Wastewater treatment in tsunami affected areas of Thailand by constructed wetlands

2007 ◽  
Vol 56 (3) ◽  
pp. 69-74 ◽  
Author(s):  
H. Brix ◽  
T. Koottatep ◽  
C.H. Laugesen

The tsunami of December 2004 destroyed infrastructure in many coastal areas in South-East Asia. In January 2005, the Danish Government gave a tsunami relief grant to Thailand to re-establish the wastewater management services in some of the areas affected by the tsunami. This paper describes the systems which have been built at three locations: (a) Baan Pru Teau: A newly-built township for tsunami victims which was constructed with the contribution of the Thai Red Cross. Conventional septic tanks were installed for the treatment of blackwater from each household and its effluent and grey water (40 m3/day) are collected and treated at a 220 m2 subsurface flow constructed wetland. (b) Koh Phi Phi Don island: A wastewater collection system for the main business and hotel area of the island, a pumping station and a pressure pipe to the treatment facility, a multi-stage constructed wetland system and a system for reuse of treated wastewater. The constructed wetland system (capacity 400 m3/day) consists of vertical flow, horizontal subsurface flow, free water surface flow and pond units. Because the treatment plant is surrounded by resorts, restaurants and shops, the constructed wetland systems are designed with terrains as scenic landscaping. (c) Patong: A 5,000 m2 constructed wetland system has been established to treat polluted water from drainage canals which collect overflow from septic tanks and grey water from residential areas. It is envisaged that these three systems will serve as prototype demonstration systems for appropriate wastewater management in Thailand and other tropical countries.

2019 ◽  
Vol 50 (4) ◽  
Author(s):  
Rahi & Faisal

 Reuse of treated wastewater for irrigation purpose can reduce high pressure on freshwater resources. A horizontal subsurface flow constructed wetland (HSSF CW) system filled with gravel and planted with Phragmites Australia was used to treat the real wastewater at Al-Rustumia wastewater treatment plant. Some characteristics of wastewater such as biochemical oxygen demand, phosphate and total suspended solids have been monitored from 15 January until 8 July 2018. The results proved that HSSF unit has a good efficacy in the reduction of previous parameters with removal of 84.2, 55.4 and 72.7% while sulphate and total dissolved solids were less removal efficiency with 3.3 and  0.99 % respectively. The measured values of these parameters were within the permissible limits suitable for irrigation purposes.


2019 ◽  
Vol 42 (5) ◽  
pp. 207-218
Author(s):  
Morio TSUJI ◽  
Kunihiko KATO ◽  
Masashi SASAKI ◽  
Fukumichi KIKUCHI ◽  
Hidehiro IETSUGU ◽  
...  

2005 ◽  
Vol 51 (9) ◽  
pp. 137-144 ◽  
Author(s):  
A. Noorvee ◽  
E. Põldvere ◽  
Ü. Mander

Data from 18 sampling wells in Kodijärve horizontal subsurface flow (HSSF) constructed wetland (CW) (South Estonia) is presented and differences in purification efficiencies inside the HSSF CW are calculated. Temporarily anaerobic conditions in the Kodijärve HSSF system did not allow efficient removal of BOD7, NH4-N, Ntot and Ptot. In 2002 a vertical subsurface flow filter was constructed to enhance aeration. The design of the system was based simply on the oxygen demand of the wastewater and on the aeration potential of vertical flow wetlands. The vertical flow system has shown satisfactory results. The purification efficiency of BOD7 in the Kodijärve CW has improved significantly and there has been a slight increase in purification efficiencies of NH4-N and Ntot. On the ohther hand, the removal efficiency of Ptot has decreased significantly. Although, the mass loading rates have increased, mass removal rates of all four parameters have improved significantly. Nevertheless, optimization of the constructed wetland system is essential in order to meet effluent standards during wintertime.


2019 ◽  
pp. 297-305
Author(s):  
Hanna Obarska-Pempkowiak ◽  
Katarzyna Klimkowska

In the last decade constructed wetlands have become a very popular technology for removal of contaminants from domestic sewage. They are also assesed from the point of view of their capacity for removal of toxic heavy metals and organic substances resistant to degradation. Constructed wetland in Przywidz localized about 60 km from Gdansk is a pilot wastewater treatment plant (WWTP) designed for 150 PE (person equivalent). The system consists of two sections: vegetated submerged bed (VSB) with horizontal flow of sewage and a cascade filter situated on a slope of a hill. Domestic sewage after a conventional pretreatment ( consists of an Imhoff tank and a trickling filter) is pumped to the VSB filter located on slope of the hill. Total area of constructed wetland is about 870 m2. In the period 1995-98 the measurments of several heavy metals (Cd, Cu, Pb) were carried out. These measurments were carried out in inflowing and outflowing sewage and as well in samples collected from each section of constructed wetland system. In particular analysis of sediment collected in ditches of the cascade filter, filling material of the dykes, VSB filter and plants were carried out. It was found out that content of heavy metals in suspended soil decreased along the course of treatment, starting from VSB filter, through the first ditch to the last ditch. Measurable concentration of dissolved heavy metals were found in sewage collected from several subsequent ditches. The main mechanism of removal on particular matter in subsequent ditches was sorption.


2017 ◽  
Vol 3 (5) ◽  
pp. 52
Author(s):  
Rengaraj Chithra Devi ◽  
Nirmaladevi D. Shrinithivihahshini ◽  
Rajendran Viji

Water is inevitable for our life. Due to the population growth, there is a tremendous pressure on the existing fresh water resources such as surface water and ground water. Increasing water demand and improper usage of potable water lead to scarcity of fresh water resources. Globally, treating grey water is a real constraint to minimize the problem of water scarcity. The continuous flow-based constructed wetland system for grey water treatment is a technique for reusing the domestic grey water and it is a low-cost method. The current study was aimed to evolve a suitable user-friendly treatment system for handling the household grey water. In the present study, grey water has been collected from the Bharathidasan University and it has been treated with biofiltration and rhizhodegradation techniques using continuous flow-based constructed wetland system. The system has been found as more effective for treating the Physico-chemical parameters such as suspended solids, pH, electrical conductivity, TS, TDS, DO, BOD, COD, TOC, CO3, HCO3, SO4, NO3, PO4, Ca, Mg, Na, K, total hardness, calcium hardness, chloride, and total alkalinity. The results reported the reduction in the biological oxygen demand (89%), chemical oxygen demand (81%), DO (95%), carbonate (100%), sodium (65%), and potassium (85%).It also examined the benefits and risks associated with the results in the reuse of domestic grey water for the purpose of vegetable gardening, irrigation, and toilet flushing. Consequently, this biofiltration method is natural, simple, and low cost-effective treatment in a holistic manner.