678 Challenges of Well Completion Design & Operation Solutions for Deep Gas Well with Multiple Producing Zone in Mildly Overpressured Reservoirs at Offshore Malaysia

2021 ◽  
Author(s):  
Hazirah Abdul Uloom ◽  
Asba Madzidah Abu Bakar ◽  
M. Mifdhal Hussain ◽  
Fuziana Tusimin ◽  
Zaidi Rahimy M. Ghazali ◽  
...  

Abstract Based on the production data from first development campaign in 2017, contamination reading of CO2 and H2S from gas production wells were observed increasing from 3% to 10% and from 3ppm to 16ppm respectively within one year production. These findings have triggered the revisit in 2019 development campaign optimization strategy in terms of material selection, number of wells, reservoir targets, and completion design. Thus, tubing material was upgraded to HP1-13CR for the upper part of tubing up to 10,000 ft-MDDF (feet measure depth drilling rig floor) to avoid SSC risk due to the geostatic undisturbed temperature is less than 80 deg C, however the material of deeper tubing remains as 13CR-L80 as per 2017 campaign. Moreover, the mercury content from first campaign was observed to be above threshold limit from intermediate reservoir based on mercury mapping exercise done in August 2018.As the mercury removal system is not incorporated in the surface facilities, the mercury reading from the well in the 2019 campaign need a close monitoring during well testing so that appropriate action can be taken in case the recorded contaminant reading is high. Dedicated zonal sampling plan to be performed if the commingle zone (total) mercury reading was recorded to be above the threshold limit, and that zones will be shut off to preserve the surface facilities. Opportunity was grabbed to optimize number of wells by completing both shallow and intermediate sections in a single selective completion to maximize the project value. However, this combination will lead to major challenges during operation due to the huge difference in reservoir pressure and permeability contrast in each perforated reservoir as the required overbalanced pressure of completion brine for shallow reservoir is much lesser than the requirement for the mildly overpressure intermediate reservoir. Thus, a potential risk of severe losses and well control is present at shallow reservoir. To mitigate this risk, loss circulation material was pre-spotted in the TCP (Tubing conveyed perforation) BHA prior to fire the gun to allow for self-curing process should losses take place. During the first development campaign, the completion tubing was running in hole in two stages. The lower completion was deployed via drill pipe and the perforated zones was secured with fluid loss device located between lower completion tubing and gravel pack packer. The upper completion tubing was then deployed and tied back to the lower completion packer. This approach was applied as mitigation to prevent fluid losses and to ensure the tubing can be safely deployed to the intended final depth. However, based on the actual performance and losses rate data during the first campaign, the completion design in second campaign was optimized and deployed in single stage. Since shallow and intermediate reservoir were combined in multiple production zones where five SSD (Sliding Side Door) were installed, the slickline option to set packer was waived due to the risk of setting tubing plug in deep wells. Pump out plug was considered as an option but then dropped due to high hydrostatic pressure. The packer setting pressure was too close to plug shear pressure. Therefore, a self-disappearing plug was utilized as it did not require any slickline intervention and can be ruptured by pressure cycle. With this option, risk of pre-mature rupture of plug was eliminated. The paper will discuss in detail each challenge mentioned above together with details calculation that was performed throughout evaluation and selection processes prior best solution being selected as these optimizations resulted in nearly three days saving of rig time, contributing to 2.6% of well cost reduction and the required number of wells were optimized to be three instead of four wells. Moreover, a safer production life of wells by selecting a suitable tubing material and eliminating the risk of mercury production above the above threshold limit.

2021 ◽  
Author(s):  
Bashirul Haq

Abstract Sour gas reservoirs are vital sources for natural gas production. Sulphur deposition in the reservoir reduces a considerable amount of gas production due to permeability reduction. Consequently, well health monitoring and early prediction of Sulphur deposition are crucial for effective gas production from a sour gas reservoir. Dynamic gas material balance analysis is a useful technique in calculating gas initially in place utilizing the flowing wellhead or bottom hole pressures and rates during the well's lifetime. The approach did not apply to monitor a producing gas's health well and detect Sulphur deposition. This work aims to (i) modify dynamic gas material balance equation by adding the Sulphur deposition term, (ii) build a model to predict and validate the issue utilizing the modified equation. A unique form of the flowing material balance is developed by including Sulphur residue term. The curve fitting tool and modified flowing gas material balance are applied to predict well-expected behaviour. The variation between expected and actual performance indicates the health issue of a well. Initial, individual components of the model are tested. Then the model is validated with the known values. The workflow is applied to active gas field and correctly detected the health issue. The novel workflow can accurately predict Sulphur evidence. Besides,the workflow can notify the production engineers to take corrective measures about the subject. Keywords: Sulfur deposition, Dynamic gas material balance analysis, Workflow


