scholarly journals Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition

2016 ◽  
Vol 36 (6) ◽  
pp. 1153-1160
Author(s):  
Hak-Bong Hyun ◽  
Hyung-Keun Park
2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


2021 ◽  
Vol 14 (2) ◽  
pp. 91-101
Author(s):  
Noor Aletby ◽  
Hafeth Ibrahim

Construction projects in Iraq face many dangers that cause exceeding the estimated cost of the project and not completing the project on time, and since the risk management process in construction projects is of great importance in controlling and reducing the impact of risks in construction projects, so it is necessary to identify these risks and evaluate them correctly in order to increase accuracy and the health of the subsequent stages of the risk management process in construction projects. This paper aims to identify the most important risks in construction projects in Iraq and to conduct a qualitative assessment of the identified risks and arrange them according to their importance. The researcher adopted the questionnaire method as a tool to determine the risks and used the technique of probability and effect matrix to conduct the qualitative assessment of the identified risks. The study found that there are 48 risk factors that constitute the most dangerous factor in construction projects in Iraq, and 10 of the determining factors were within the high level of risk, and at the forefront of which was the inability of the owner to finance the project.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Osama ◽  
Aly Sherif ◽  
Mohamed Badawy

Purpose This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the construction industry. However, most traditional risk analysis techniques are based on theories that deal with each risk factor as an independent, which does not take into consideration the causal relationships between risk factors. Design/methodology/approach This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using Bayesian belief networks (BBN). Through a review of the literature, 27 risk factors were identified and categorized as the most common risk factors in the construction industry. A structured questionnaire was performed to estimate the probability and severity of these risks. Through site visits and interviews with experts in the construction field, 200 valid questionnaires were collected. A risk analysis model was developed using BBNs, then the applicability of this model was verified using a case study in Egypt. Findings However, the outcome showed that critical risks that manipulate administrative construction projects in Egypt were corruption and bribery, contractor financial difficulties, force majeure, damage to the structure and defective material installation. Practical implications The proposed study presents the possibilities available to the project parties to obtain a better forecast of the project objectives, including the project duration, total project cost and the target quality by examining the causal relationships between project risks and project objectives. Originality/value This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using BBNs.


Author(s):  
Ibrahim Yahaya Wuni ◽  
Geoffrey Qiping Shen ◽  
Robert Osei-Kyei ◽  
Stephen Agyeman-Yeboah

2020 ◽  
Vol 14 (5) ◽  
pp. 975-1000
Author(s):  
Mukhtar A. Kassem ◽  
Muhamad Azry Khoiry ◽  
Noraini Hamzah

Purpose Project failure is the result of one or a combination of several causes of risk factors that are very important to identify for effective performance. This study aims to focus on studying the fundamental relationship between internal risk factors and the negative effect on oil and gas project success in Yemen using the partial least square structural equation modelling (PLS-SEM) method. Design/methodology/approach Data collection was carried out using a formal questionnaire survey of the oil field sector in Yemen by companies involved in mega-oil and gas construction projects. A hierarchical model for determining causative internal risk factors and their effects was developed and evaluated using SEM method by SmartPLS3 software technology. Findings The findings of analyzing model indicate that all categories have a significant effect on project success, while the most significant affected categories in the internal risk factors are project management factors, feasibility study-design and resources-material supply with a path coefficient value of 0.213, 0.197 and 0.186, respectively. Moreover, for the hypotheses test, the positive relationship means that all experimental hypotheses are accepted according to path coefficient value analysis. In addition, the internal risk factors research model shows the ranking of effects on project success starting with project stoppage (loading factor 0.841), cost overruns (loading factor 0.818), time overruns (loading factor 0.726) and project target failure with loading factor 0.539. Research limitations/implications The research was limited to the oil and gas construction projects in Yemen. Practical implications Interpreting the relationship between internal risk factors and their impact on the success of construction projects in the oil and gas sector will assist project team and oil companies in developing risk response strategies and developing appropriate plans to mitigate the effects of risks, which is presented in this paper. Originality/value The paper explains the relationship between cause and effect of internal risk factors in oil and gas projects in Yemen, and is expected to be a guideline for the oil companies and future academic research in the risk management area.


