scholarly journals Geotechnical Property Modeling and Construction Safety Zoning Based on GIS and BIM Integration

2021 ◽  
Vol 11 (9) ◽  
pp. 4004
Author(s):  
Muhammad Shoaib Khan ◽  
Jaemin Park ◽  
Jongwon Seo

The increase in population and urbanization needs attention towards intense construction activities to meet the social and economic needs. Soil excavation is a primary step in every construction project that needs proper surface and subsurface information modeling since it is vulnerable to construction hazards. Geographic information system (GIS) provides significant information about the existing contextual surface information while building information modeling (BIM) gives information about the asset in a great detail that has been integrated into the construction industry for many applications. However, the integration of BIM and GIS for the subsurface geotechnical property modeling and classification into zones has been rarely explored. This paper presents the integration of BIM and GIS for modeling geotechnical properties and safe construction zones based on soil type. The use of open standard IFC classes such as IfcBorehole, IfcGeoslice, and IfcGeomodel enhances the collaboration and allows the exchange of geotechnical information among different stakeholders. The method has been applied to the in-situ and laboratory test dataset of the Peshawar, region, to validate the proof of concept. The results demonstrate that the proposed method successfully integrates BIM and GIS providing a three-dimensional surface and subsurface model. The 3D digital geotechnical model has excellent potential to provide information about soil type, properties, depth, and volume of each available soil layer that can be used by construction planners and managers to identify best construction practices and plan for safe construction.

2021 ◽  
Vol 2021 ◽  
pp. 1-15
Author(s):  
Jiaming Wu ◽  
Jian Chen ◽  
Guoliang Chen ◽  
Zhe Wu ◽  
Yu Zhong ◽  
...  

With the rapid development of infrastructure construction, geotechnical engineering has always been worthy of attention due to its complexity and diversity. Accelerating the informatization of geotechnical engineering will contribute to the project management, but the information contained in geotechnical engineering cannot be well integrated because of the lack of unified data standards. Building Information Modeling (BIM) has been considered as an effective technology to manage information, and Industry Foundation Classes (IFC) in BIM serves as a neutral and open standard for the exchange of information. However, it was found that BIM cannot express the information of some structure objects and geological objects well during the construction process of geotechnical engineering. Combined with the characteristics of geotechnical engineering, taking advantage of the good extensibility of IFC, this paper proposes a “Built-In Generation Schema” for geotechnical structure models and a “Plug-In Extension Schema” for three-dimensional (3D) geological models, ultimately forming the basic data system of geotechnical engineering information models based on IFC. Applying extended IFC to the modeling process, the BIM-based modeling method of geotechnical models is proposed. In addition, an IFC-based platform is developed to integrate geological models and structure models for further displaying and analyzing of geotechnical engineering models. The work in this paper provides a feasible way and technical support for promoting the integration and sharing of geotechnical engineering information and enhancing the multiprofessional collaborative work.


Author(s):  
Fabrizio Banfi ◽  
Daniela Oreni

The latest developments in the field of generative modeling and building information modeling for heritage building (HBIM) have allowed the authors to increase the level of transmissibility of information through the most modern techniques of virtual and augmented reality (VR-AR). This chapter summarises the last years of applied research in the field of three-dimensional modeling oriented to digitise and correctly represent the built heritage thanks to the integration of the most modern three-dimensional survey techniques with a scan-to-BIM process based on new grades of generation (GOG) and accuracy (GOA). The new paradigm of the complexity of the built heritage, its tangible and intangible values, have been shared through new immersive ways able to increase the information contents and the knowledge accumulated in the last years of one of the most representative and unique buildings of the Lombard architecture: the Cà Granda in Milan.


2020 ◽  
Vol 8 (12) ◽  
pp. 981
Author(s):  
Paola Valdepeñas ◽  
María Dolores Esteban Pérez ◽  
Carlos Henche ◽  
Raúl Rodríguez-Escribano ◽  
Gonzalo Fernández ◽  
...  

