scholarly journals Building Information Modeling Based Building Sustainability Assessment Framework for Kazakhstan

Buildings ◽  
2021 ◽  
Vol 11 (9) ◽  
pp. 384
Author(s):  
Gulzhanat Akhanova ◽  
Abid Nadeem ◽  
Jong R. Kim ◽  
Salman Azhar ◽  
Malik Khalfan

The use of building information modeling (BIM) for building sustainability assessment (BSA) is a thriving topic within the architecture, engineering, and construction industry. Despite the various research approaches to employing BSA with BIM support, the research is limited to the BIM implications of BSA methods in developing countries. This paper presents how BIM can assist the BSA processes in Kazakhstan, using a previously developed building sustainability assessment framework for Kazakhstan (KBSAF). This framework has 46 assessment indicators grouped into nine assessment categories. The categories and assessment indicators of KBSAF were derived considering the regional variations and country-specific differences in the assessment factors. In this paper, BIM functions for BSA were identified through literature review; their applicability for KBSAF was evaluated by mapping the functions with the assessment indicators of KBSAF and a BIM-based BSA framework (BIM-KBSAF) was proposed. The proposed framework was validated through a three-round Delphi survey. One of the results demonstrates that for KBSAF, BIM can assess 24 out of 46 assessment indicators. The proposed framework could serve as a systematic guide to the application of BIM for BSA. Furthermore, it can facilitate the BSA process and save considerable time and effort.

2014 ◽  
Vol 567 ◽  
pp. 559-564 ◽  
Author(s):  
Syed Shujaa Safdar Gardezi ◽  
Nasir Shafiq ◽  
Muhd Fadhil Nuruddin ◽  
Syed Ahmad Farhan ◽  
Usman Aminu Umar

The construction industry of Malaysia is very dynamic in nature and the adoption of new technological advancements and construction methods has been a prime concerns for its key players and stakeholders. However, the adoption of BIM in such a dynamic industry is observed to be limited and its implementation has not been as successful as it should have been. The study focuses on the identification and prioritization the factors challenging the implementation of BIM in Malaysian construction industry. The data has been administrated through designed questionnaire by identifying the factors / barriers, by literature review, for implementation of BIM in construction industry. The prioritization of such factors is expected to help the major stake holders to address the issues according to their priority which will save lot of previous time and financial with smooth implementation of BIM in Architecture, Engineering and Construction (AEC) industry in future project.


2018 ◽  
Vol 7 (2) ◽  
pp. 107 ◽  
Author(s):  
Shakil Ahmed

Construction industry is one of the largest economic sector in the world in 2017. And Building Information Modeling (BIM) is the powerful set of technology to design, construction and management has been strengthen the construction industry. BIM has significant benefits for the project lifecycle even after it’s lifecycle but this benefits can’t gain by the project because of failure to successful implementation of BIM technology to the construction industry. The main objectives of this study is to identify the most crucial barrier to implementation of BIM and develop a relative rank with their relative impact on this issue. The study was conducted by a comprehensive literature review and necessary data was collected by literature review also. A set of barrier was developed by the literature review containing 37 barrier which curb the implementation of BIM technology to the construction sector. Relative rank based on their frequency and relative impact was calculate for each barrier identified in the literature review. The five most crucial barrier to the implementation of BIM are B17 (Social and habitual resistance to change), B19 (Traditional methods of contracting), B3 (Training expenses and the learning curve are too expensive), B20 (High cost of software purchasing) and B33 (Lack of awareness about BIM). And the five most impactful barrier are B19 (Traditional methods of contracting), B17 (Social and habitual resistance to change), B33 (Lack of awareness about BIM), B2 (Unavailability of proper training on BIM) and B28 (Lack of BIM experts). To gain the tremendous benefits of BIM technology, it is necessary to overcome the barrier based on priority with the help of government and all the stakeholder of project.


2015 ◽  
Vol 23 (5) ◽  
pp. 764-779 ◽  
Author(s):  
Chengshuang SUN ◽  
Shaohua JIANG ◽  
Miroslaw J. SKIBNIEWSKI ◽  
Qingpeng MAN ◽  
Liyin SHEN

Building Information Modeling (BIM) has had a profound effect on the construction industry. It has greatly improved coordination among stakeholders, enhanced productivity, and increased profits. However, many factors still limit the application of BIM in the construction industry. This study conducts a literature review to identify these negative factors. Firstly, twenty-two sub-factors are identified and classified into five categories: Technology, Cost, Management, Personnel, and Legal. Secondly, some suggestions for eliminating these limiting factors are given. Finally, the study also identifies further research directions for improving BIM theory and applying BIM technology widely and successfully. The results of this study will provide support for practitioners who are using or plan to use BIM.


