete or improper design; inadequate contractor experience/building methods and approaches; contractor’s financial difficulties; sponsor/owner/client’s financial difficulties; resources shortage (human resources, machinery, equipment); and poor labour productivity and shortage of skills. Research limitations/implications When it comes to the identification of delay factors in major Norwegian projects, the research is based on a sample of 202 respondents from an open survey questionnaire. It should be noted that analysing a large population of respondents that have been asked open questions can be challenging due to the vague findings it might lead to. Also, when it comes to the identification of the universal delay factors, there were different methods used by different authors, within different context. Similar future studies in Norway based on qualitative and quantitative methods will give better verification for the findings. Practical implications This paper has documented the critical delay factors/causes in Norway. The results of this study will help project managers, in Norway and elsewhere, to be aware and know about the potential causes of delay in their construction projects, which will help to identify the possible risks in the early phases of the project. Another practical implication is to make project managers and policy makers conscious that delays are quite universal, making it necessary to identify them as a first step. Social implications The identification of delays factors and causes can permit projects to implement mitigation actions to avoid delays, thus allowing delivering schools, hospitals and other necessary infrastructure on schedule or ahead of schedule to society. Originality/value This paper highlights most (almost all) of the studies in the literature, including to the study done in Norway, concerning the delay factors in construction projects and large construction projects in general. This wide review of relevant literature will save time other academicians from having to conduct similar studies. This study will assist both academic and professional experts providing more insight about the delay causes in large-scale construction projects.


2021 ◽  
Vol 7 (1) ◽  
Author(s):  
Samah W. Al-Jabi ◽  
Ansam Sous ◽  
Fatimah Jorf ◽  
Mahmoud Taqatqa ◽  
Mahdi Allan ◽  
...  

Abstract Background The impact of end-stage renal disease on the patient’s psychological status necessitates the value of increasing depression awareness. The current study aimed to assess the depression prevalence among Palestinian hemodialyzed patients and its association with patients’ characteristics. Methods A convenience clustered sampling technique was followed. Sample was collected from ten hemodialysis centers in the West Bank, Palestine, during 3 months in 2015. We used the Beck Depression Inventory-II scale (BDI-II) to evaluate depression among participants. All data were analyzed using Statistical Package for the Social Sciences version 16.0. Results Two hundred and eighty-six hemodialyzed patients were interviewed. The mean age (± standard deviation) of the patients was 52.0 ± 14.3 years, and most participants were males 172 (60.1%). Regarding the dialysis characteristics, the median of years of dialysis was 2 years (1–4). The prevalence of depression was 73.1%. Elderly patients (p = 0.001), female (p = 0.036), living in rural areas or camp (p = 0.032), low income (p = 0.041), unemployment (p = 0.001), not doing regular exercise (p = 0.001), and having multi comorbidities (p = 0.001) were significantly associated with more depression scores. The results of binary logistic regression showed that only patients who were living in camps, patients who were previously employed, and patients who were not practicing exercise remained significantly associated with a higher depression score. Conclusions This study is the first one confirmed about depression and its prevalence among hemodialyzed patients in the West Bank, Palestine. Compared to other communities, the study found a higher depression prevalence rate. There is a need to offer psychological interviews and non-pharmacological and pharmacological interventions.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


2020 ◽  
Vol 3 (4) ◽  
pp. 1349
Author(s):  
Hendy Eka Putra ◽  
Hendrik Sulistio

