scholarly journals Macroinvertebrate Recovery to Varying Hydropeaking Frequency: A Small Hydropower Plant Experiment

2021 ◽  
Vol 8 ◽  
Author(s):  
Claire Kathryn Aksamit ◽  
Mauro Carolli ◽  
Davide Vanzo ◽  
Christine Weber ◽  
Martin Schmid

As the demand for hydroelectricity progresses worldwide, small hydropower operators are increasingly examining the feasibility of using existing infrastructure (e.g., settling basins) in run-of-the-river schemes for intermittent power production. Such flexible production causes short-term discharge fluctuations (hydropeaking) in downstream reaches with potential adverse effects for the sensitive fauna and flora in alpine streams. In an experimental field study on a previously unregulated section of the upper Rhone River (Switzerland), we measured density and composition of macroinvertebrate drift in two habitats (riffle, pool) following a 15-minute hydropeaking wave. The experimental hydropeaking was replicated five times over 14 days with decreasing recovery times between peaks (8, 3, 2 days, and 24 h), and drift measurements were compared with kick samples for the benthic community. Results from the kick sampling showed that benthic macroinvertebrate abundance and composition did not significantly change between the experimental peaks. There were habitat specific reactions in macroinvertebrate drift to hydropeaking, with the pool experiencing more pronounced drift abundances than the riffle. Overall, drift abundance was not significantly correlated with recovery time, but results indicate taxa-specific differences. This research advocates for the importance of completing more in-situ field experiments in order to better understand the ecological impact of flexible power production in small hydropower plants.

Processes ◽  
2021 ◽  
Vol 9 (2) ◽  
pp. 266
Author(s):  
Md Rakibuzzaman ◽  
Sang-Ho Suh ◽  
Hyoung-Ho Kim ◽  
Youngtae Ryu ◽  
Kyung Yup Kim

Discharge water from fish farms is a clean, renewable, and abundant energy source that has been used to obtain renewable energy via small hydropower plants. Small hydropower plants may be installed at offshore fish farms where suitable water is obtained throughout the year. It is necessary to meet the challenges of developing small hydropower systems, including sustainability and turbine efficiency. The main objective of this study was to investigate the possibility of constructing a small hydropower plant and develop 100 kW class propeller-type turbines in a fish farm with a permanent magnet synchronous generator (PMSG). The turbine was optimized using a computer simulation, and an experiment was conducted to obtain performance data. Simulation results were then validated with experimental results. Results revealed that streamlining the designed shape of the guide vane reduced the flow separation and improved the efficiency of the turbine. Optimizing the shape of the runner vane decreased the flow rate, reducing the water power and increasing the efficiency by about 5.57%. Also, results revealed that tubular or cross-flow turbines could be suitable for use in fish farm power plants, and the generator used should be waterproofed to avoid exposure to seawater.


Water ◽  
2021 ◽  
Vol 13 (8) ◽  
pp. 1041
Author(s):  
Francisco Javier Sanz-Ronda ◽  
Juan Francisco Fuentes-Pérez ◽  
Ana García-Vega ◽  
Francisco Javier Bravo-Córdoba

Fish need to move upstream and downstream through rivers to complete their life cycles. Despite the fact that fishways are the most commonly applied solution to recover longitudinal connectivity, they are not considered viable for downstream migration. Therefore, alternative facilities are recommended to facilitate downstream migration. However, a few recent studies have disagreed with this general assumption, showing the potential for bidirectional movements. This study advances our understanding of the potential of fishways for downstream migration by studying their efficiency in a run-of-the-river hydropower plant in the Duero River (Spain). To achieve this, downstream movements of the Iberian barbel (n = 299) were monitored in a stepped fishway for two years with passive integrated transponder (PIT)-tag technology, considering the effect of fish origin and release zone. The results showed that 24.9% of barbels descended through the fishway, with the origin and release zone affecting the fishway location. In addition, downstream movements were observed throughout the whole year, except in winter. The study concludes that, under specific scenarios, fishways could act as safe alternative routes for downstream migration.


