scholarly journals Analysis of the Road Network Evolution through Geographical Information Extracted from Historical Maps: A Case Study of Manila, Philippines

2019 ◽  
Vol 10 (3) ◽  
pp. 114-118
Author(s):  
M. T. Cirunay ◽  
◽  
M. N. Soriano ◽  
R. C. Batac
2016 ◽  
Vol 167 (5) ◽  
pp. 294-301
Author(s):  
Leo Bont

Optimal layout of a forest road network The road network is the backbone of forest management. When creating or redesigning a forest road network, one important question is how to shape the layout, this means to fix the spatial arrangement and the dimensioning standard of the roads. We consider two kinds of layout problems. First, new forest road network in an area without any such development yet, and second, redesign of existing road network for actual requirements. For each problem situation, we will present a method that allows to detect automatically the optimal road and harvesting layout. The method aims to identify a road network that concurrently minimizes the harvesting cost, the road network cost (construction and maintenance) and the hauling cost over the entire life cycle. Ecological issues can be considered as well. The method will be presented and discussed with the help of two case studies. The main benefit of the application of optimization tools consists in an objective-based planning, which allows to check and compare different scenarios and objectives within a short time. The responses coming from the case study regions were highly positive: practitioners suggest to make those methods a standard practice and to further develop the prototype to a user-friendly expert software.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-15 ◽  
Author(s):  
Tinggui Chen ◽  
Shiwen Wu ◽  
Jianjun Yang ◽  
Guodong Cong ◽  
Gongfa Li

It is common that many roads in disaster areas are damaged and obstructed after sudden-onset disasters. The phenomenon often comes with escalated traffic deterioration that raises the time and cost of emergency supply scheduling. Fortunately, repairing road network will shorten the time of in-transit distribution. In this paper, according to the characteristics of emergency supplies distribution, an emergency supply scheduling model based on multiple warehouses and stricken locations is constructed to deal with the failure of part of road networks in the early postdisaster phase. The detailed process is as follows. When part of the road networks fail, we firstly determine whether to repair the damaged road networks, and then a model of reliable emergency supply scheduling based on bi-level programming is proposed. Subsequently, an improved artificial bee colony algorithm is presented to solve the problem mentioned above. Finally, through a case study, the effectiveness and efficiency of the proposed model and algorithm are verified.


2021 ◽  
Vol 22 (1) ◽  
pp. 15-28
Author(s):  
K. Sai Sahitya ◽  
Csrk Prasad

Abstract A sustainable transportation system is possible only through an efficient evaluation of transportation network performance. The efficiency of the transport network structure is analyzed in terms of its connectivity, accessibility, network development, and spatial pattern. This study primarily aims to propose a methodology for modeling the accessibility based on the structural parameters of the urban road network. Accessibility depends on the arrangement of the urban road network structure. The influence of the structural parameters on the accessibility is modeled using Multiple Linear Regression (MLR) analysis. The study attempts to introduce two methods of Artificial Intelligence (AI) namely Artificial Neural Networks (ANN) and Adaptive network-based neuro-fuzzy inference system (ANFIS) in modeling the urban road network accessibility. The study also focuses on comparing the results obtained from MLR, ANN and ANFIS modeling techniques in predicting the accessibility. The results of the study present that the structural parameters of the road network have a considerable impact on accessibility. ANFIS method has shown the best performance in modeling the road network accessibility with a MAPE value of 0.287%. The present study adopted Geographical Information Systems (GIS) to quantify, extract and analyze different features of the urban transportation network structure. The combination of GIS, ANN, and ANFIS help in improved decision-making. The results of the study may be used by transportation planning authorities to implement better planning practices in order to improve accessibility.


2011 ◽  
Vol 97-98 ◽  
pp. 512-517
Author(s):  
Wen Jie Zou ◽  
Jian Cheng Weng ◽  
Jian Rong ◽  
Wei Zhou

In order to improve the reliability of urban road network operation evaluation, the road network regional Partition methods were launched in this paper. The geographic grid was introduced first, and a 4-level road network model was defined. Then, the spatial analysis based urban road network division method was proposed by analyzing the characteristics of road network operation. This method can reflect the influence between adjacent regional units, and improve the reliability of urban road network division. Finally, this research took a certain area in Beijing as a case study, and divided the road network as several regional units. Macroscopic evaluation result shows that it is effective for scientifically describing the road network operation status.


