scholarly journals Determination parameters of geothermal heat-exchangers for biological treatment facilities

2018 ◽  
pp. 61-69
Author(s):  
O. P. Chepak ◽  
◽  
V.K. Kostenko ◽  
O.L. Zavyalova ◽  
M.I. Tavrel ◽  
...  
2011 ◽  
Vol 88 (11) ◽  
pp. 4113-4119 ◽  
Author(s):  
Ping Cui ◽  
Xin Li ◽  
Yi Man ◽  
Zhaohong Fang

Author(s):  
E. I. Vialkova ◽  
E. S. Glushchenko ◽  
T. S. Velizhanina ◽  
E. Y. Osipova

The large part of the Russian Federation locates in arctic and subarctic climatic zones, which determine the specificity of design, construction and operation of sewage systems of these regions. Nowadays, the most part of small Arctic towns has no wastewater treatment facilities, while the available biological treatment facilities do not work properly. An alternative way is physicochemical treatment, which is more resistant to severe climate and volley wastewater discharge than biological treatment. The paper presents the research results of total change the biological into physicochemical treatment. The main stages of such a treatment include coagulation, filtration, oxidation and two-stage filtration (mechanical and absorption). The experiments show a 90.8% decrease in the concentration of chemical oxygen and a 74% and 82.5% decrease in nitrates and ammonium.


Author(s):  
В.А. Кондрашев ◽  
С.Г. Метелица

Рассмотрены вопросы, связанные с проведением пусконаладочных работ биоблока станции очистки хозяйственно-бытовых и близких к ним по составу сточных вод при пробном пуске в эксплуатацию очистных сооружений. Подробно рассмотрены этапы пусконаладочных работ биоблока очистных сооружений с «затравкой» активным илом из действующих биологических очистных сооружений и с дозировкой легкоокисляемой органики. Описан состав оборудования станции КОС-9 производства «Гермес Групп». Рассмотрены все этапы пусконаладочных работ биоблока на примере запуска очистных сооружений КОС-9 с привлечением многочисленных опытных данных. Определены периоды этапов пусконаладки биоблока. Приведены проблемы наладки биоблока и пути их решения с достижением требуемого результата. Технология, используемая на станции, обеспечивает очистку сточных вод, соответствующую требованиям, предъявляемым к выпуску очищенных стоков в водоем рыбохозяйственного значения. Issues related to commissioning a biological treatment plant at the facilities for household and similar in composition wastewater treatment during the trial start of the treatment facilities are considered. The stages of commissioning a biological treatment plant at the wastewater treatment facilities with «inoculating» activated sludge from the operating biological treatment facilities and with dosing easily oxidable organic matter are considered in detail. The equipment configuration of the WWTP-9 produced by Germes Group is described. All stages of the biological treatment plant commissioning are considered through the example of the start-up of WWTP-9 with the use of numerous experimental data. The periods of biological treatment plant commissioning stages have been determined. The problems of adjusting the biological treatment plant and the ways of their elimination to achieve the required result are presented. The technology used at the WWT facilities provides for the effluent quality that meets the requirements for the discharge into a water body of commercial fishing importance.


2020 ◽  
Vol 12 (20) ◽  
pp. 8574 ◽  
Author(s):  
Hong-Duck Ryu ◽  
Do Young Lim ◽  
Sun-Jung Kim ◽  
Un-Il Baek ◽  
Eu Gene Chung ◽  
...  

In this study, we propose the application of struvite precipitation for the sustainable recovery of nitrogen (N) and phosphorus (P) from anaerobic digestion (AD) effluents derived from swine manure. The optimal conditions for four major factors that affect the recovery of N and P were derived by conducting batch experiments on AD effluents obtained from four AD facilities. The optimal conditions were a pH of 10.0, NH4-N:Mg:PO4-P molar ratio of 1:1.4:1, mixing intensity of 240 s−1, and mixing duration of 2 min. Under these optimal conditions, the removal efficiencies of NH4-N and PO4-P were approximately 74% and 83%, respectively, whereas those of Cu and Zn were approximately 74% and 79%, respectively. Herein, a model for swine manure treatment that incorporates AD, struvite precipitation, and biological treatment processes is proposed. We applied this model to 85 public biological treatment facilities in South Korea and recovered 4722 and 51 tons/yr of NH4-N and PO4-P, respectively. The economic analysis of the proposed model’s performance predicts a lack of profitability due to the high cost of chemicals; however, this analysis does not consider the resulting protection of the hydrological environment. Field-scale studies should be conducted in future to prove the effectiveness of the model.


Sign in / Sign up

Export Citation Format

Share Document