This work represents a paradigm shift in the approach to manage port infrastructure maintenance where the use of the building information modeling (BIM) method is very scarce, and it is now beginning. The new infrastructure conservation management method proposed in this manuscript combines traditional methods with new technology, covering the gap of the implementation of BIM in port maintenance. This new technology is the BIM method, and its use is already mandatory in public infrastructure projects in some countries. In this work, the BIM method is applied to the management of the conservation of port infrastructures to show the benefits that can be obtained using it. After the analysis of the state of the art in the conservation of port infrastructures, two of the main maritime works of the Outer Port of A Coruña were modeled in Revit. This as-built model serves as an inventory model and forms a large database of all the information regarding the conservation of the structures. In this way, all the data on the conservation of the port’s infrastructures are concentrated in a single source of information in which, in addition, there is a three-dimensional and georeferenced representation of the port in question. The main finding of this work is the development of a step by step method to implement BIM philosophy in port maintenance, highlighting the positive and negative points detected during the validation of the method in a real case, detecting future improvement research lines. Although BIM has a lot of advantages and possibilities just now, some improvements are still necessary.


2020 ◽  
Vol 10 (24) ◽  
pp. 9029
Author(s):  
Bokyeong Lee ◽  
Hyeonggil Choi ◽  
Byongwang Min ◽  
Dong-Eun Lee

In this study, by applying the developed formwork automation design software to three target structures, we reviewed the applicability of the formwork automation design software for the aluminum formwork. To apply the formwork automation design software, we built an aluminum formwork library based on the conversion of two-dimensional (2D) computer-aided design (CAD) data to three-dimensional building information modeling data for all the components of the aluminum formwork. The results of the automated formwork layout on the target structures using the formwork automation design software confirmed that the wall and deck members were laid out by the set algorithm according to the formwork size and direction. However, because of the limited functionality of the software, the level of completion of the formwork layout was found to be lower than that of the manual formwork layout based on 2D CAD data. The currently developed software is based on a simple algorithm, but has a drawback in that the automated layout is limited to only some of its members. Therefore, additional research should be conducted on the development of advanced software through the diversification of the algorithm, automation of preprocessing of the mesh, and analysis of the relationships of all the members comprising the formwork.


2014 ◽  
Vol 926-930 ◽  
pp. 1890-1893
Author(s):  
Yan Wen Wang ◽  
Xu Guang Yang

Building Information Modeling is another important computer application technology in the field of building after the CAD computer-aided design technology appearance. BIM modeling using information technology to greatly improve the degree of integration of information, which makes the quality and efficiency of the design and the whole items greatly improved. Its greatest value is reflected in the three-dimensional design technology and collaborative design, which bring huge benefits for the development of the interior design industry. Besides, it completely changed the traditional design patterns, letting the two-dimensional drawings into intuitive and accurate BIM model data. BIM technology new design pattern, design process and efficient design changes for the quality and construction of interior design provides a reasonable and scientific decision-making.


2018 ◽  
Vol 4 (1) ◽  
pp. 27 ◽  
Author(s):  
Jaime Santamarta Martínez ◽  
Javier Mas Domínguez

ResumenLa metodología BIM (Building Information Modelling), ampliamente implantada en el sector de la edificación y de la arquitectura, ha transformado la manera de desarrollar tanto los proyectos como las obras de construcción. Si bien la esencia de esta metodología se basa en la generación de un modelo tridimensional, la visualización de éste a través de dispositivos bidimensionales hace que la experiencia e interacción con el modelo no sea plena. Es por ello que la aparición en el mercado de nuevas tecnologías como la realidad virtual y la realidad aumentada, abren un amplio abanico de posibilidades ligadas al sector de la construcción. En este sentido, en Acciona Ingeniería se ha desarrollado un proyecto piloto en colaboración con Trimble y Microsoft donde a partir de un modelo BIM se ha creado una realidad aumentada basada en hologramas, que permitan recrear una simulación aplicada a la construcciónAbstractThe BIM (Building Information Modeling) methodology, widely implemented in the building and architecture sector, has transformed the way to develop both projects and construction works. Although the essence of this methodology is based on the generation of a three-dimensional model, the visualization of it through two-dimensional devices means that the experience and interaction with the model is not complete. That is why the appearance in the market of new technologies such as virtual reality and augmented reality, open a wide range of possibilities linked to the construction sector. In this sense, Acciona Engineering has developed a pilot project in collaboration with Trimble and Microsoft where, based on a BIM model, an augmented reality based on holograms has been created, allowing to recreate a simulation applied to construction


