A GCC Power Plant With Methanol Storage for Intermediate-Load Duty

1991 ◽  
Vol 113 (1) ◽  
pp. 151-157 ◽  
Author(s):  
J. A. Paffenbarger

This paper describes the design and performance of a coal gasification combined-cycle power plant with an integrated facility for producing and storing methanol (GCC/methanol power plant). The methanol is produced at a steady rate and is burned in the combined cycle to generate additional power during periods of peak electrical demand. The GCC/methanol plant provides electricity generation and energy storage in one coal-based facility. It is of potential interest to electric utilities seeking to meet intermediate-load electrical demand on their systems. The plant configuration is determined by means of an innovative economic screening methodology considering capital and fuel costs over a range of cycling duties (capacity factors). Estimated levelized electricity production costs indicate that a GCC/methanol plant could be of economic interest as premium fuel prices increase relative to coal. The plant could potentially be of interest for meeting daily peak demands for periods of eight hours or less. The conceptual plant configuration employs a Texaco gasifier and a Lurgi methanol synthesis plant. Plant performance is estimated at peak and baseload output levels. No unusual design or operational problems were identified.

Author(s):  
John A. Paffenbarger

This paper describes the design and performance of a coal gasification combined-cycle power plant with an integrated facility for producing and storing methanol (GCC/methanol power plant). The methanol is produced at a steady rate and is burned in the combined-cycle to generate additional power during periods of peak electrical demand. The GCC/methanol plant provides electricity generation and energy storage in one coal-based facility. It is of potential interest to electric utilities seeking to meet intermediate-load electrical demand on their systems. The plant configuration is determined by means of an economic screening study considering capital and fuel costs over a range of cycling duties (load factors). Estimated levelized electricity production costs indicate that a GCC/methanol plant could be of economic interest as premium fuel prices increase relative to coal. The plant could potentially be of interest for meeting daily peak demands for periods of eight hours or less. The conceptual plant configuration employs a Texaco gasifier and a Lurgi methanol synthesis plant. Plant performance is estimated at peak and baseload output levels. No unusual design or operational problems were identified.


Author(s):  
Clayton M. Grondahl ◽  
Toshiaki Tsuchiya

The introduction of a ceramic gas turbine component in commercial power generation service will require significant effort. A careful assessment of the power plant performance benefit achievable from the use of ceramic components is necessary to rationalize the priority of this development compared to other alternatives. This paper overviews a study in which the performance benefit from ceramic components was evaluated for an MS9001FA gas turbine in a combined cycle power plant configuration. The study was performed with guidelines of maintaining constant compressor inlet airflow and turbine exit NOx emissions, effectively setting the combustion reaction zone temperature. Cooling flow estimates were calculated to maintain standard design life expectancy of all components. Monolithic silicon nitride ceramic was considered for application to the transition piece, stage one and two buckets, nozzles and shrouds. Performance benefit was calculated both for ceramic properties at 1093C (2200F) and for the more optimistic 1315C (2400F) oxidatian limit of the ceramic. Hybrid ceramic-metal components were evaluated in the less optimistic case.


Author(s):  
W. C. Yang ◽  
R. A. Newby ◽  
R. L. Bannister

Air-blown coal gasification for combined-cycle power generation is a technology soon to be demonstrated. A process evaluation of air-blown IGCC performed to estimate the plant heat rate, electrical output and potential emissions are described in this paper. A process model of an air-blown IGCC power system based on the Westinghouse 501F combustion turbine was developed to conduct the performance evaluation. Parametric studies were performed to develop an understanding of the power plant sensitivity to the major operating parameters and process options. Advanced hot fuel gas cleaning and conventional cold fuel gas cleaning options were both considered.


1980 ◽  
Author(s):  
J. W. Larson

The idea of a combined cycle power plant integrated with a coal gasification process has attracted broad interest in recent years. This interest is based on unique attributes of this concept which include potentially low pollutant emissions, low heat rate and competitive economics as compared to conventional steam plants with stack gas scrubbing. Results from a survey of technical literature containing performance and economic predictions have been compiled for comparison and evaluation of this new technique. These performance and economic results indicate good promise for near-term commercialization of an integrated gasification combined cycle power plant using current gas turbine firing temperatures. Also, these data show that advancements in turbine firing temperature are expected to provide sufficiently favorable economics for the concept to penetrate the market now held by conventional steam power plants.


2000 ◽  
Vol 123 (3) ◽  
pp. 513-519 ◽  
Author(s):  
C. M. Grondahl ◽  
T. Tsuchiya

The introduction of a ceramic gas turbine component in commercial power generation service will require significant effort. A careful assessment of the power plant performance benefit achievable from the use of ceramic components is necessary to rationalize the priority of this development compared to other alternatives. This paper overviews a study in which the performance benefit from ceramic components was evaluated for an MS9001FA gas turbine in a combined cycle power plant configuration. The study was performed with guidelines of maintaining constant compressor inlet airflow and turbine exit NOx emissions, effectively setting the combustion reaction zone temperature. Cooling flow estimates were calculated to maintain standard design life expectancy of all components. Monolithic silicon nitride ceramic was considered for application to the transition piece, stage one and two buckets, nozzles and shrouds. Performance benefit was calculated both for ceramic properties at 1093°C (2200°F) and for the more optimistic 1315°C (2400°F) oxidation limit of the ceramic. Hybrid ceramic-metal components were evaluated in the less optimistic case.