Facilities ◽  
2019 ◽  
Vol 37 (7/8) ◽  
pp. 455-483 ◽  
Author(s):  
Manish K. Dixit ◽  
Varusha Venkatraj ◽  
Mohammadreza Ostadalimakhmalbaf ◽  
Fatemeh Pariafsai ◽  
Sarel Lavy

Purpose The purpose of this study is to investigate factors that impede the integration of facilities management (FM) into building information modeling (BIM) technology. The use of BIM technology in the commercial construction industry has grown enormously in recent years. Its application to FM, however, is still limited. The literature highlights issues that hinder BIM–FM integration, which are studied and discussed in detail in this paper. Design/methodology/approach A review of literature is conducted to identify and categorize key issues hampering the application of BIM to FM. This paper has also designed a questionnaire based on a literature review and surveyed FM professionals at two industry events. Using the collected responses, these issues are analyzed and discussed using non-parametric statistical analyses. Findings A total of 16 issues are identified through the literature review of 54 studies under the four categories of BIM-execution and information-management, technological, cost-based and legal and contractual issues. The results of the survey of FM professionals (with 57 complete responses) reveal that the single most important issue is the lack of FM involvement in project phases when BIM is evolving. Originality/value The findings of this study could assist the construction industry (e.g. building-material and equipment manufacturers, design professionals, general contractors, construction managers, owners and facility managers) with creating guidelines that would help in BIM–FM integration. BIM is a virtual database that contains important design and construction information, which can be used for effective and efficient life cycle management if building data are captured completely and accurately with a facility manager’s involvement.


2014 ◽  
Vol 519-520 ◽  
pp. 1447-1450 ◽  
Author(s):  
Hua Liu ◽  
Jian Zhao

Nowadays, Building Information Modeling (BIM) is world used in the construction industry, especially in those developing countries in the North America and Europe. In China, only some big design institutes are or have been applying this technology. This paper concretely the situation and barrier of using BIM in China, expounds its application prospect in China based on the relationship between BIM technology and the related parties.


2020 ◽  
Vol 25 ◽  
pp. 161-172 ◽  
Author(s):  
Abdalrahman Elshafey ◽  
Chai Chang Saar ◽  
Eeydzah Binti Aminudin ◽  
Masoud Gheisari ◽  
Abdulrahman Usmani

The digitalization of the construction industry has immense potential for dramatically improving the industry’s practices. Concerning current measures in construction project management, the industry is still dependent on traditional construction methods. However, the application of fully automated techniques within the construction industry has not yet been a widespread practice. Thus, this may explain why there is a slow adaption of digital growth within the construction industry and specifically in developing countries. This study is aiming to investigate the acceptance of Building Information Modeling (BIM) and Augmented Reality (AR) integration in the construction industry. To achieve this aim, Technology Acceptance Model 3 (TAM3) was utilized. The scope was narrowed down to four developing counties (Malaysia, Egypt, Saudi Arabia, and Turkey) and a questionnaire survey was developed and distributed between construction professionals in those countries for data collection purposes. Exploratory Factor Analysis (EFA) was used to develop the TAM, and a regression analysis is used to validate it. The developed TAM3 showed that users control over BIM-AR and perception of easiness of use has the highest influence on their perception of the system usefulness, which would positively affect their intention to use the system. Additionally, unlike the findings of the original TAM3, three variables of Image, Perception of External Control, and Voluntariness illustrate new relations which can be considered as a novel outcome. The outcomes of this study can be used to evaluate the acceptance of BIM-AR Integration in the construction industry context, and the developed TAM3 can be used for the development of new BIM-AR applications in developing countries as it can predict the BIM and AR users’ acceptance.


2012 ◽  
Vol 1 (2) ◽  
pp. 17-29 ◽  
Author(s):  
Mohamed Marzouk ◽  
Mohamed Hisham

Bridge Information Modeling (BrIM) is considered an innovation in bridge engineering and construction industry. This paper presents a methodology for using BrIM as an assisting tool in performing detailed cost estimates. The methodology depends on integrating visualization feature of BrIM with specific attributes of the BrIM model intelligent components. A program developed using C# language is used to extract the visualization conclusions and other components’ attributes to MS Excel spreadsheet. This sheet assists in performing detailed cost estimate, and reviewing the estimate. The paper also presents a methodology for generating cash flow and required payments. This methodology depends on integrating the developed program with 4D feature of BrIM.


2014 ◽  
Vol 501-504 ◽  
pp. 2700-2705 ◽  
Author(s):  
Li Shen ◽  
Ya Xing Lin

The application of Building Information Modeling has become a trend in construction industry, it is our duty to accelerate BIM application in recent years. Firstly, the paper generally introduced the concepts and characteristics of BIM, and pointed out the problems that existed in Chinas Project Management of Construction Enterprises, and theoretically, technically discussed the solutions to these issues with BIM technology in a qualitative way. At last, the paper proposed some suggestions and outlooks for the development and promotion of BIM technology in China.


Sign in / Sign up

Export Citation Format

Share Document