scholarly journals Analisis Ketidakstabilan Tegangan dan Frekuensi Pada Pembangkit Listrik Tenaga Mikrohidro Soko Kembang

2019 ◽  
Vol 11 (2) ◽  
pp. 129-137
Author(s):  
Nurul Dyah Pratiwi ◽  
Isdiyato Isdiyato

Microhydro power plant (MPP) is a small-scale power plant that uses water energy. The process of energy change occurs in a device called a synchronous generator. when the synchronous generator is given an arbitrary load, then the voltage will change. These results cause voltage and frequency instability. This research was conducted to analyze the voltage and frequency instability in MPP. The research method used in this research is descriptive quantitative approach in the village of Soko Kembang, Petungkriyono District, Pekalongan Regency, Central Java. This study provides an overview and explanation of the problems regarding the voltage and frequency instability of Micro Hydro Power Plants. The results of this study are the highest and lowest voltage / frequency instability values, namely 235 volts / 51 Hz and 160 volts / 44 Hz, due to the influence of changes in load current, which can affect the rotational speed of the generator changes, resulting in unstable voltage and frequency generated by the generator, the rotational speed of the generator changes, resulting in unstable voltage and frequency generated by the generator. The solution is  add water power to rotate the shaft of the turbine and generator to be tighter, so that it can reduce the value of the decrease in electric power by losses to the turbine and generator. Large electric power can increase voltage and frequency without having to adjust the load, and the need for improvement of the ELC system in order to get a more effective value of voltage and frequency stability.  

2018 ◽  
Vol 73 ◽  
pp. 01017
Author(s):  
Ignatius Sriyana

Land degradation on the upstream of watershed will affect hydrology condition in a way that it will disrupt the sustainability of its existing micro hydro. The purpose of this study is to evaluate micro hydro power plant in central Java toward sustainability against hydrology condition of watershed. This study is using River Regime Coefficient (RRC) approach where hydrology of watershed with coefficient value less than 50 is classified as non-critical, between 50 and 120 is moderate and more than 120 is critical. Result of the study that was done on 33 micro hydro power plants scattered on 9 watersheds is showing that there are 2 power plants on 2 watersheds have hydrology condition in non-critical status (9.09%), 1 power plant on 1 watershed is in between critical and non-critical status (3.03%), 21 power plants on 3 watersheds are in between critical and moderate status (63.64%), 8 power plants on 6 watersheds are in critical status (21.21%) and 1 power plant on 1 watershed is in between moderate and critical status (3.03%).


2010 ◽  
Vol 90 (3) ◽  
pp. 189-206 ◽  
Author(s):  
Mila Pavlovic ◽  
Rajko Golic ◽  
Dejan Sabic

The territory of the municipality of Mali Zvornik is, from the aspect of morphology and spatial-functional structure, a heterogeneous area. It is located in the valley of the Drina River and in hilly-mountainous part of Podrinjske mountains. The area of the municipality is 184 km?, with 14076 inhabitants (2002). The importance of water resources for the development of the municipality, particularly of the hydropower plant (HPP) ?Zvornik?, is analyzed in this paper. Inadequate use of hydro-energetic potential, possibilities for construction of new hydropower plants and economic reasons for their construction are also emphasized. The priorities of the development of hydraulic engineering are defined in relation to morphological and hydrological conditions. They refer to increase of power of the HPP ?Zvornik? and construction of small-scale hydropower plants in hilly-mountainous part of municipality. Considering depopulation processes in the villages of Mali Zvornik, hydraulic engineering, together with agriculture, forestry, exploitation of mineral goods and tourism, can be one of the factors of demographic and economic revitalization of this area.