Author(s):  
Pablo Andrés Silva Ortiz ◽  
Osvaldo José Venturini ◽  
Electo Eduardo Silva Lora

The increasing trend in global production of petroleum coke (petcoke) is the result of their multiple and innovative industrial applications. From this point of view and also considering the current situation of the traditional energy reserves worldwide, it is important to conduct studies in this area through analysis of the main components of the power plants utilizing this fuel (petcoke). The main target of this study is to realize a techno-economic evaluation of IGCC (Integrated Gasification Combined Cycle) technology, using Brazilian coal, petcoke and a mix of 50% coal and 50% petcoke as fuel. In this paper, the gasification process and the combined cycle are analyzed, considering the implementation of the IGCC technology in the Termobahia power plant. Termobahia is a cogeneration combined cycle power plant, located in the Brazilian state of Bahia that produces 190 MW of electricity and 350 ton/h of steam. The steam produced is sold to an oil refinery (RLAM) located next to it. In first part of this work, the production of the synthesis gas (syngas) from coal gasification was simulated using CeSFaMBi™ software. In the next part, the syngas produced is used to analyze the power plant performance through GateCycle™ software. Finally, the obtained operational and economic parameters are compared with the actual operational parameters of the Termobahia power plant in terms of costs, fuel substitution and combined cycle performance variables, as net power, global efficiency and heat rate.


2019 ◽  
Vol 23 (Suppl. 4) ◽  
pp. 1187-1197 ◽  
Author(s):  
Marek Jaszczur ◽  
Michal Dudek ◽  
Zygmunt Kolenda

One of the most advanced and most effective technology for electricity generation nowadays based on a gas turbine combined cycle. This technology uses natural gas, synthesis gas from the coal gasification or crude oil processing products as the energy carriers but at the same time, gas turbine combined cycle emits SO2, NOx, and CO2 to the environment. In this paper, a thermodynamic analysis of environmentally friendly, high temperature gas nuclear reactor system coupled with gas turbine combined cycle technology has been investigated. The analysed system is one of the most advanced concepts and allows us to produce electricity with the higher thermal efficiency than could be offered by any currently existing nuclear power plant technology. The results show that it is possible to achieve thermal efficiency higher than 50% what is not only more than could be produced by any modern nuclear plant but it is also more than could be offered by traditional (coal or lignite) power plant.


2010 ◽  
Vol 44-47 ◽  
pp. 1240-1245 ◽  
Author(s):  
Hong Zeng ◽  
Xiao Ling Zhao ◽  
Jun Dong Zhang

For combined-cycle power plant performance analysis, a ship power plant mathematical model is developed, including diesel engine, controllable pitch propeller, exhaust gas boiler, turbine generator and shaft generator models. The simulation performance characteristic curves of diesel engine under various loads are given. Comparison of simulation results and experimental data shows the model can well predict the performance of diesel engine in various operating conditions. The specific fuel oil consumption contours of combined-cycle power plant and the relations between engine operating conditions and steam cycle parameters are given. The influence of diesel engine operating conditions to the overall performance of combined-cycle power plant is discussed.


Author(s):  
Weimar Mantilla ◽  
José García ◽  
Rafael Guédez ◽  
Alessandro Sorce

Abstract Under new scenarios with high shares of variable renewable electricity, combined cycle gas turbines (CCGT) are required to improve their flexibility, in terms of ramping capabilities and part-load efficiency, to help balance the power system. Simultaneously, liberalization of electricity markets and the complexity of its hourly price dynamics are affecting the CCGT profitability, leading the need for optimizing its operation. Among the different possibilities to enhance the power plant performance, an inlet air conditioning unit (ICU) offers the benefit of power augmentation and “minimum environmental load” (MEL) reduction by controlling the gas turbine inlet temperature using cold thermal energy storage and a heat pump. Consequently, an evaluation of a CCGT integrated with this inlet conditioning unit including a day-ahead optimized operation strategy was developed in this study. To establish the hourly dispatch of the power plant and the operation mode of the inlet conditioning unit to either cool down or heat up the gas turbine inlet air, a mixed-integer linear optimization (MILP) was formulated using MATLAB, aiming to maximize the operational profit of the plant within a 24-hours horizon. To assess the impact of the proposed unit operating under this dispatch strategy, historical data of electricity and natural gas prices, as well as meteorological data and CO2 emission allowances price, have been used to perform annual simulations of a reference power plant located in Turin, Italy. Furthermore, different equipment capacities and parameters have been investigated to identify trends of the power plant performance. Lastly, a sensitivity analysis on market conditions to test the control strategy response was also considered. Results indicate that the inlet conditioning unit, together with the dispatch optimization, increases the power plant’s operational profit by achieving a wider operational range, particularly important during peak and off-peak periods. For the specific case study, it is estimated that the net present value of the CCGT integrated with the ICU is 0.5% higher than the power plant without the unit. In terms of technical performance, results show that the unit reduces the minimum environmental load by approximately 1.34% and can increase the net power output by 0.17% annually.


Sign in / Sign up

Export Citation Format

Share Document