scholarly journals Early Contractor Involvement (ECI) in Event Planning and Management

10.29007/35b9 ◽  
2018 ◽  
Author(s):  
Chloe Penn ◽  
Ken Farnes ◽  
Farshid Rahmani

Large and mega-events employ traditional procurement approaches, adopting an adversarial stance with contractors/suppliers. These events are often beset with problems with the contractors/suppliers. This study investigates whether early contractor involvement (ECI) is being applied to the procurement processes within the event planning and management industry and to explore the potential benefits and challenges of the application of ECI within that industry. ECI attempts to exploit the contractor/supplier's specialist knowledge and expertise to the benefit the project planning and design process to provide mutual benefits and minimise the drawbacks associated with an adversarial contract. This paper argues that an event is a particular type of project and discusses the potential benefits of ECI to the event planning and management industry. A literature review approach was used to explore the construction and infrastructure industries and the event planning and management industry to determine whether ECI is being utilized to any meaningful degree. Overall the study findings indicate that by adopting ECI the event planning and management industry could expect similar benefits to those observed in the construction and infrastructure industries.

Prostor ◽  
2021 ◽  
Vol 29 (2 (62)) ◽  
pp. 154-173
Author(s):  
Mara Marić ◽  
Franko Ćorić ◽  
Mladen Obad Šćitaroci ◽  
Marin Duić

This research deals with projects for a residence on the island of Lokrum by Archduke Maximilian I of Habsburg (1832-1867). In the short period of owning the island (1859-1867), Maximilian ordered three different designs for Lokrum. The subject of research in this paper is the first phase of the project, dating from 1860 to 1866, when the general plan of the island, Maximilian’s residence, farm building and court chapel were designed. The research is based on an analysis of primary archival sources while the contemporary models for the project have been found through literature review. Twenty archival drafts have been described textually and graphically published. Maximilian actively participated in the planning and design process, but the author of the projects was Thomas Friedrich. After the general plan of the island from 1860 came sixteen preserved plans of Maximilian’s residence, which are with this research dated to the period from 1862 to 1864. The drafts for the farm building, court chapel and altar date back to the period from 1864 to 1866. Although in terms of architecture it was only partially built (only the landscape part of the project was executed), the Lokrum project from 1860 to 1866 shows Maximilian’s original idea of the island before the later grandiose plans of transformation into an imperial residence.


2018 ◽  
Vol 33 (4) ◽  
pp. 451-465 ◽  
Author(s):  
Eric Dumbaugh ◽  
Michael King

Planners and urban designers have long sought to encourage the creation of livable streets. Despite these professions’ best efforts, the creation of such streets has proven difficult to implement due to the design practices employed by traffic engineers. This article details how engineering practices modify the design of urban streets and provides a thematic review of recent innovations to engineering guidance. It concludes by presenting four general strategies for ensuring that walkable streets emerge from the engineering phases of the project planning and design process.


TERRITORIO ◽  
2016 ◽  
pp. 68-72 ◽  
Author(s):  
Antonella Bruzzese ◽  
Stefano Di Vita

2021 ◽  
Vol 18 (4) ◽  
pp. 857-871
Author(s):  
Elio Matteo Curcio ◽  
Giuseppe Carbone

AbstractThis paper addresses the design of a novel bionic robotic device for upper limb rehabilitation tasks at home. The main goal of the design process has been to obtain a rehabilitation device, which can be easily portable and can be managed remotely by a professional therapist. This allows to treat people also in regions that are not easily reachable with a significant cost reduction. Other potential benefits can be envisaged, for instance, in the possibility to keep social distancing while allowing rehabilitation treatments even during a pandemic spread. Specific attention has been devoted to design the main mechatronic components by developing specific kinematics and dynamics models. The design process includes the implementation of a specific control hardware and software. Preliminary experimental tests are reported to show the effectiveness and feasibility of the proposed design solution.


2021 ◽  
Vol 13 (11) ◽  
pp. 5982
Author(s):  
Carlos-Alberto Domínguez-Báez ◽  
Ricardo Mendoza-González ◽  
Huizilopoztli Luna-García ◽  
Mario Alberto Rodríguez-Díaz ◽  
Francisco Javier Luna-Rosas ◽  
...  

The objective of this paper was to propose a methodological process for the design of frameworks oriented to infotainment user interfaces. Four stages comprise the proposed process, conceptualization, structuring, documentation, and evaluation; in addition, these stages include activities, tasks, and deliverables to guide a work team during the design of a framework. To determine the stages and their components, an analysis of 42 papers was carried out through a systematic literature review in search of similarities during the design process of frameworks related to user interfaces. The evaluation method by a panel of experts was used to determine the validity of the proposal; the conceptual proposal was provided to a panel of 10 experts for their analysis and later a questionnaire in the form of a Likert scale was used to collect the information on the validation of the proposal. The results of the evaluation indicated that the methodological process is valid to meet the objective of designing a framework oriented to infotainment user interfaces.