Geofluids ◽  
2018 ◽  
Vol 2018 ◽  
pp. 1-11 ◽  
Author(s):  
Yilong Yuan ◽  
Tianfu Xu ◽  
Yingli Xia ◽  
Xin Xin

The effects of geologic conditions and production methods on gas production from hydrate-bearing sediments (HBS) have been widely investigated. The reservoir was usually treated as horizontal distribution, whereas the sloping reservoir was not considered. In fact, most strata have gradients because of the effects of geological structure and diagenesis. In this study, based on currently available geological data from field measurements in Shenhu area of the South China Sea, the effects of formation dip on gas production were investigated through depressurization using a horizontal well. The modeling results indicate that the strategy of horizontal well is an effective production method from the unconfined Class 2 HBS. The predicted cumulative volume of methane produced at the 1000 m horizontal well was 4.51 × 107 ST m3 over 5-year period. The hydrate dissociation behavior of sloping formation is sensitive to changes in the reservoir pressure. As in unconfined marine hydrate reservoir, the sloping formation is not conducive to free methane gas recovery, which results in more dissolved methane produced at the horizontal well. The obvious issue for this challenging target is relatively low exploitation efficiency of methane because of the recovery of very large volumes of water. Consequently, the development of the favorable well completion method to prevent water production is significantly important for realizing large scale hydrate exploitation in the future.


2020 ◽  
Vol 72 (12) ◽  
pp. 10-10
Author(s):  
Pam Boschee

OPEC’s easing of production cuts originally planned for January may be delayed until mid-2021 because of the global increases in COVID-19 cases occurring in November. As restrictions are renewed, extended, or newly instated, fuel demand is expected to decrease. Following a Joint Technical Committee (JTC) meeting on 16 November, OPEC Secretary General Mohammed Sanusi Barkindo underscored the need to remain “vigilant and diligent” in the months ahead. The JTC recommended that supply increases be postponed from 3 to 6 months. The OPEC ministers plan to hold an online meeting on 30 November to decide on production levels among the 13 member countries. By the time you read this in early December, their decisions - and the market responses to them - will be evident. Approximately 7.7 million B/D, or about 8% of global production, are currently tamped down. The recent encouraging announcements of two vaccines’ effectiveness in early clinical trials buoyed oil prices, which are hovering around $40/bbl (West Texas Intermediate closed at $41.38 on 16 November). The past 8 months brought with them upheavals in operators’ and service companies’ short-term reactions to market conditions based on their financial resiliency, and as the pandemic persists, the fallout sputters on as layoffs, bankruptcy filings, mergers and acquisitions, and new collaborative business deals arise almost daily. One sector thought to have bottomed out globally is oilfield services (OFS) and drilling, according to Moody’s Investors Service’s outlook published 13 November. Improvement in earnings is expected to be slow in 2021 as a result of the limited growth forecast in development activities and capital investment. Low and slow growth may be the sector’s motto for some time. The record lows in the third quarter of this year in the drilling rig count and well completion/servicing activity hit the OFS hard after operators reined in capital spending. Some recovery in the US has occurred since August when the rig count tanked at 244. By late October, it neared 300. The international rig count drop has slowed and reached fewer than 700 by later October. Moody’s reported the decrease will continue, but at a slower rate, through the end of this year.


2021 ◽  
Author(s):  
Kabir Hasan Yar'Adua ◽  
Idoko Job John ◽  
Abubakar Jibril Abbas ◽  
Salihu M. Suleiman ◽  
Abdullahi A. Ahmadu ◽  
...  

Abstract Despite the recent wide embrace of mechanical descaling approaches for cleaning scales in petroleum production tubings and similar conduits with the use of high-pressure (HP) water jets, the process is still associated with downhole backpressure and well integrity challenges. While the introduction of sterling beads to replace sand particles in the water recorded high successes in maintaining well completion integrity after scale removal in some recent applications of this technique, it is, unfortunately, still not without questions of environmental degradation. Furthermore, the single nozzle, solids-free, aerated jetting descaling technique – recently published widely – is categorized with low scale surface area of contact, low descaling efficiency and subsequent high descaling rig time. The modifications to mechanical descaling techniques proposed in this work involve the use of three high-pressure flat fan nozzles of varying nozzles arrangements, standoff distances and injection pressures to remove soft scale deposits in oil and gas production tubings and similar circular conduits. This experiment provides further insights into the removal of paraffin scales of various shapes at different descaling conditions of injection pressures, stand-off distances and nozzle arrangements with the use of freshwater. The results obtained from this study also show consistency with findings from earlier works on the same subject.


