scholarly journals Impact of Construction Productivity Attributes Over Construction Project Performance in Indian Construction Projects

2019 ◽  
Vol 50 (1) ◽  
pp. 89-96 ◽  
Author(s):  
Saurav Dixit ◽  
Kinshuk Saurabh

Performance of a construction project could be influenced by a number of attributes, especially large and complex projects lay additional focus on the success / failure attributes, because of the intensive amount of money invested, a high degree of uncertainty, the complexity of personnel’s required, a multiplicity of goals and problems in coordination between different stakeholders encountered. In this research paper, the author intended to define and examine the relationship and impact of construction productivity (CP) over construction project performance (CPP). The author tests the proposition that there is a positive relationship/impact between both of them. And to test the effect of factors is affecting CP on CPP and to propose a conceptual model on the basis of the analysis. To validate the mathematical validity of factor analysis, Spearman correlation analysis has been performed on the factors. And to check the reliability of all the factors using reliability analysis, and finally test the hypothesis that construction productivity is having a positive impact on project performance using one sample t-test. The findings of the study concluded that there is a positive impact of construction productivity on project performance in Indian construction projects. This paper attempts to identify the relationship between CP and CPP and recommends the framework for the industry to grow sustainably and deliver projects successfully. This study is conducted using a structured questionnaire survey in India and to validate the results of the study similar kind of study is required to be conducted in the other regions of the country to have more reliable findings."This paper is the revised version of the paper that has been published in the proceedings of the Creative Construction Conference 2018: Dixit, S., Mandal, S. N., Thanikal, J. V, & Saurabh, K. (2018). Construction Productivity and Construction Project Performance in Indian Construction Projects, m(July), 379–386. https://doi.org/10.3311/CCC2018-050".

Complexity ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Qi Luo ◽  
Kun Lu

Expect for formal contracts, there are informally unwritten psychological contracts (PC) in the relationship between buyer and supplier for construction projects. The PC can affect the construction project performance and even cause project failure, but its process and formation are complex and not comprehensive in existing researches. This paper analyzes the PC between buyer and supplier by using evolutionary game and repeated game to tackle this gap. The results show the following: (1) the goodwill and interest have an important impact on PC fulfillment. (2) The PC is vulnerable; for example, once either one fails to perform PC, the other will also destroy PC, and then the construction project will enter a vicious circle. (3) In the process of repeated game, the effect of goodwill will gradually disappear, and the interest will play a major role. (4) If the project performance is only linked to one participant, it will lead to breach from another player. Some measures may help both sides to complete PC, such as making both sides profitable, increasing the emphasis on business reputation, and improving the relevance of construction projects performance.


2020 ◽  
Vol 31 (2) ◽  
pp. 197-210
Author(s):  
Tatjana Ivanovic ◽  
Sonja Ivancevic ◽  
Milica Maricic

Contemporary research on disorders in modern-day work environment marks burnout among employees in different professions as an important disorder with serious consequences. Practice has shown that recruiters are one of the professions frequently facing burnout. The relationship between burnout, work engagement and turnover intention has often been investigated in the literature. However, even though scholars are increasingly interested in these relationships in other professions, there is a growing need for studies evaluating the relationship between the three concepts among human resource (HR) professionals, particularly recruiters. Having this in mind, the aim of this study is to identify, understand and examine the relationship between burnout, engagement and turnover intention of recruiters in Serbia. The data was collected using an online questionnaire within a sample of 100 recruiters in Serbia. Copenhagen Burnout Inventory was used for measuring burnout, UWES-9 for measuring work engagement and TIS-6 for measuring turnover intention. Structural equation modelling (SEM) was used for evaluating the relationships between burnout, turnover intention and work engagement. The results of the research showed that work engagement has a negative impact on burnout and that burnout has a positive impact on turnover intention, while the relationship between work engagement and turnover intention was not confirmed. The correlation analysis confirmed all three examined relationships. The results largely support the findings from the literature for other professions confirming that employees who suffer from a high degree of burnout are more likely to have a turnover intention. Finally, the implications of these results and recommendations for organizations and recruiters themselves to prevent and decrease burnout are discussed. The findings of this study can make a contribution to the specific academic literature on burnout among recruiters and initiate further research on this topic of high interest.


2012 ◽  
Vol 18 (1) ◽  
pp. 133-144 ◽  
Author(s):  
Fu-Cih Siao ◽  
Yu-Cheng Lin

Many interfaces typically exist in the construction phase of a project. Since project participants usually fail to share interface information, most interfaces are difficult to solve effectively during that phase. Furthermore, future activities might not be implemented based on changes made by predecessors. In practice, failure to manage interfaces may result in additional work or in low project performance. In order to manage construction interfaces effectively, this study proposes the novel Multilevel Interface (MI) Matrix approach to enhance interface management during the construction phase of construction projects. By using the MI matrix approach, construction interface issues will be tracked and man-aged easily and effectively. Furthermore, this study develops a construction web matrix-based interface management (WMIM) system integrated with the proposed MI Matrix approach. The MI matrix approach and WMIM system are applied to a pilot test to illustrate how to support interface management during the construction project. As results of the pilot test indicate, the MI matrix approach and WMIM system provide an effective interface management tool for the construction phase. Santrauka Statybos projekto statybos darbų etapui būdinga tai, kad su įvairiais subjektais palaikoma gausybė ryšių. Daugumą jų šiame etape veiksmingai palaikyti dažniausiai ne itin lengva, nes projekto dalyviai paprastai informacija apie juos nesidalija. Be to, perimantys darbą gali ir nesiremti savo pirmtakų padarytais pakeitimais. Praktine prasme nesugebant valdyti ryšių, gali tekti darbus perdaryti arba projekto efektyvumas gali sumažėti. Efektyviam su statyba susijusių ryšių valdymui šiame darbe siūlomas novatoriškas įvairialygių ryšių (ĮR) matricos metodas, leidžiantis pagerinti ryšių valdymą statybos projekto statybos darbų etape. Taikant ĮR matricos metodą lengva veiksmingai sekti ir valdyti statybų ryšių klausimus. Be to, atliekant tyrimą sukuriama projekto dalyviams skirta internetinė matricinė statybų ryšių valdymo (WMIM) sistema, į kurią įtrauktas siūlomas ĮR matricos metodas. Taip pat, taikant ĮR matricos metodą ir WMIM sistemą, atliekamas bandymas, rodantis, kaip jie padeda valdyti statybos projekto ryšius. Bandymo rezultatai rodo, kad ĮR matricos metodas ir WMIM sistema – tai efektyvi ryšių valdymo priemonė statybos darbų etape.


2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


Companies try to use better techniques to deal with complex projects. The maturity of companies to apply these better techniques can guarantee project success or not. The environment, where the engineering and construction project is developed, also has influence over the success. The maturity of a company's project management processes is also a factor of success. This chapter aims to talk about concepts related to engineering and construction initiatives.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


2012 ◽  
Vol 468-471 ◽  
pp. 1435-1438
Author(s):  
Wei Ping Jiang ◽  
Qian Zhang ◽  
Yun Le ◽  
Jian Fang

There is in lack of trust in construction projects. It is criticized by many scholars. Trust has the function of decreasing transaction cost and improving project performance. The characteristics of the trustee have important function on occurrence of trust. More specifically, the trustee’s reputation, competence and promise keeping contribute to occurrence of trust.