2018 ◽  
Vol 15 (3) ◽  
pp. 265-287 ◽  
Author(s):  
Bhavana Mathur ◽  
Sumit Gupta ◽  
Makhan Lal Meena ◽  
G.S. Dangayach

PurposeThe purpose of this paper is to examine the causal linkages among supply chain practices, effectiveness of supply chain performance (SCP) and organizational performance (OP) in Indian healthcare industries.Design/methodology/approachThis paper is helpful in developing a framework for linking a healthcare supply chain practice to its OP, and thus identifies how such a linkage can be connected to the effectiveness of SCP. Such effort also enables the authors to derive a set of recommended supply chain practices for SC performance.FindingsFrom the literature review, this paper finds that, in the context of Indian healthcare industries, efficient SC performance may play a critical role for overall OP improvement, as there is a close interrelationship between supply chain management (SCM) practices and SCP that may have a more significant effect on OP improvement.Research limitations/implicationsThe principle limitation of the paper is that it is performed only in a particular industry and with a questionnaire survey which could be extended in future for other industries also. Another limitation of the paper is that it is focused only on the SCP of medical device and equipment supply chain which is a small portion of the whole healthcare supply chain, and therefore requires further research covering various other domains of healthcare supply chain. Another limitation of the study is that the sample survey has been taken from only one respondent per company at one point of time which may create biasness in the results. Thus, future research should collect data through multiple members from the organization.Practical implicationsThis study contributes to know the effect of SCM practices on healthcare SCP and provides a practical and useful tool to evaluate the extent of effectiveness of SCP and finally their impact on the healthcare OP. Finally, this study provides conceptual and descriptive literature regarding SCM practices that leads to improvement in healthcare performance.Social implicationsThis study adds to the knowledge on healthcare SCM performance by exploring the relationship between supply chain practices, healthcare SCP and healthcare OP and by developing and testing a research framework thus help in improving patient satisfaction.Originality/valueThis study attempts to show how the potential benefits of supply chain practices can no longer be ignored in healthcare supply chain.


2018 ◽  
Vol 16 (1) ◽  
pp. 25-43 ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Nermeen Mohamed Amin Abdelwahab

Purpose The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects. Design/methodology/approach A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities. Findings ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP. Research limitations/implications This paper focused only on the integration of RM into ADP. Originality/value The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Fatma Othman Alamoudy

Purpose This paper aims to develop a framework for optimising building performance through the integration between risk management (RM) and building information modelling (BIM) during the design process. Design/methodology/approach To achieve this aim, a research strategy consisting of literature review, case studies and survey questionnaire is designed to accomplish four objectives. First, to examine the concepts of design process, building performance, RM and BIM; second, to present three case studies to explain the role of using RM and BIM capabilities towards optimising building performance; third, to investigate the perception and application of architectural design firms in Egypt towards the role of RM and BIM for enhancing building performance during the design process; and finally, to develop a framework integrating RM and BIM during the design process as an approach for optimising building performance. Findings Through literature review, the research identified 18 risks that hamper optimising building performance during the design process. In addition, 11 building performance values and 20 BIM technologies were defined. Results of data analysis showed that “Design budget overrun”, “Lack of considering life cycle cost” and “Inefficient use of the design time” were ranked the highest risks that affect the optimisation of building performance. Respondents ranked “Risk avoid” or “Risk transfer” as the most risk responses adopted in the Egyptian context. In addition, “BIM As Built” was ranked the highest BIM technology used for overcoming risks during the design process. These findings necessitated taking action towards developing a framework to optimising building performance. Originality/value The research identified the risks that affect optimising building performance during the design process. It focuses on improving the design process through using the capabilities of BIM technologies towards overcoming these risks during the design process. The proposed framework which integrates RM and BIM represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2019 ◽  
Vol 10 (1) ◽  
pp. 48-62 ◽  
Author(s):  
John Lauermann

This article reviews recent scholarship on the urban politics of mega-events. Mega-events have long been promoted as drivers of urban development, based on their potential to generate beneficial legacies for host cities. Yet the mega-event industry is increasingly struggling to find cities willing to host. Political arguments that promote mega-events to host cities include narratives about mega-event legacy—the potential for events to generate long-term benefits—and mega-event leveraging—the idea that cities can strategically link event planning to other policy agendas. In contrast, the apparent decline in interest among potential host cities stems from two political shifts: skepticism toward the promises made by boosters, and the emergence of new kinds of protest movements. The article analyzes an example of largely successful opposition to mega-events, and evaluates parallels between the politics of mega-events and those of other urban megaprojects.