The article assesses the current state and problems of the power supply system, highlights the most pressing problems in the public utilities sector in the Arctic zone of the Republic of Sakha (Yakutia). On the basis of statistical processing of information by subdivisions of JSC Sakhaenergo, the authors present an analysis of the structure of generating capacities and the dynamics of the installed capacity of power plants, including those based on renewable energy sources. Diesel power plants account for the largest share of the installed capacity, with renewable energy sources accounting for less than 1.4%. The main problem in power generation is equipment wear. In total, in the Arctic uluses of the republic in the communal and household sector, the standard resource for operating time since the start of operation exceeded more than 30% of the total number and 20% of the total installed capacity of diesel units, of which 60% are operating after major repairs. The authors outline main problems of fuel supply for the considered Arctic uluses: harsh climatic conditions, difficult transport accessibility, unstable hydrological situation, insufficient amount of dredging work, and a shortage of special road equipment. The assessment of the wear of power transmission lines and transformer substations is carried out. Of the total length of overhead power lines, 18.5% exceed the service life limit. For cable lines, this figure is 50.6%. In five uluses, more than half of the installed capacity of transformers exceeds the standard resource. Assessment of the electricity losses level shows that, on average, they amount to 15% for district power grids. In a number of Arctic uluses, there are high energy losses in power grids as well as their constant growth. When replacing and reconstructing outdated infrastructure, it is advisable to implement measures aimed at reducing losses and increasing the capacity of lines.

2013 ◽  
Vol 4 (2) ◽  
Author(s):  
Aleksandra Kanevče ◽  
Igor Tomovski ◽  
Ljubčo Kocarev

In this paper we analyze the impact of the renewable energy sources on the overall electric power system of the Republic of Macedonia. Specifically, the effect of the photovoltaic power plants is examined. For this purpose we developed an electricity production optimization model, based on standard network flow model. The renewable energy sources are included in the model of Macedonia based on hourly meteorological data. Electricity producers that exist in 2012 are included in the base scenario. Two more characteristic years are analyzed, i.e. 2015 and 2020. The electricity producers planned to be constructed in these two years (which include the renewable energy sources) are also included. The results show that the renewable energy sources introduce imbalance in the system when the minimum electricity production is higher than the electricity required by the consumers. But, in these critical situations the production from photovoltaic energy sources is zero, which means that they produce electricity during the peak load, and do not produce when the consumption is at minimum.


2018 ◽  
Vol 7 (3.5) ◽  
pp. 4
Author(s):  
Valeri Telegin ◽  
Nikolai Titov ◽  
Anatoli Stepanov

Power supply systems for small businesses based on renewable energy sources are most often based on converting wind energy, solar energy and water energy. Calculating its effectiveness is a time-consuming task, requiring the processing of a large amount of data specific for the geographical location of power generating units. In the article the technique of computer modeling of work of a park of wind power plants (WPP) with the purpose of definition of an optimum parity of their parameters is considered.   


2019 ◽  
Vol 124 ◽  
pp. 01040 ◽  
Author(s):  
D. T. Nguen ◽  
D. N. Pham ◽  
G. R. Mingaleeva ◽  
O. V. Afanaseva ◽  
P. Zunino

The growing demand for energy and fossil fuels creates increased number of difficulties, while renewable energy sources are still rarely used worldwide, particularly in Vietnam. In this article hybrid thermal power plants based on gas turbine plants are discussed, the increased efficiency of which is achieved by air heating after the compressor in solar air heaters. The basic design equations and the results of evaluating the efficiency and fuel consumption are presented for two thermal power plants of 4.6 MW and 11.8 MW. The dependence of the results on the intensity of solar extraction for the climatic conditions of the Ninh Thuan province of the Republic of Vietnam is discussed.


Author(s):  
Mykhailo Syvenko ◽  
Oleksandr Miroshnyk

A detailed substantiation of the use of electric energy storage devices in the presence of generators on renewable energy sources in the power supply system is given. The dependence of the storage parameters on the composition and priority of generation in the system is investigated. The solution of the problem of determining the parameters of electricity storage devices by means of purposeful simulation of generation parameters is considered. The results of the choice of power and capacity of the energy storage using technical and economic indicators are shown. Optimal parameters of electric energy storage devices as one of the most important means of ensuring the activity of isolated power supply systems together with selection of generating devices are determined. The results of calculations of capacity of renewable energy sources in isolated power supply systems in combination with classical energy sources are given. The necessity of using the principle of activity of the distribution electric network and the possibility of its realization is demonstrated. The optimal storage capacity as a function of the share of renewable generation, the non-integrated energy produced by renewable sources and the total storage capacity are plotted for several isolated systems. The main points of the used model of the power supply system of isolated networks are given. In the studied isolated power supply systems, wind power plants and solar power plants, which have significant unpredictability of generation, are used as generation based on renewable energy sources. The problem of undersupply of electricity to the grid by stepwise increase of generation is analysed. The results of the multi-step selection of power and energy consumption of electricity storage are determined by technical criteria.


