scholarly journals Energy-Integrating Master Plan for the City of Atlantic City, New Jersey: energy conservation element. Volume 3

1978 ◽  
Author(s):  

2014 ◽  
Vol 12 (3) ◽  
pp. 219 ◽  
Author(s):  
Patrick D. O’Neil, PhD, Capt. USN (ret)

This article analyzes the problems surrounding the execution of emergency evacuation orders by evaluating Hurricane Sandy and the emergency actions taken by the State of New Jersey and the City of Atlantic City New Jersey. The analysis provides an overview of the legal authority granting emergency powers to governors and mayors to issue evacuation proclamations in addition to an evaluation of the New Jersey’s emergency evacuation mandate and subsequent compliance. The article concludes with provision of planning and preparedness recommendations for public managers facing similar hazards, including a recommendation for provision of emergency shelter contingencies within the threat zone in anticipation of citizen noncompliance evacuation orders.



The main principle of the strategy for the complex improvement of the functioning of northern cities in winter, including their infrastructure development, is a comprehensive solution of the problem of industrial-scale snow-mass collection, removal and utilization at different areas of urban roadway networks. For its implementation in the capital of Russia, “MosvodokanalNIIproject” JSC developed in 2002 the Snow Removal Master Plan for the city of Moscow. The meteorological conditions in the city, which have changed considerably in the recent years, including the changes in the snow-cover depth and in the road-surface areas to be cleaned, as well as emerging of new technologies for the cleaning of urban streets, yards and sidewalks and some new types of deicing agents, resulted in the necessity to update the above-mentioned Snow Removal Master Plan developed for the city of Moscow. Efficient application of deicing agents is of special importance for its updating in the context of the environmental safety of the city in a winter period. The article considers the results of the implementation of the updated Snow Removal Master Plan and contains some proposals concerning snow removal under the conditions of extreme snowfalls.





STORIA URBANA ◽  
2009 ◽  
pp. 53-80
Author(s):  
Zsuzsa Ordasi

- Unlike other great cities of Europe, Budapest did not experience any significant urban development before the nineteenth century, especially before 1867, the year of the foundation of the Austro-Hungarian Monarchy. After that, the city became the second pole, after Vienna, of this important European state. The capital of the Kingdom of Hungary grew through the use of various types of urban architecture and especially through a "style" that was meant to express Hungarian national identity. Architects, engineers, and other professionals from Hungary and Austria contributed to this process of modernization as well as many foreigners from Germany, France and England. The city's master plan - modeled after Paris's - focused on the area crossed by the Viale Sugár [Boulevard of the Spoke] was set on the Parisian model and so covered only certain parts of the city. The Committee on Public Works (1870-1948) played a leading role in putting the plan approved in 1972 - into effect in all aspects of urban planning, architecture and infrastructure.



2021 ◽  
Author(s):  
Mercy Romero

In Toward Camden, Mercy Romero writes about the relationships that make and sustain the largely African American and Puerto Rican Cramer Hill neighborhood in New Jersey where she grew up. She walks the city and writes outdoors to think about the collapse and transformation of property. She revisits lost and empty houses—her family's house, the Walt Whitman House, and the landscape of a vacant lot. Throughout, Romero engages with the aesthetics of fragment and ruin; her writing juts against idioms of redevelopment. She resists narratives of the city that are inextricable from crime and decline and witnesses everyday lives lived at the intersection of spatial and Puerto Rican diasporic memory. Toward Camden travels between what official reports say and what the city's vacant lots withhold. Duke University Press Scholars of Color First Book Award recipient



2005 ◽  
Vol 21 (1_suppl) ◽  
pp. 487-511 ◽  
Author(s):  
Bijan Khazai ◽  
Elizabeth Hausler

The earthquake of 26 December 2003 destroyed about 85% of the housing stock and left up to 75,600 people in the city of Bam homeless. With the convergence of migrants from nearby villages, it is estimated that 155,000 people were in need of shelter in Bam and surrounding villages. A municipal governmental Master Plan for the reconstruction of Bam was completed in September 2004. Permanent housing construction in the city of Bam began in October 2004, and is scheduled to take three to five years. In the interim, intermediate shelter construction in Bam and reconstruction of permanent shelter in the surrounding villages is ongoing and work is being done to integrate relief operations into long-term recovery, rehabilitation, and reconstruction programs. At the time of the reconnaissance trip in late May 2004, 16,200 intermediate shelters were assembled in Bam, either on the sites of original dwellings or on campgrounds on the outskirts of the city, and over 2,500 permanent shelters were constructed in the surrounding villages.



Sign in / Sign up

Export Citation Format

Share Document