2021 ◽  
Vol 8 (1) ◽  
Author(s):  
Alberto Scotti ◽  
Roberta Bottarin

AbstractThe present dataset contains information about aquatic macroinvertebrates and environmental variables collected before and after the implementation of a small “run-of-river” hydropower plant on the Saldur stream, a glacier-fed stream located in the Italian Central-Eastern Alps. Between 2015 and 2019, with two sampling events per year, we collected and identified 34,836 organisms in 6 sampling sites located within a 6 km stretch of the stream. Given the current boom of the hydropower sector worldwide, and the growing contribution of small hydropower plants to energy production, data here included may represent an important – and long advocated – baseline to assess the effects that these kinds of powerplants have on the riverine ecosystem. Moreover, since the Saldur stream is part of the International Long Term Ecological Research network, this dataset also constitutes part of the data gathered within this research programme. All samples are preserved at Eurac Research facilities.


Author(s):  
Sumer Chand Prasad

In this chapter the emerging control techniques for 25 MW small hydropower (SHP) plants which utilize fuzzy logic are compared with conventional PID control for the speed control of hydraulic turbine in terms of rise time, smoothness of response, settling time, and overshoot in wicket gate opening with the response to change in turbine speed. In the case of the PID controller, gain adjustment (tuning) is required. The fuzzy controller algorithm is based on intuition, experience, and it incorporates a simple, rule-based IF X AND Y THEN Z approach. These controllers obtained don't require gain adjustment. The work done is a small step towards the automation of the hydropower plants.


2022 ◽  
Vol 56 ◽  
pp. 155-162
Author(s):  
Korina-Konstantina Drakaki ◽  
Georgia-Konstantina Sakki ◽  
Ioannis Tsoukalas ◽  
Panagiotis Kossieris ◽  
Andreas Efstratiadis

Abstract. Motivated by the challenges induced by the so-called Target Model and the associated changes to the current structure of the energy market, we revisit the problem of day-ahead prediction of power production from Small Hydropower Plants (SHPPs) without storage capacity. Using as an example a typical run-of-river SHPP in Western Greece, we test alternative forecasting schemes (from regression-based to machine learning) that take advantage of different levels of information. In this respect, we investigate whether it is preferable to use as predictor the known energy production of previous days, or to predict the day-ahead inflows and next estimate the resulting energy production via simulation. Our analyses indicate that the second approach becomes clearly more advantageous when the expert's knowledge about the hydrological regime and the technical characteristics of the SHPP is incorporated within the model training procedure. Beyond these, we also focus on the predictive uncertainty that characterize such forecasts, with overarching objective to move beyond the standard, yet risky, point forecasting methods, providing a single expected value of power production. Finally, we discuss the use of the proposed forecasting procedure under uncertainty in the real-world electricity market.


Author(s):  
Burak Omer Saracoglu

<p>Turkey is a country that has had to deal with high electricity consumption due to its rapid growth and development. Attempts have been made to address this increase in demand by increasing the electricity supply by means such as boosting resources by privatization. The electricity generation sector has been privatized in Turkey; hence investors have been looking for the most appropriate electricity generation projects for a long while. Therefore, researchers and practitioners should focus on how the most suitable small hydropower plant project (SHPP) investments can be selected. In this study, the Analytic Hierarchy Process (AHP) was applied to make the most appropriate and satisfying decision according to the decision makers, experts or investors for a SHPP investment from amongst some alternative SHPP investments in Turkey. All of these SHPPs were assumed to be in the pre-development investment stage, which indicated that their pre-feasibility and feasibility studies had not been presented or taken into consideration until this study was performed. This main constraint forced the researchers to obtain the data and information from the information forms such as the application document to the General Directorate of State Hydraulic Works during the data and information gathering process. The AHP model of this study was structured in four levels with five main criteria, seventeen basic criteria and five alternatives on the Super Decisions Software. The results indicated that Alternative 1 and Alternative 5 should be primarily investigated in detail in subsequent SHPP investment investigation steps.</p>


Sign in / Sign up

Export Citation Format

Share Document