scholarly journals Risk management method for construction projects using a value-based approach

2020 ◽  
Vol VIII(232) (40) ◽  
pp. 36-40
Author(s):  
Seek Ali Mohamed Abdulsalam
2021 ◽  
Vol 7 (1) ◽  
pp. 69-79
Author(s):  
Muhammad Huzaifa Butt ◽  
Shahid Iqbal ◽  
Muhammad Abubakar Saddique ◽  
Hamza Shahid

In Project Management field “Risk management” has been known as the best and most imperative exercise for the accomplishment of virtuous enactments of the construction projects in Pakistan. Achievement of requisite objectives in construction projects as enumerated by getting its recital in relationships of Project Quality, Project Cost and Project Time in protection of sustainability areas. Construction development improvements in Pakistan, by and large in the territory and the world have a high risk/danger of being definitively late and over financial plan. Whereas a bit of schedule and cost related risks are inevitable in any construction project around the whole world, it is likely to improve risk management plans to diminish their undesirable effect and make the most of positive influence. This research/investigation indorses a very good and systematized risk management method throughout planning stage of the project and with the contribution of construction specialists, end users and engineers.


Author(s):  
L. Van Meerbeek ◽  
L. Barazzetti ◽  
R. Valente

Today, the field of cultural heritage faces many challenges: cultural heritage is always at risk, the large amount of heritage information is often fragmented, climate change impacts cultural heritage and heritage recording can be time-consuming and often results in low accuracy. Four objectives, related to the challenges, were defined during this research work. It proposes a relevant value-led risk management method for cultural heritage, it identifies climate change impact on cultural heritage, it suggests a database lay-out for cultural heritage and demonstrates the potential of remote sensing tools for cultural heritage. The Via Iulia Augusta, a former Roman road in Albenga, was used as case study.


2018 ◽  
Vol 16 (1) ◽  
pp. 25-43 ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Nermeen Mohamed Amin Abdelwahab

Purpose The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects. Design/methodology/approach A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities. Findings ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP. Research limitations/implications This paper focused only on the integration of RM into ADP. Originality/value The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2021 ◽  
Vol 13 (4) ◽  
pp. 2034
Author(s):  
Chien-Liang Lin ◽  
Bey-Kun Chen

Risks inevitably exist in all stages of a project. In a construction project, which is highly dynamic and complex, risk factors affect the expected achievement rates of the three main performance goals, namely schedule, cost, and quality. A comprehensive risk management procedure requires three crucial steps: risk confirmation, analysis, and treatment. Risk analysis is the core of risk management. Through structural equation modeling, this study developed a risk analysis model that takes a different perspective and considered the occurrence probability of risk events and the extent to which these events affect a project. The contractor dimension was discovered to exert the strongest influence on an overall project, followed by the subcontractor and design dimensions. This paper proposes a novel construction project risk analysis model, which considers the entire project. The proposed model can be used as a reference for risk managers to make decisions about project risks, so as to achieve the ultimate goal of saving resources and the sustainable operation of the construction project.


Author(s):  
Alfredo Federico Serpell ◽  
Ximena Ferrada ◽  
Larissa Rubio

Abstract The function of project risk management (PRM) is to understand the uncertainty that surrounds a project and to identify the potential threats than can affect it as well as to know how to handle these risks in an appropriate way. Then, the measurement of the performance of PRM becomes an important concern, an issue that has not yet been addressed in the research literature. It is necessary to know how successful the application of the PRM process is and how capable is the process within the organization. Regarding construction projects, it is essential to know whether the selected responses to mitigate or eliminate identified risks were suitable and well implemented after the execution of the project. This paper presents a critical analysis of the relevance of measuring the performance of PRM and the benefits of doing so. Additionally, it presents a preliminary and pioneering methodology to measure the performance of PRM through the evaluation of the adequacy of responses applied to mitigate risks as well as to evaluate the resulting impacts as indicators of the effectiveness of these actions at the end of the project. This knowledge will allow construction companies to incorporate good practices, generate lessons learned, and thereby to promote a continuous improvement of the whole PRM process.


2020 ◽  
Vol 25 (2) ◽  
pp. 93-127
Author(s):  
Berenger Yembi Renault ◽  
Justus Ngala Agumba ◽  
Nazeem Ansary

The quest for delivering successful construction projects has urged South African small and medium enterprises (SMEs) to adopt risk management in their projects. However, it has been evinced that SMEs projects in South Africa especially in the Gauteng province have encountered poor performances. Thus, this article determines core risk management factors influencing project outcome of SMEs. A deductive approach was embraced using a questionnaire. The data were collected from 181 conveniently sampled respondents in Gauteng, graded from Grade 1 to 6 of the CIDB (Construction Industry Development Board) grading system. The Statistical Package for the Social Science (SPSS) version 23 was used to analyse the data by computing exploratory factor analysis and multiple regression analysis. It was revealed that SMEs performance outcome is influenced by eight risk management factors. The influential factors are organisational environment, defining project objectives, resource requirements, risk measurement, risk identification, risk assessment, risk response and action planning and monitoring, review and continuous improvement. The risk management factors established in this article are reliable and valid in projects undertaken by SMEs in the South African construction industry and the findings can serve as a guideline for contractors to achieve success in this context. The study may be repeated in other countries globally, however, it cannot be generalised due to the restrictions pertaining to the geographical area.


2021 ◽  
Vol 14 (2) ◽  
pp. 91-101
Author(s):  
Noor Aletby ◽  
Hafeth Ibrahim

Construction projects in Iraq face many dangers that cause exceeding the estimated cost of the project and not completing the project on time, and since the risk management process in construction projects is of great importance in controlling and reducing the impact of risks in construction projects, so it is necessary to identify these risks and evaluate them correctly in order to increase accuracy and the health of the subsequent stages of the risk management process in construction projects. This paper aims to identify the most important risks in construction projects in Iraq and to conduct a qualitative assessment of the identified risks and arrange them according to their importance. The researcher adopted the questionnaire method as a tool to determine the risks and used the technique of probability and effect matrix to conduct the qualitative assessment of the identified risks. The study found that there are 48 risk factors that constitute the most dangerous factor in construction projects in Iraq, and 10 of the determining factors were within the high level of risk, and at the forefront of which was the inability of the owner to finance the project.