scholarly journals A New Circulating Accumulation Emission Model for Assessing Dust Emission From Open Pit Mine

Author(s):  
TANG Wanjun ◽  
LI Fengming

Abstract In order to reduce the inaccuracy of using the monitoring data outside the pit to evaluate the unorganized emission dust source of open pit mine, the circulating accumulation emission model is established. Based on the model, the monitoring data in the pit can be converted into the dust emission from the pit. Main conclusions include: (1) the circulating accumulation emission model is suitable for the dust diffusion process in open pit mine. The model contains three part, which correspond to dust emission, retention and diffusion in open pit mine. (2) The initial value of the dust in the pit before the team operation has little influence on the final stable value. (3) The dust background value of surrounding environment monitored outside the pit can not be directly used. When the dust enters the pit, it will accumulate under the action of eddy current. To eliminate the effect of background value, the monitoring data should be subtracted by the accumulated value. (4) The dust emission from the pit can be calculated in a certain monitoring period based on the circulating accumulation emission model. Hence the dust emission assessment of open pit can be completed more efficiently based on this model.

2021 ◽  
Vol 11 (1) ◽  
Author(s):  
Wanjun Tang ◽  
Fengming Li

AbstractTo reduce the inaccuracy of using the monitoring data outside the pit to evaluate the unorganized emission dust source of open pit mine, the circulating accumulation emission model is established. Based on the model, the monitoring data in the pit can be converted into the dust emission from the pit. The main conclusions include: (1) the circulating accumulation emission model is suitable for the dust diffusion process in open pit mine. The ratio of diffusion $$\mu$$ μ and the ratio of surplus $$\varepsilon$$ ε were used to simulate the dust diffusion process in open pit mine, containing emission, retention and diffusion. (2) The initial value of the dust in the pit before the team operation has little influence on the final stable value. (3) When the external dust enters the pit, it will accumulate under the action of eddy current. The dust background value in the pit is different from that outside the pit. (4) The dust emission from the pit can be calculated from the monitoring data in the pit based on the circulating accumulation emission model. The model can deal with environmental changes such as the wind direction and speed, without arranging a lot of external monitoring equipment like the traditional external monitoring methods.


2020 ◽  
Vol 7 (4) ◽  
pp. 714-724
Author(s):  
Zhao Hongze ◽  
Wang Dongyu ◽  
Ma Ming ◽  
Zheng Kaihui

AbstractIn light of the complex and dynamic mechanical properties of evolving weak strata in open-pit mines, and the consequent difficulty of determining their mechanical parameters, this study uses the ultimate balance theory, along with the back analysis method combined with monitoring data on field displacement, to carry out parameter inversion using the FLAC3D numerical simulation software. The edge slope of a working pit of the Weijiamao open-pit mine was used as research object to this end. As the results obtained by the constitutive model were consistent with the field monitoring data, the evolving weak strata in the slope and the position of the landslide in the mine could be obtained. The landslide was directed northeast. The mechanism of the edge slope of the working pit was identified as unloading shear failure, and the feasibility of the method of parameter inversion was verified. The internal friction angle ϕ and cohesion C of evolving weak strata in the slope of the open-pit mine were also obtained, where this compensated for the deficiency of laboratory tests and enabled the transformation from qualitative to quantitative analysis. This can provide a reliable basis for the safe operation of open-pit mines.


2018 ◽  
Vol 11 (1) ◽  
pp. 4 ◽  
Author(s):  
Stefanie Feuerstein ◽  
Kerstin Schepanski

Although mineral dust plays a key role in the Earth’s climate system and in climate and weather prediction, models still have difficulties in predicting the amount and distribution of mineral dust in the atmosphere. One reason for this is the limited understanding of the distribution of dust sources and their behavior with respect to their spatiotemporal variability in activity. For a better estimation of the atmospheric dust load, this paper presents an approach to localize dust sources and thereby estimate the sediment supply for a study area centered on the Aïr Massif in Niger with a north–south extent of 16 ∘ –22 ∘ N and an east–west extent of 4 ∘ –12 ∘ E. This approach uses optical Sentinel-2 data at visible and near infrared wavelengths together with HydroSHEDS flow accumulation data to localize ephemeral riverbeds. Visible channels from Sentinel-2 data are used to detect sand sheets and dunes. The identified sediment supply map was compared to the dust source activation frequency derived from the analysis of Desert-Dust-RGB imagery from the Meteosat Second Generation series of satellites. This comparison reveals the strong connection between dust activity, prevailing meteorology and sediment supply. In a second step, the sediment supply information was implemented in a dust-emission model. The simulated emission flux shows how much the model results benefit from the updated sediment supply information in localizing the main dust sources and in retrieving the seasonality of dust activity from these sources. The described approach to characterize dust sources can be implemented in other regional model studies, or even globally, and can thereby help to get a more accurate picture of dust source distribution and a more realistic estimation of the atmospheric dust load.


2014 ◽  
Vol 1010-1012 ◽  
pp. 1540-1543
Author(s):  
Jun Fu Fan ◽  
Zi Ling Song

In order to backfill the west open-pit mine in Fushun which is abandoned soon, the key technology of chute process has been studied. According to the movement rules of materials in the chute, using the method of theoretical calculation and laboratory simulation , U chute with inclination angle of 33°has been determined, mathematical model of material transportation in the chute has been established, the distance and height of materials reaching the bottom of the chute has been determined and the protective wall with hight of 2 m, distance of 24 m to the chute has been designed. Meanwhile, by numerical simulations, rules of dust transportation and diffusion in the chute has been studied , dusts finer than 100µm has been identified as the main pollutants, and the chute process of dust-protected has been put forward .


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


Sign in / Sign up

Export Citation Format

Share Document