Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects

Author(s):  
Peter E. D. Love
Author(s):  
Azeanita Suratkon ◽  
◽  
Riduan Yunus ◽  
Rafikullah Deraman ◽  
◽  
...  

Design-Bid-Build (DBB) or commonly known as Traditional method is the earliest and most prevalent procurement method used in Malaysian construction industry. Design-Build (DB) and Construction Management (CM) procurement methods were later introduced in Malaysia as an endeavour to satisfy and accommodate the increase in project complexity and the need for avoiding drawbacks of the Traditional methods. Each procurement method has different nature and possesses certain characteristics. Therefore, this study was carried out to ascertain and compare the characteristics of these three procurement methods that are implemented in building construction projects in Malaysia. A questionnaire survey was conducted among architects, consultants, contractors and owners or developers to elicit their feedback on the characteristics which were categorised into time, cost, quality, complexity and flexibility, degree of involvement and responsibility allocation and technical expertise. The findings indicated that only DB method almost fulfils all the characteristics under the six categories, whereas, DBB methods garnered agreement only for certain characteristics under time, cost, complexity and flexibility and technical expertise categories. Meanwhile, the only CM method’s characteristics that satisfy agreement from the respondents are the often used of fast track approach and lack of certainty in price. This study concludes that when a procurement method is adopted for a construction project, not all the features or characteristics will turn out as expected. There are many factors that contribute and are influential on the success in procurement methods that are worth for further investigation.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


1999 ◽  
Vol 17 (4) ◽  
pp. 519-527 ◽  
Author(s):  
AVIAD SHAPIRA ◽  
CLIFFORD J. SCHEXNAYDER

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Wesam Salah Alaloul ◽  
Khalid M. Alzubi ◽  
Ahmad B. Malkawi ◽  
Marsail Al Salaheen ◽  
Muhammad Ali Musarat

PurposeThe unique nature of the construction sector makes it fall behind other sectors in terms of productivity. Monitoring construction productivity is crucial for the construction project's success. Current practices for construction productivity monitoring are time-consuming, manned and error prone. Although previous studies have been implemented toward reducing these limitations, a gap still exists in the automated monitoring of construction productivity.Design/methodology/approachThis study aims to investigate and assess the different techniques used for monitoring productivity in building construction projects. Therefore, a mixed review methodology (bibliometric analysis and systematic review) was adopted. All the related publications were collected from different databases, which were further screened to get the most relevant based on the Preferred Reporting Items for Systematic Review and Meta-Analyses (PRISMA) criteria.FindingsA detailed review was performed, and it was found that traditional methods, computer vision-based and photogrammetry are the most adopted data acquisition for productivity monitoring of building projects, respectively. Machine learning algorithms (ANN, SVM) and BIM were integrated with monitoring tools and technologies to enhance the automated monitoring performance in construction productivity. Also, it was observed that current studies did not cover all the complex construction job sites and they were applied based on a small sample of construction workers and machines separately.Originality/valueThis review paper contributes to the literature on construction management by providing insight into different productivity monitoring techniques.


2018 ◽  
Vol 2018 ◽  
pp. 1-5 ◽  
Author(s):  
Shaoli Wang ◽  
Yasir Mursalin ◽  
Gang Lin ◽  
Conghua Lin

This paper considers the problem of predicting a supply chain cost for prefabricated building construction under an uncertain situation. Based on the Activity-Based Costing (ABC) method, we establish a computational model to estimate the total cost of the prefabricated supply chain. The model can assist in not only finding the critical areas for cost reduction of the whole supply chain but also analyzing other costs of prefabricated construction projects. Furthermore, we provide a numerical example of prefabricated building construction to validate the results.