2020 ◽  
Vol 27 (9) ◽  
pp. 2687-2713
Author(s):  
Satish Kumar Viswanathan ◽  
Kumar Neeraj Jha

PurposeA number of previous studies have investigated international construction project risks and have proposed risk mitigation measures without examining their interdependence. The purpose of the current study is to identify the influence of various risk mitigation measures on macro-level risk factors in the international marketplace.Design/methodology/approachThe authors initially identified 26 risk variables and nine risk mitigation measures through a literature review, which were then verified for their pertinence to international projects by three experts. Subsequently, 105 questionnaire survey responses were collected and analysed using factor analysis and structural equation modelling to test the interrelations between the risk variables and mitigation measures.FindingsThe findings suggest that joint ventures with local partners is emerged as the most critical risk mitigation measure that influences the international projects, which are exposed to political, project and firm-specific risk factors. Further, it is worth noting that among the recognised risk mitigation measures in international projects, offering more local employment is the least critical mitigation measure in the international projects.Research limitations/implicationsThe findings of this study are based on the macro-risk factors encountered by Indian construction firms in international projects, mostly from specific Asian and African regions. Thus, the opinions of construction firms from the developed countries might be different.Originality/valueThe main contribution of this study to existing knowledge is empirical evidence of the interrelationships between risk mitigation measures and risk factors that are portrayed as latent variables of different manifest risk variables. The generated model can assist construction firms in emphasising several risk mitigation methods, in order to reduce risk and enhance performance in international construction projects.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Tao Wang ◽  
Shangde Gao ◽  
Pinchao Liao ◽  
Tsenguun Ganbat ◽  
Junhua Chen

Purpose The purpose of this paper is to construct a two-stage risk management framework for international construction projects based on the meta-network analysis (MNA) approach. A plethora of international construction studies seems to assume risks as independent and therefore, risk intervention strategies are usually critiqued as ineffective. Design/methodology/approach In the risk assessment stage, a multi-tiered risk network structure was developed with the project objectives, risk events, risk factors and stakeholders, and critical risk factors were selected based on a series of calculations. In the risk intervention stage, targeted risk intervention strategies were proposed for stakeholders based on the results of the first stage. A highway construction project in Eastern Europe was selected as a case study. Findings The results showed that 17 risk factors in three categories – external, stakeholder-related and internal – are critical, and the project manager, construction management department, supplier and contract department are the most critical stakeholders that affect the entire project performance. Based on the critical risk factors and project stakeholders, targeted risk intervention strategies were proposed. The risk assessment results of MNA were found to be more reliable and consistent with the project conditions than the risk matrix method; the risk intervention strategies of MNA can effectively address project objectives. Originality/value This study modeled risk priorities based on risk associations and put forward a new method for risk management, supplementing the body of knowledge of international construction. The results of this study are of critical importance in management practices.


2017 ◽  
Vol 23 (8) ◽  
pp. 1045-1059 ◽  
Author(s):  
Mostafa KHANZADI ◽  
Ehsan ESHTEHARDIAN ◽  
Mahdiyar MOKHLESPOUR ESFAHANI

Cash-flow management is very important for contractors given that inadequate cash resources typically are the main causes for bankruptcy of construction companies. In comparison to most other industries, the construction industry is severely plagued by risk, and the success of construction projects usually depends on valuating all risks. However, conventional methods suggested by extant research on cash flow forecasting do not consider comprehensive identifica­tion of risk factors, interactions between the factors, and simultaneous occurrences of the factors. This study introduced a simple and appropriate probabilistic cash flow forecasting model using Bayesian Belief Networks (BBNs) to avoid bankruptcy of contractors by considering influence diagrams and risk factors that affect a project. Workability and reli­ability of the proposed approach was tested on an important building construction project in Iran as a real case study, and the results indicated that the model performed well.