2021 ◽  
Vol 244 ◽  
pp. 05002
Author(s):  
Ella Okolelova ◽  
Marinna Shibaeva ◽  
Natalya Trukhina ◽  
Oksana Konitskaya

The paper presents the results of research in the field of the use of innovative technologies in the design of buildings. The modern technologies of information modeling, in particular, BIM, which makes it possible to represent the building not only in three-dimensional space, but also allows designing it in the dynamic system « design - construction – operation » are considered. The experience of using BIM technologies is based on identifying errors at the initial design stage and the possibility of their elimination at the same stage. The development of mechanisms for detecting design errors and defects formed the basis of the task set in the work. A model for signaling about the detection of defects has been developed, and the problem of stochastic modeling of the qualitative parameters of the designed object has been solved.


2019 ◽  
Vol 2018 (1) ◽  

Building Information Modeling (BIM) is considered among the most challenging developments in the Architectural, Engineering, and Construction (AEC) industries. BIM is a software based three-dimensional design process that helps the AEC staff obtain and manage the digitally represented building data to support engineering, construction, procurement, and installation activities. The diffusion of the BIM approach in the construction industry has gained acceleration in the last decade. With the advances in information technologies, existence of highly capable commercial software packages, and mandates dictated by the clients, many construction companies have started to employ BIM in their projects. This study aims to investigate the BIM transition process in the construction companies. An interview has been conducted with the executives of a Turkish construction company to analyze the BIM transition process, through three main phases: pre-transition period, transition period, and post-transition period. In the pretransition period, the motivations of the company to adopt the BIM approach are examined. In the transition period, the challenges encountered and preventive measures taken are indicated. In the post-transition period, the short- and long-term effects of adopting the BIM approach are discussed. The study is expected to guide the construction professionals that intend to implement BIM in their transition process.


2019 ◽  
Vol 2018 (1) ◽  

Building Information Modeling (BIM) is considered among the most challenging developments in the Architectural, Engineering, and Construction (AEC) industries. BIM is a software based three-dimensional design process that helps the AEC staff obtain and manage the digitally represented building data to support engineering, construction, procurement, and installation activities. The diffusion of the BIM approach in the construction industry has gained acceleration in the last decade. With the advances in information technologies, existence of highly capable commercial software packages, and mandates dictated by the clients, many construction companies have started to employ BIM in their projects. This study aims to investigate the BIM transition process in the construction companies. An interview has been conducted with the executives of a Turkish construction company to analyze the BIM transition process, through three main phases: pre-transition period, transition period, and post-transition period. In the pretransition period, the motivations of the company to adopt the BIM approach are examined. In the transition period, the challenges encountered and preventive measures taken are indicated. In the post-transition period, the short- and long-term effects of adopting the BIM approach are discussed. The study is expected to guide the construction professionals that intend to implement BIM in their transition process.


2021 ◽  
Vol 2094 (3) ◽  
pp. 032031
Author(s):  
V I Zhadanov ◽  
I N Charikova ◽  
V M Shardakov

Abstract Building information modeling provides an integrated three-dimensional environment applied to the management of large-scale engineering projects, allowing you to reduce the cost and time for planning structures and requirements for the reliability of buildings. The purpose of this work is to develop a methodology for changing the layout and reliability factor during the visualization of three-dimensional models to improve the analysis of building plans. This approach will allow you to combine different analytical methods and approaches when planning different structures. The results of this work suggest new directions for future research in the field of information visualization for the construction complex. The system is compatible with portable and scalable mobile devices. The proposed system can also be used for pre-project architecture and augmented visualization, where proprietary developed methods are used to achieve the quality of photorealistic rendering.


Sign in / Sign up

Export Citation Format

Share Document