All 1000 MW nuclear power plants currently in construction or projected to-be-built in China will use the digital instrumentation and control (I&C) systems. Safety and reliability are the ultimate concern for the digital I&C systems. To obtain high confidence in the safety of digital I&C systems, rigorous software verification and validation (V&V) life-cycle methodologies are necessary. The V&V life-cycle process ensures that the requirements of the system and software are correct, complete, and traceable; that the requirements at the end of each life-cycle phase fulfill the requirements imposed by the previous phase; and the final product meets the user-specified requirements. The V&V process is best illustrated via the so-called V-model. This paper describes the V-model in detail by some examples. Through the examples demonstration, it is shown that the process detailed in the V-model is consistent with the IEEE Std 1012-1998, which is endorsed by the US Regulatory Guide 1.168-2004. The examples show that the V-model process detailed in this paper provides an effective V&V approach for digital I&C systems used in nuclear power plants. Additionally, in order to obtain a qualitative mathematical description of the V-model, we study its topological structure in graph theory. This study confirms the rationality of the V-model. Finally, the V&V approach affording protection against common-cause failure from design deficiencies, and manufacturing errors is explored. We conclude that rigorous V&V activities using the V-model are creditable in reducing the risk of common-cause failures.


Author(s):  
Pengyi Peng ◽  
Weidong Liu ◽  
Zhichao Yang

Instrumentation and control (I&C) systems in nuclear power plants (NPPs) have the ability to initiate the safety-related functions necessary to shut down the plants and maintain the plants in a safe shutdown condition. I&C systems of low reliability will bring risks to the safe operation of NPPs. A sufficient level of redundancy and diversity of I&C design to ensure the safety is a major focus when designing a new reactor. Usually multiple signal paths are included in an I&C system design. Meanwhile, besides the protection and safety monitoring system (PMS), other sub-systems of I&C such as the diverse actuation system (DAS) will be included as a diverse backup of PMS to perform the functions of reactor trip and engineered safety features actuation systems (ESFAS). However, the construction costs increase as the level of system redundancy and diversity grows. In fact, from the perspective of deterministic theory, an I&C system of only two chains can meet the single failure criterion. So how to obtain the balance of safety and economy is a challenging problem in I&C system designing. Probabilistic Safety Assessment (PSA) is the most commonly used quantitative risk assessment tool for decision-making in selecting the optimal design among alternative options. In this paper, PSA technique was used to identify whether the I&C system design offers adequate redundancy, diversity, and independence with sufficient defense-in-depth and safety margins in the design of a new reactor. Firstly, detailed risk assessment criteria for I&C design were studied and identified in accordance with nuclear regulations. Secondly, different designs were appropriately modeled, and the risk insights were provided, showing the balance of safety and economy of each design. Furthermore, potential design improvements were evaluated in terms of the current risk assessment criterion. In the end, the optimal design was determined, and uncertainty analyses were performed. The results showed that all four designs analyzed in this paper were met the safety goals in terms of PSA, but each design had a different impact on the balance of risk. As the support systems of the NPP we analyzed were relatively weak, loss of off-site power and loss of service water were two main risk contributors. The common cause failure of reactor trip breakers and the sensors of containment pressure were risk-significant. After identifying the major risk factors, the I&C design team can perform subsequent optimizations in the further design based on the PSA results and achieve an optimal balance between safety and economy.


Author(s):  
John W. Collins

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four-step risk assessment process needed to determine a clear path forward to mature needed technology and design, license, and construct advanced first-of-a-kind nuclear power plants, including Small Modular Reactors. This four-step process has been carefully applied to the Next Generation Nuclear Plant.


Author(s):  
Shuqiao Zhou ◽  
Chao Guo ◽  
Duo Li ◽  
Xiaojin Huang

Digital instrumentation and control (I&C) systems are widely used in many industrial areas. In the recent years, the digitalization process for nuclear power plants has also been moving on rapidly. Full digital I&C systems are now adopted in almost all new constructed nuclear power plants. The architecture of a digital I&C system plays a pivotal role for the safety, reliability and security of the whole nuclear power plant. Moreover, for the advanced small modular reactors, both the reliability and extensibility of I&C systems are especially required. Therefore, in this paper we propose a new architecture of the digital I&C systems based on the developed computing performance and communication technology. The control units and the data servers in the new proposed architecture are decentralized and working in a mutually redundant and distributed computing/storage way. Thus the architecture is with a flexible extensibility. Moreover, other control units or data servers can take over the functions of a certain number of failed ones. This characteristic benefits the system’s reliability significantly. The reliability of the new architecture is theoretically evaluated and the results demonstrate that it is much higher than that of the traditional architecture of I&C systems.