2021 ◽  
Vol 288 ◽  
pp. 01003
Author(s):  
Saken Koyshybaevich Sheryazov ◽  
Sultanbek Sansyzbaevich Issenov ◽  
Ruslan Maratbekovich Iskakov ◽  
Argyn Bauyrzhanuly Kaidar

The paper describes special aspects of using the wind power plants (wind turbines) in the power grid. The paper provides the classification and schematic presentation of AC wind turbines, analyzes the role, place and performance of wind power plants in Smart Grid systems with a large share of renewable energy sources. The authors also reviews a detailed analysis of existing AC wind turbines in this paper. Recommendations are given for how to enhance the wind power plants in smart grids in terms of reliability, and introduce the hardware used in the generation, conversion and interface systems into the existing power grid. After the wind power plants had been put online, the relevance of the Smart Grid concept for existing power grids was obvious. The execution of such projects is assumed to be financially costly, requires careful study, and development of flexible algorithms, but in some cases this may be the only approach. The analysis of using wind turbines shows that the structural configuration of wind power plants can be based on the principles known in the power engineering. The approaches may differ, not fundamentally, but in engineering considerations. it is necessary to point out that the method of controlling dual-power machines is quite comprehensive so that their wide use will face operational problems caused by the lack of highly professional specialists in electric drives. Therefore, it seems advisable to use square-cage asynchronous generators in wide applications. The paper shows that as the renewable energy sources are largely used in power grids, there is an issue of maintaining the power generation at a required level considering the variability of incoming wind energy. This results in the malfunctions in the operation of relay protection devices and emergency control automatics (RP and ECA), and the complicated control. Also, the standards of the CIS countries and regulatory documents miss the requirements for the wind turbine protections, taking into account their specialty causing the inefficient standard protective logic, which does not work correctly in a number of abnormal and emergency operating modes, and especially Smart Grid in power grids.


2021 ◽  
Vol 289 ◽  
pp. 05002
Author(s):  
О.S. Kuznetsova ◽  
V.V. Khanaev

Due to the ever-increasing volume of energy consumption, the number of power plants capable of generating the necessary amount of electrical energy inevitably increases. The development and construction of new renewable energy sources and distribution generation facilities, the increase in electricity consumption and the growth of the tariff stimulates the search for effective technological solutions. Also in connection with the increasing popularity and improvement of technologies, there is a natural need to assess the prospects and potential opportunities of SES in the region as a whole, and for the Irkutsk region and the Republic of Buryatia, in particular.


2021 ◽  
Vol 5 (47) ◽  
pp. 4-4
Author(s):  
Alexander Saakian ◽  
◽  

In the conditions of regions with relatively low solar and wind potentials, interruptions in power supply to consumers powered by micro-power plants based on renewable energy sources may be due to a decrease in the power of wind power plants, photovoltaic modules with insufficient wind speed and insolation, respectively, to provide power to consumers. A study of the reliability of a system including a wind power plant, photovoltaic modules, a hybrid charge controller, an energy storage device and an inverter was carried out using a logical-probabilistic method. As part of the study, an analysis was made of the structure of the power supply system and its modes of operation in the event of various events: failure of system elements, replacement of failed elements, diagnostics of elements, decrease in the power of the wind power plant and photovoltaic modules. Combinations of events leading to a power failure of consumers connected to a hybrid micro-power plant have been determined. A fault tree was built for the hybrid micro-power plant. Expressions are obtained for calculating the probability of short-term, long-term power supply interruptions, the probability of power supply interruptions occurring when off-design insolation and wind speed occur. Mathematical modeling of the reliability of the hybrid micro-power plant for the conditions of the central part of the Republic of Mari El has been carried out. It has been determined that the probability of a system failure is determined mainly by the probability of long power outages. In this case, the reliability indicators of the system as a whole are largely determined by the values of the reliability indicators of the hybrid controller and inverter. Keywords: YBRID MICRO-POWER PLANT, RENEWABLE ENERGY SOURCES, RELIABILITY, RURAL POWER SUPPLY


2018 ◽  
Vol 7 (3.5) ◽  
pp. 48
Author(s):  
Valeri Telegin ◽  
Anatoli Stepanov

Power supply systems for small businesses based on renewable energy sources are most often based on converting wind energy, solar energy and water energy. Calculating its effectiveness is a time-consuming task, requiring the processing of a large amount of data specific for the geographical location of power generating units. In the article the technique of computer modeling of work of a park of wind power plants (WPP) with the purpose of definition of an optimum parity of their parameters is considered.  


2021 ◽  
Vol 11 (2) ◽  
pp. 152-163
Author(s):  
N.S. Batugina ◽  
◽  
V.L. Gavrilov ◽  
E.A. Khoiutanov ◽  
K.S. Popova ◽  
...  

The article considers various options for providing gold mining enterprises in the Arctic zone of the Republic of Sakha (Yakutia) with fuel and energy resources to generate electricity for industrial needs. The authors assess the possibility of organizing the power supply for the operation of the mines using the resources of local coal deposits. The Soginsky brown coal and Krasnorechensk coal deposits are most suitable for mining. The research proves that the use of coal in generation can reduce the cost of power supply in the development of ore and placer deposits. They determined that the lowest unit cost of electricity generation is achieved when brown coal from the Kularski deposit is used as fuel (9.3 rub/kW·h). The use of coals from the Soginsky deposit is 20% more expensive than the Kularsky coals, but the quality characteristics of the coal and the readiness of the deposit for mining are significantly better. The most accessible, but more expensive option for organizing the supply of coal to gold deposits is the use of imported coal of the required quality. The authors outline the necessity of additional appraisal of coal resource potential of the Arctic zone of Yakutia on the base of contemporary economic criteria. There is a need to clarify the extent of coal production and to determine the importance of coal in investment projects in the northeast of Arctic zone of Yakutia.