2018 ◽  
Vol 4 (1) ◽  
pp. 77-86
Author(s):  
Nuno Fonseca ◽  
André Madureira ◽  
João Peças Lopes ◽  
Manuel Matos

This work is within the scope of set of consultancy studies made for Portuguese islands. It focuses on the integration of Pumped Storage Power in isolated islands. The paper starts to address several power systems circumstances about two Portuguese islands on the energetic level. For each of these islands, an independent examination of the conditions to install a reversible hydro power plant is accomplished. Therefore, the energy volume to be stored due to excess of renewable generation and the ideal power and number of the pumps and turbines to be installed were identified and evaluated for the sake of using the produced energy surplus as to be pumped and later generated. The paper enhances the importance of storing energy in the operation of isolated and small systems with considerable amount of intermittent power resources as well as the conditions for the viability of installing new exploitations of this kind.


Author(s):  
Sudarman Sudarman ◽  
Wahyu Guszolil ◽  
Daryono Daryono ◽  
Muhammad Lukman

Micro Hydro Power (MHP) Plant is a small-scale power plant under 100 kW. Generally, MHP is built in a place that the electricity network has not touched. Many waterfalls in Taji Village are only used as tourist attractions. One of them is Coban Jahe waterfall which has a water discharge of 0.60567 m3/s in the dry season. Waterfall in Coban Jahe was used and planned as Micro Hydro Power Plant, it was called as MHP. Potential electric power generated from the MHP Coban Jahe Waterfall is 14.0368 kW with an effective head of 3.4742 m. The results show from the financial analysis, the construction of MHP is quite feasible with NPV of Rp. 45,676,769, BCR of 1.0852, which means it is feasible to be continued, the Payback Period is 9 years which does not exceed the project life, and the IRR obtained is 10,0087% which the projects are feasible and profitable to build.


2021 ◽  
Vol 5 (2) ◽  
pp. 201
Author(s):  
Muhammad Ikhsan ◽  
Nuzuli Fitriadi

This paper provides survey results of an electricity system that has been carried out from isolated village of Alue Keujrun, South Aceh, Indonesia. The village has a central photovoltaic power plant and a micro hydro power plant. Various problems in the field such as operation errors, lack of maintenance of the electric power system, low voltage and frequency have been found. Power plant operators have also never received any formal training from any institution. The village is located next to the Kluet river which has a very large potential to become a hydrokinetic power plant energy source. Therefore the Kluet river flow velocity was also measured during the survey and described within this paper. Based on the interviews results with local operators, the village power plant does not have an operating permit. Thus, we consider that it is important to review the types of permits required to establish a power plant in Indonesia, including small-scale power plants.


2018 ◽  
Vol 17 (3) ◽  
pp. 393
Author(s):  
I Putu Juliana ◽  
Antonius Ibi Weking ◽  
Lie Jasa

The dependence of power plants on energy sources such as diesel, natural gas and coal is almost 75%, encouraging the development of renewable energy in an effort to meet the electricity supply. One of them is the micro hydro power plant by utilizing the potential of existing water. The working principle of PLTMH is to change the potential energy of water into electrical energy. In this final project has been designed modeling of micro hydro power plant by using screw turbine (Archimedes Screw). The turbine used resembles a drill bit, with a diameter of a turbine of 26 cm, a screw width of 10 cm, and an amount of 10 pieces of blade. Measurements made on the modeling of micro hydro power plants include: water discharge, turbine rotation, generator rotation, voltage, current, torque and generator output power and efficiency. The parameters are measured by changing the water fall on the turbine from the position of the turbine head angle 00, 100, 150, 200, 250, 300, 350, 400, 450, 500, 550, 600, 700, 800  and 900 . The result of measurement that has been done on the parameters of micro hydro power plant modeling, obtained the highest measurement result at the corner of turbine head 400. The output power generated is 10.92 watts, torque is 0.60 Nm and efficiency of 14%. The results obtained are still low because the turbine rotation is less able to rotate the generator, where the generator torque is greater than the torque in the turbine. This is influenced by the small water discharges in the modeling of this micro hydro power plant.


Sign in / Sign up

Export Citation Format

Share Document