WAMS - based control of series FACTS devices installed in tie-lines of interconnected power system

2010 ◽  
Vol 59 (3-4) ◽  
pp. 121-140 ◽  
Author(s):  
Łukasz Nogal ◽  
Jan Machowski

WAMS - based control of series FACTS devices installed in tie-lines of interconnected power systemThis paper addresses the state-variable stabilising control of the power system using such series FACTS devices as TCPAR installed in the tie-line connecting control areas in an interconnected power system. This stabilising control is activated in the transient state and is supplementary with respect to the main steady-state control designed for power flow regulation. Stabilising control laws, proposed in this paper, have been derived for a linear multi-machine system model using direct Lyapunov method with the aim to maximise the rate of energy dissipation during power swings and therefore maximisation their damping. The proposed control strategy is executed by a multi-loop controller with frequency deviations in all control areas used as the input signals. Validity of the proposed state-variable control has been confirmed by modal analysis and by computer simulation for a multi-machine test system.

Author(s):  
Mahmood Khalid Zarkani ◽  
Ahmed Sahib Tukkee ◽  
Mohammed Jasim Alali

<p>The rapid and enormous growths of the power electronics industries have made the flexible AC transmission system (FACTS) devices efficient and viable for utility application to increase power system operation controllability as well as flexibility. This research work presents the application of an evolutionary algorithm namely differential evolution (DE) approach to optimize the location and size of three main types of FACTS devices in order to minimize the power system losses as well as improving the network voltage profile. The utilized system has been reactively loaded beginning from the base to 150% and the system performance is analyzed with and without FACTS devices in order to confirm its importance within the power system. Thyristor controlled series capacitor (TCSC), unified power flow controller (UPFC) and static var compensator (SVC) are used in this research work to monitor the active and reactive power of the carried out system. The adopted algorithm has been examined on IEEE 30-bus test system. The obtained research findings are given with appropriate discussion and considered as quite encouraging that will be valuable in electrical grid restructuring.</p>


Author(s):  
Elutunji Buraimoh ◽  
Funso Kehinde Ariyo ◽  
Micheal Omoigui ◽  
Innocent Ewaen Davidson

Electrical power systems are often required to operate at full loading capacity due to ever increasing demand and transmission line contingencies with limited grid expansion. This results in line overload and operating near system limit, thereby threatening system security. Utilization of existing system can be achieved using Flexible Alternating Current Transmission System (FACTS) devices without violating system limits. This research investigation involves static security assessment of a modelled IEEE 30-bus test system in MATLAB/SIMULINK/PSAT environment. The security status with the incorporation of combined Static Var Compensator (SVC), Thyristor Controlled Series Compensator (TCSC) and Interline Power Flow Controller (IPFC) were determined. Prior to this, Contingency Severity Index (CSI) based on Performance Index (PI) of Voltage and Active Power was employed to determine the optimal location of the FACTS devices. Sequential Quadratic Programming (SQP) was applied to determine the optimal sizing/percentage compensation of FACTS. Subsequently, power system with and without the incorporation of FACTS devices were modelled. The ability of the compensated system to withstand credible transmission line contingencies without violating the normal operating limits (bus voltage and line thermal) was examined and presented. The paper presents how combined SVC/TCSC and an IPFC aided the power system to boost its steady state security in the face of possible line contingencies.


Author(s):  
Sai Ram Inkollu ◽  
Venkata Reddy Kota

<p>Improvement of power system performance in terms of increased voltage profile and decreased transmission loss is becoming one of the challenging tasks to the system operators under open access environment. Apart from traditional power flow controlling devices, use of Flexible AC Transmission System (FACTS) devices can give an attractive solution for the operation and control of deregulated power system. The type, size, location and number of FACTS devices are to be optimized appropriately in order to get the targeted benefits. In this paper, two FACTS devices, Thyristor Controller Phase Shift Transformer (TCPST) and Interline Power Flow Controller (IPFC) are selected to obtain the required performance such as improvement of voltage profile and loss minimization. To search the optimal location and optimal rating of the selected FACTS devices, a hybrid algorithm which formulated with Particle Swarm Optimization (PSO) and Gravitational Search Algorithm (GSA) is proposed. At the first step, the optimization problem is solved for finding the optimal location of FACTS devices using PSO with an objective of voltage profile maximization and later GSA is implemented to optimize their parameters with an objective of transmission loss minimization. The proposed method is implemented on IEEE 30-bus test system and from the simulation results it can be proved that this technique is well suited for real-time application.  </p><p align="center"><strong><br /></strong></p>


2019 ◽  
Vol 9 (6) ◽  
pp. 4893-4900 ◽  
Author(s):  
N. E. Akpeke ◽  
C. M. Muriithi ◽  
C. Mwaniki

The increasing penetration of wind energy to the conventional power system due to the rapid growth of energy demand has led to the consideration of different wind turbine generator technologies. In fault conditions, the frequency of the power system decreases and eventually leads to speed differences between the grid and the interconnected wind generator. This can result to power system problems such as transient instability (TS). This paper focuses on enhancing the TS of a permanent magnet synchronous generator (PMSG)-based power system during 3ph fault conditions using FACTS devices. The power system considered is connected to a large wind farm which is based on PMSG. Critical clearing time (CCT) is used as an index to evaluate the transient state of the system. Under the study of an IEEE-14 bus system using PSAT as a simulation tool, the integrated CCT with PMSG-based wind turbine is improved with three independent FACTS devices. One of the synchronous generators in the test system has been replaced at random with the PMSG-based wind turbine which is meant to generate an equivalent power. Time domain simulations (TDSs) were carried out considering four study cases. Simulation results show that the (CCT) of the system with the FACTS devices is longer than the CCT without them, which is an indication of TS improvement.