2020 ◽  
Author(s):  
Yilmaz Hatipkarasulu ◽  
Harrison Pierce ◽  
Suat Gunhan ◽  
Rui Liu

2020 ◽  
Vol 3 (4) ◽  
pp. 1349
Author(s):  
Hendy Eka Putra ◽  
Hendrik Sulistio

The implementation of the construction project caused miscommunication, this made the contract became a reference during implementation. In the implementation of construction projects, there are often changes that not according to contract, for example: work volume changes, specifications changes, type or method of work changes, schedules changes , design changes, and others. These changes are commonly known as change orders. There are several things that cause a change order, for example: incompletable contract, design does not fit in the field, unsupportive weather, and others. This research is to determine the effect of change order in the aspects of cost, quality, and time in multi-storey building construction projects. Researchers used data from the responses of respondents consisting of contractors, consultants, and owners. The questionnaire made proposes several aspects of change orders and their effects on cost, quality, and time. Analysis of research data was carried out with the help of the SmartPLS 3.0 application program. The influence of change orders on costs is the lack of costs due to the addition of work items, while on quality is the quality decrease due to additional work volume, and on time is the delay in project completion due to changes in completed work.ABSTRAKPelaksanaan proyek konstruksi menyebabkan terjadi perbedaan pendapat yang disebabkan oleh pihak yang terlibat, hal ini membuat kontrak menjadi sangat penting dan menjadi acuan selama pelaksanaan. Pada pelaksanaan proyek konstruksi sering terjadi perubahan-perubahan yang akhirnya tidak sesuai dengan kontrak sebelumnya contohnya seperti: perubahan volume pekerjaan, perubahan spesifikasi, perubahan jenis atau metode pekerjaan, perubahan jadwal, perubahan design, dan lain-lain. Perubahan ini umum sekali terjadi dalam proyek konstruksi dan lebih sering dikenal sebagai change order.  Ada beberapa hal yang menyebabkan perlunya dilakukan change order, misalnya: kontrak yang dibuat tidak lengkap, design yang ada tidak sesuai dengan kondisi lapangan, cuaca yang tidak mendukung, dan lain-lain. Penelitian ini dilakukan untuk mengetahui besar pengaruh change order dalam aspek biaya, mutu, dan waktu dalam proyek konstruksi gedung bertingkat. Peneliti menggunakan data dari hasil tanggapan responden yang terdiri dari kontraktor, konsultan, dan pemilik. Kuesioner yang dibuat mengajukan beberapa aspek mengenai change order serta pengaruhnya terhadap biaya, mutu, dan waktu. Analisis data penelitian dilakukan dengan bantuan program aplikasi SmartPLS 3.0. Pengaruh change order terhadap biaya adalah kurangnya biaya akibat penambahan item pekerjaan, sedangkan terhadap mutu adalah menurunnya kualitas bangunan akibat penambahan volume pekerjaan, dan terhadap waktu adalah terjadinya keterlambatan penyelesaian proyek akibat perubahan pekerjaan yang telah selesai.


2021 ◽  
Vol 236 ◽  
pp. 05002
Author(s):  
Longbo Zhang ◽  
Hao Liu

BIM technology can participate in the entire process of building construction projects, using a three-dimensional way to restore all links involved in the process of building production. This intuitive and clear presentation method helps architects correct and quickly repair existing loopholes in a timely manner, ensure the smooth development of construction projects, improve efficiency and reduce losses due to project delays.


2021 ◽  
Vol 39 (4) ◽  
pp. 1029-1034
Author(s):  
A. Nazif ◽  
A.K. Mustapha ◽  
F. Sani

Estimating of cost for building construction projects with minimum error at the conceptual stage of project development is quite  essential for planning. This study seeks to evaluate factors responsible for cost escalation of building construction projects.  Questionnaires were administered to examine and assess these factors. Subsequently, the mean score value of each factor was determined. In addition, Correlation and Linear regression analyses were used to establish the relationship between these factors. Factors responsible for cost escalation in projects were examined as well as the impact of those factors, and occurrence of those factors on project cost. The result of the analysis showed that, the most agreed factors responsible for project cost escalation were; inadequate supervision, irregular payment, and design error, having high mean values of 4.25, 4.20, and 4.15, respectively. Also, correlation analysis result established that the factors responsible for cost escalation and the impact of cost escalation had significant R and R2 of 0.81 and 0.70 respectively. Addressing these factors would go a long way in reducing the escalation of building project cost. Never the less, an effective cost management strategy is absolutely necessary to safeguard and sustain the construction  industry. Keywords: cost escalation, building project, construction, regression analysis