Author(s):  
Monika Siejka ◽  
Monika Mika

The development of the communication systems determines the economic level of the country. In Poland, despite the successive investments in this area, it is still not enough beneficial solutions to the road network and international calls. The problem of the acquisition of property for public roads on both the valuation principles and the way of obtaining land for these purposes is constantly modified. These changes are intended to simplify the procedures, which have a significant impact on shortening of the investment process. The current provisions of law give the possibility of the start of road investment before a property owner receives compensation for land taken for this purpose. This situation requires an inventory of component parts of the property for the purposes of their valuation. The paper presents the methodology of inventory the real estate components for the needs of their valuation using modern measurement techniques GNSS and GIS.


2017 ◽  
Vol 2017 ◽  
pp. 1-14 ◽  
Author(s):  
Md. Shohel Reza Amin ◽  
Umma Tamima ◽  
Luis Amador Jimenez

This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.


2016 ◽  
Vol 2016 ◽  
pp. 1-10 ◽  
Author(s):  
Yangfan Zhou ◽  
Shunping Jia ◽  
Baohua Mao ◽  
Tin Kin Ho ◽  
Wei Wei

Modern trams are developing fast because of their characteristics like medium capability and energy saving. Exclusive way is always set in practice to avoid interruption from general vehicles, while trams have to stop at intersections frequently due to signal rules in the road network. Therefore, signal optimization has great effects on operational efficiency of trams system. In this paper, an arterial signal coordination optimization model is proposed for trams progression based on the Asymmetrical Multi-BAND (AM-BAND) method. The AM-BAND is modified from the following aspects. Firstly, BAM-BAND is developed by supplementing active bandwidth constraints to AM-BAND. Assisted by the IBM ILOG CPLEX Optimization Studio, two arterial signals plans with eight intersections are achieved from AM-BAND and BAM-BAND for comparison. Secondly, based on the modified BAM-BAND, a BAM-TRAMBAND model is presented, which incorporates three constraints regarding tram operations, including dwell time at stations, active signal priority, and minimum bandwidth value. The case study and VISSIM simulation results show that travel times of trams decrease with signal plan from BAM-TRAMBAND comparing with the original signal plan. Moreover, traffic performance indicators such as stops and delay are improved significantly.


Geografie ◽  
2011 ◽  
Vol 116 (3) ◽  
pp. 317-334 ◽  
Author(s):  
Tomáš Hudeček ◽  
Radek Churaň ◽  
Jan Kufner

This paper analyzes the automobile accessibility of Prague from the Czech territory over a 100-year period: from the creation of independent Czechoslovakia to the planned completion of an arterial network of motorways and high-speed roadways in 2020. Using publications containing information about the evolution of the road network in Czechia, we digitised historical maps and created geo-databases of the road infrastructure. We then produced accessibility models and performed accessibility analyses for four years – 1920, 1960, 2001 and 2020, using ArcGIS 9.3. These were compared and changes in accessibility were identified using cartographic tools.


Algorithms ◽  
2019 ◽  
Vol 12 (9) ◽  
pp. 196
Author(s):  
Lars Gottesbüren ◽  
Michael Hamann ◽  
Tim Niklas Uhl ◽  
Dorothea Wagner

Graph partitioning has many applications. We consider the acceleration of shortest path queries in road networks using Customizable Contraction Hierarchies (CCH). It is based on computing a nested dissection order by recursively dividing the road network into parts. Recently, with FlowCutter and Inertial Flow, two flow-based graph bipartitioning algorithms have been proposed for road networks. While FlowCutter achieves high-quality results and thus fast query times, it is rather slow. Inertial Flow is particularly fast due to the use of geographical information while still achieving decent query times. We combine the techniques of both algorithms to achieve more than six times faster preprocessing times than FlowCutter and even faster queries on the Europe road network. We show that, using 16 cores of a shared-memory machine, this preprocessing needs four minutes.


Sign in / Sign up

Export Citation Format

Share Document