2018 ◽  
Vol 41 ◽  
pp. 01025 ◽  
Author(s):  
Fares Abu-Abed

Today complications during drilling and operation of oil and gas wells are unavoidable. Most of them are the result of violation of technological discipline (technology), some are due to insufficient knowledge of geological and physical conditions (especially in exploratory drilling), a lack of understanding of the causes of the phenomena preceding the complication. Sometimes performers in performing complex technological operations go to the so-called “justified” risk, as a result of which complications and accidents occur. It should be taken into account that the failure of the well even for a short time - the loss of oil and gas production. Therefore, the development of modern methods for their detection, prevention (prevention) and methods to combat their consequences is an urgent task.


2013 ◽  
Vol 690-693 ◽  
pp. 1516-1519
Author(s):  
Ling Feng Li

For natural gas well in sour gas reservoirs, very serious corrosion in the gas well string is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly introduces the tubing and casing corrosion in sour gas reservoirs, corrosion-resistant material selection of tubing and casing in sour gas reservoirs and proposes the optimization idea and technique of tubing material selection.. By taking W 63 well as an example, this paper optimizes the material selection of production casing for W 63 well. For application, the optimal materials of gas well string in W 63 well have good performance of corrosion resistance.


2017 ◽  
Vol 57 (1) ◽  
pp. 277
Author(s):  
Daren Shields ◽  
Fengde Zhou ◽  
Joan Esterle

Following two decades of intensive exploration, coal seam gas (CSG) production in the Surat Basin has begun to dramatically increase to meet the capacity of three newly completed CSG to liquefied natural gas (LNG) export projects. As the industry’s focus shifts from appraisal to exploitation, the production forecasts underpinning these LNG projects are being tested. In some cases predicted reservoir performance is found to be invalidated by observed production data, a condition that may require costly amendments to project schedule and scope. The deviation between actual and predicted reservoir performance can often be attributed to an incomplete understanding of parametric uncertainties present in static or dynamic reservoir models. To address this limitation, this study aims to explore the parametric controls upon CSG production behaviours with a series of simulation experiments. Distributions of reservoir parameters were compiled from 152 open-source well completion reports available in three areas along the eastern edge of the Surat Basin. These distributions were validated and then sampled to extract representative ranges for subsurface factors including gas content, permeability, net coal thickness, Langmuir pressure, Langmuir volume and drainage area. These inputs were used to construct single well radial models, which were then simulated to generate predictions of monthly and cumulative produced fluid volumes. The results of this study indicate that net coal thickness and lateral coal connectivity are the most sensitive factors with respect to cumulative gas production, while permeability was the single most influential parameter affecting the rate of gas production.


2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Jia Li ◽  
Dongmin Li ◽  
Peisi Zhong ◽  
Guofang Ma ◽  
Hengxuan Luan ◽  
...  

At present, drilling rig is a common equipment for controlling gas outburst generated in underground coal mine, and rib drill pipe is an important component of drilling rig. Due to the insufficiency of slag discharge capacity, pipe-sticking accidents often occur during the drilling process, which greatly reduces the effect of gas control. In order to improve the capacity of slag discharge of rib drill pipe, the mechanism of slag removal was analyzed, and the process of slag discharge was simulated as a gas-solid two-phase flow coupling process. Utilizing the computational fluid dynamics method, the process of slag discharge was simulated on the Edem-Fluent cosimulation platform. The structural parameters of the drill pipe affecting the capacity of slag discharge were derived. Based on the analysis results, the structural parameters of rib drill pipe were optimized by orthogonal experiment method. The global optimal results were obtained as follows: its pitch, blade height, and blade width are 120 mm, 3 mm, and 15 mm, respectively. Therefore, the results of slag discharge experiment on the optimum structure of rig drill pipe show that the slag discharge efficiency is increased by 11.38%, which effectively resolves the pipe-sticking problem.


2012 ◽  
Vol 485 ◽  
pp. 429-432
Author(s):  
Ling Feng Li ◽  
Xiao Ming Liu ◽  
Zhi Qiang Huang

For natural gas well with high content of CO2 and H2S, very serious corrosion in the gas well string is an important factor of gas production system life. In order to ensure the long-term development of gas wells, this paper mainly study the corrosion-resistant material selection of tubing and casing in sour gas reservoirs under coexistence of H2S and CO2 and proposes the optimization idea and technique of tubing and casing material selection. By taking Puguang gas field as an example, this paper optimizes the material selection of production casing for Puguang gas field. By testing, the optimal materials of gas well string in Puguang gas field have good performance of erosion resistance


Sign in / Sign up

Export Citation Format

Share Document