The power flow control is one the important part of power system to maintain power system stability. If the real power and reactive power can be controlled then the automatic control of the power system gives numerous possibilities. The Flexible AC Transmission System (FACTs) are the devices meant for this operation. There are series and shunt type of FACTs devices available. The Unified Power Flow Controller (UPFC) is one of the best devices in FACTs devices in AC power system. The power flows can be controlled in series and shunt connections using the two converters. The power oscillations are common in UPFC when the reference powers are changed. The PI controllers are replaced with PSOA tuned PI controller to reduces the power oscillations and reduces the settling time. The problem is formulated to minimize the settling time of the power value. The series and shunt controllers are tuned with particle swarm optimization algorithm (PSOA) to tune the PI controller parameters available in it. The MATLAB Simulink version 2017b is used here for the analysis and well known UPFC test system with three generators are used here for testing the proposed method. The results show PSOA tuned PI controller provides better oscillation damping with reduced settling time.


Energies ◽  
2019 ◽  
Vol 12 (2) ◽  
pp. 322 ◽  
Author(s):  
Ping He ◽  
Seyed Arefifar ◽  
Congshan Li ◽  
Fushuan Wen ◽  
Yuqi Ji ◽  
...  

The well-developed unified power flow controller (UPFC) has demonstrated its capability in providing voltage support and improving power system stability. The objective of this paper is to demonstrate the capability of the UPFC in mitigating oscillations in a wind farm integrated power system by employing eigenvalue analysis and dynamic time-domain simulation approaches. For this purpose, a power oscillation damping controller (PODC) of the UPFC is designed for damping oscillations caused by disturbances in a given interconnected power system, including the change in tie-line power, the changes of wind power outputs, and others. Simulations are carried out for two sample power systems, i.e., a four-machine system and an eight-machine system, for demonstration. Numerous eigenvalue analysis and dynamic time-domain simulation results confirm that the UPFC equipped with the designed PODC can effectively suppress oscillations of power systems under various disturbance scenarios.


Load frequency control (LFC) in interconnected power system of small distribution generation (DG) for reliability in distribution system. The main objective is to performance evaluation load frequency control of hybrid for interconnected two-area power systems. The simulation consist of solar farm 10 MW and gasifier plant 300 kW two-area in tie line. This impact LFC can be address as a problem on how to effectively utilize the total tie-line power flow at small DG. To performance evaluation and improve that defect of LFC, the power flow of two-areas LFC system have been carefully studied, such that, the power flow and power stability is partially LFC of small DG of hybrid for interconnected two-areas power systems. Namely, the controller and structural properties of the multi-areas LFC system are similar to the properties of hybrid for interconnected two-area LFC system. Inspired by the above properties, the controller that is propose to design some proportional-integral-derivative (PID) control laws for the two-areas LFC system successfully works out the aforementioned problem. The power system of renewable of solar farm and gasifier plant in interconnected distribution power system of area in tie – line have simulation parameter by PID controller. Simulation results showed that 3 types of the controller have deviation frequency about 0.025 Hz when tie-line load changed 1 MW and large disturbance respectively. From interconnected power system the steady state time respond is 5.2 seconds for non-controller system, 4.3 seconds for automatic voltage regulator (AVR) and 1.4 seconds for under controlled system at 0.01 per unit (p.u.) with PID controller. Therefore, the PID control has the better efficiency non-controller 28 % and AVR 15 %. The result of simulation in research to be interconnected distribution power system substation of area in tie - line control for little generate storage for grid connected at better efficiency and optimization of renewable for hybrid. It can be conclude that this study can use for applying to the distribution power system to increase efficiency and power system stability of area in tie – line.


2012 ◽  
Vol 63 (5) ◽  
pp. 316-321 ◽  
Author(s):  
Fatiha Lakdja ◽  
Fatima Zohra Gherbi ◽  
Redouane Berber ◽  
Houari Boudjella

Very few publications have been focused on the mathematical modeling of Flexible Alternating Current Transmission Systems (FACTS) -devices in optimal power flow analysis. A Thyristor Controlled Series Capacitors (TCSC) model has been proposed, and the model has been implemented in a successive QP. The mathematical models for TCSC have been established, and the Optimal Power Flow (OPF) problem with these FACTS-devices is solved by Newtons method. This article employs the Newton- based OPF-TCSC solver of MATLAB Simulator, thus it is essential to understand the development of OPF and the suitability of Newton-based algorithms for solving OPF-TCSC problem. The proposed concept was tested and validated with TCSC in twenty six-bus test system. Result shows that, when TCSC is used to relieve congestion in the system and the investment on TCSC can be recovered, with a new and original idea of integration.


IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 18036-18063 ◽  
Author(s):  
Imdadullah ◽  
Syed Muhammad Amrr ◽  
M. S. Jamil Asghar ◽  
Imtiaz Ashraf ◽  
Mohammad Meraj

2014 ◽  
Vol 536-537 ◽  
pp. 1542-1546
Author(s):  
Xun Gao ◽  
Jie Meng ◽  
Yi Qun Li ◽  
Ying Wang ◽  
Wen Chao Zhang

A phenomenon that the damping ratio will decrease when the power flows from both sides to the primary power grid is summarized and analyzed in the paper. Based on analysis of the damping ratio change of West Inner Mongolia-Shandong oscillation under the sequential operation mode and the hedge operation mode, a three-machine equivalent system is established to study edge to edge (ETE) oscillation mode under hedge operating mode of the power system. The influence of magnitudes and trends of power flow on damping ratio is analyzed, and the reason that why damping ratios decreases when both sides send power to the mid-side power grid is explained.


Sign in / Sign up

Export Citation Format

Share Document