The implementation of the construction project caused miscommunication, this made the contract became a reference during implementation. In the implementation of construction projects, there are often changes that not according to contract, for example: work volume changes, specifications changes, type or method of work changes, schedules changes , design changes, and others. These changes are commonly known as change orders. There are several things that cause a change order, for example: incompletable contract, design does not fit in the field, unsupportive weather, and others. This research is to determine the effect of change order in the aspects of cost, quality, and time in multi-storey building construction projects. Researchers used data from the responses of respondents consisting of contractors, consultants, and owners. The questionnaire made proposes several aspects of change orders and their effects on cost, quality, and time. Analysis of research data was carried out with the help of the SmartPLS 3.0 application program. The influence of change orders on costs is the lack of costs due to the addition of work items, while on quality is the quality decrease due to additional work volume, and on time is the delay in project completion due to changes in completed work.ABSTRAKPelaksanaan proyek konstruksi menyebabkan terjadi perbedaan pendapat yang disebabkan oleh pihak yang terlibat, hal ini membuat kontrak menjadi sangat penting dan menjadi acuan selama pelaksanaan. Pada pelaksanaan proyek konstruksi sering terjadi perubahan-perubahan yang akhirnya tidak sesuai dengan kontrak sebelumnya contohnya seperti: perubahan volume pekerjaan, perubahan spesifikasi, perubahan jenis atau metode pekerjaan, perubahan jadwal, perubahan design, dan lain-lain. Perubahan ini umum sekali terjadi dalam proyek konstruksi dan lebih sering dikenal sebagai change order.  Ada beberapa hal yang menyebabkan perlunya dilakukan change order, misalnya: kontrak yang dibuat tidak lengkap, design yang ada tidak sesuai dengan kondisi lapangan, cuaca yang tidak mendukung, dan lain-lain. Penelitian ini dilakukan untuk mengetahui besar pengaruh change order dalam aspek biaya, mutu, dan waktu dalam proyek konstruksi gedung bertingkat. Peneliti menggunakan data dari hasil tanggapan responden yang terdiri dari kontraktor, konsultan, dan pemilik. Kuesioner yang dibuat mengajukan beberapa aspek mengenai change order serta pengaruhnya terhadap biaya, mutu, dan waktu. Analisis data penelitian dilakukan dengan bantuan program aplikasi SmartPLS 3.0. Pengaruh change order terhadap biaya adalah kurangnya biaya akibat penambahan item pekerjaan, sedangkan terhadap mutu adalah menurunnya kualitas bangunan akibat penambahan volume pekerjaan, dan terhadap waktu adalah terjadinya keterlambatan penyelesaian proyek akibat perubahan pekerjaan yang telah selesai.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Hilary Omatule Onubi ◽  
Nor'Aini Yusof ◽  
Ahmad Sanusi Hassan ◽  
Ali Ahmed Salem Bahdad

PurposeThe coronavirus disease 2019 (COVID-19) pandemic has had major impacts on the performance of construction projects that have adopted social distancing measures. This study examines the effect of social distancing measures on project schedule performance through job reorganization on construction project sites.Design/methodology/approachResponses were obtained through a survey of 154 construction projects and analysed using the partial least square structural equation modeling (PLS-SEM) technique.FindingsThe findings established that social distancing has a negative effect on schedule performance, social distancing has a positive effect on job re-organization and job re-organization has a positive effect on schedule performance. Additionally, the results indicate that job re-organization partially mediates the relationship between social distancing and schedule performance, while social distancing moderates the relationship between job re-organization and schedule performance with low social distancing having the stronger positive effect.Originality/valueThis study contributes theoretically to a greater understanding of the impact of adopting COVID-19 safety measures such as social distancing on the schedule performance of construction projects. The study also shows how social distancing could lead to schedule performance through job reorganization.


Author(s):  
Zain Ghazi Al-Kofahi ◽  
Amirsaman Mahdavian ◽  
Amr Oloufa

It is vital to investigate the system dynamics (SD) between the change orders and labor productivity to identify the causes of the productivity loss of the construction projects. Most productivity loss studies were financed from the contractor’s part and rely on the contractor’s data. This research highlighted the problem of productivity loss resulting from issuance of a change order by utilizing a previously developed SD model. It conducted a sensitivity analysis to evaluate the impact of overtime, overmanning, temperature and learning on the behavior of the SD model quantifying change orders' impact on labor productivity. Based on the results, SD provides more reliable results comparing with the measured mile analysis (MMA) approach for the compensation request, considering the leading factors affecting the productivity loss other than the change order. The model developed in this study can accept or reject the responsibility of a change order for occurrence of productivity loss.