Effect of Synchronous Generator-Based Distributed Generation Resources on Power System Transient Stability Considering Critical Clearing Time Index

Author(s):  
N. Ghasemkhani ◽  
R. Khalili ◽  
B. Zaker ◽  
G. B. Gharehpetian
Energies ◽  
2020 ◽  
Vol 13 (9) ◽  
pp. 2365
Author(s):  
Daniel Carletti ◽  
Arthur Eduardo Alves Amorim ◽  
Thiago Silva Amorim ◽  
Domingos Sávio Lyrio Simonetti ◽  
Jussara Farias Fardin ◽  
...  

The growing number of renewable energy plants connected to the power system through static converters have been pushing the development of new strategies to ensure transient stability of these systems. The virtual synchronous generator (VSG) emerged as a way to contribute to the system stabilization by emulating the behavior of traditional synchronous machines in the power converters operation. This paper proposes a modification in the VSG implementation to improve its contribution to the power system transient stability. The proposal is based on the virtualization of the resistive superconducting fault current limiters’ (SFCL) behavior through an adaptive control that performs the VSG armature resistance change in short-circuit situations. A theoretical analysis of the problem is done based on the equal-area criterion, simulation results are obtained using PSCAD, and experimental results are obtained in a Hardware-In-the-Loop (HIL) test bench to corroborate the proposal. Results show an increase in the system transient stability margin, with an increase in the fault critical clearing time (CCT) for all virtual resistance values added by the adaptive control to the VSG operation during the short-circuit.


2020 ◽  
pp. 0309524X2097546
Author(s):  
Abdul Waheed Kumar ◽  
Mairaj ud din Mufti ◽  
Mubashar Yaqoob Zargar

This paper reports the modeling and dynamic performance of a wind penetrated multi-area power system incorporating a Singular Virtual Synchronous Generator (SVSG)/Distributed Virtual Synchronous Generator (DVSG). The active and reactive power controls are achieved by using Superconducting Magnetic Energy Storage (SMES) as Virtual Synchronous Generator (VSG). SMES based VSG control parameters are tuned offline using genetic algorithm (GA). Two topologies of VSGs are considered in this paper: SVSG at lowest inertia generator bus (SVSGGENBUS), SVSG at load bus (SVSGLOADBUS) and DVSG of comparatively smaller rating at three lowest inertia generator buses. A modified 18 machine, 70-bus power system is simulated in MATLAB/Simulink environment. System performance is assessed for two different types of disturbances: step wind disturbance and three-phase fault. The simulation results show that rate of change of frequency (ROCOF), deviations in frequency and voltage are minimized with DVSG. Transient stability measured in terms of critical clearing time (CCT) verifies that CCT is increased by DVSG topology.


2018 ◽  
Vol 3 (10) ◽  
pp. 81-89
Author(s):  
Aniagboso John Onah

Abstract The term large disturbance is often used in place of system collapse. It is the process by which the series of events accompanying voltage instability, frequency instability, and transient instability leads to a blackout or abnormally low voltages in a significant part of the power system. Large disturbance may be due to tripping of the lines on an account of fault or increase in load than the available supply. Transient stability deals with the effect of large and sudden disturbances in the system, while steady-state Stability deals with the effect of small disturbances in the system. Small disturbance can be a change in the gain of the automatic voltage regulator in the excitation system of a large generating unit. This paper studies the effect of a large disturbance in a power system. The system is represented by a two-machine system connected to an infinite bus. This study involves the effects of the fault on the speed of the rotor of the synchronous generator. Two cases were investigated: firstly, when fault occurred on a bus, and secondly, when fault occurred on the middle of a line. The conditions of the network before, during and after the fault are established in this paper. The equal area criterion was applied to the swing curves obtained to predict the critical clearing time of the system. The critical clearing time was found to lie between 0.20s and 0.225s if the fault occurred on the bus, and lies between 0.245s and 0.355s if the fault occurred at the middle of a line. Thus the system is more transiently stable in the second case than in the first. Machine 1 was less stable in the first case, while machine 2 was less stable in the second case. The critical clearing time is essential to the design of proper relaying schemes for fault clearing.


2012 ◽  
Vol 36 (6) ◽  
pp. 687-700 ◽  
Author(s):  
M. A. Ebrahim ◽  
K. A. El-Metwally ◽  
F. M. Bendary ◽  
W. M. Mansour

This paper proposes a new power system stabilizer based on fuzzy systems. The new controller is applied to a wind turbine generating system comprising of a wind turbine driving a 3 - phase synchronous generator connected to a large power system. The new controller significantly improves system performance. The enhancement in the dynamic response of the system is verified through simulation results of a system under different operating points and exposed to both small and large disturbances. Extension to the wind energy distributed generation based multi-machine case is also included to illustrate the effectiveness of the proposed stabilizer in damping power system swing mode oscillations that follow disturbances.


Author(s):  
Raja Nivedha. R ◽  
Sreevidya. L ◽  
V. Geetha ◽  
R. Deepa

The main objective of this paper is to improve the critical clearing time of the Steel Plant 35 MW Turbo generator. In order to enhance the transient behavior of the system, Power System Stabilizer is added so that proper damping is done. Damping intra area and inter area oscillations are critical to optimal power flow and stability on a system. Power system stabilizer is an effective damping device, as they provide auxiliary control signals to the excitation system of the generator. Transient stability analysis was carried out for the Steel plant. The three phase to ground and line to ground fault was simulated. The critical clearing time was found to be more when Power System Stabilizer was added and when Power System Stabilizer was not added the critical clearing time has considerably reduced.


2015 ◽  
Vol 743 ◽  
pp. 257-262
Author(s):  
Ming Jong Lin

Critical clearing time is to determine the time point of the collapse of the power system when the power system occur transient stability by a huge of failure. So that the one is an important data on protection system in power system. Therefore as an electrical engineer must to look on mostly the point of one to analyze and design in the power. In this paper, through the protection relay and breaker analysis of operation to know the team of protection relay how to complete the automatic monitoring and isolated the fault-equipment in power system. To study and analyze the swing equation and equal area criterion, we found out the relation of critical clearing time is changed with power factor and frequency. The critical clearing time was verified a non-constant value which is changed with the power factor and; if the load power factor is high, the critical clearing time is high but the frequency is high, the critical clearing time is low with system swing in the transient stability. This paper will be verify below each paragraph.


Sign in / Sign up

Export Citation Format

Share Document