scholarly journals Extending the IFC Standard to Enable Road Operation and Maintenance Management through OpenBIM

2021 ◽  
Vol 10 (8) ◽  
pp. 496
Author(s):  
Sara Ait-Lamallam ◽  
Reda Yaagoubi ◽  
Imane Sebari ◽  
Omar Doukari

Open Building Information Modelling (OpenBIM) is a collaborative project management process. Its application to road infrastructures is currently limited. OpenBIM standards for infrastructure are still under development. One of these standards is the Industry Foundation Classes (IFC), which is a data architecture for modelling infrastructure projects. The current and upcoming releases of IFCRoad focus on structuring data for the design and construction phases of an infrastructure’s lifecycle. Semantics of the O&M process phase are not fully integrated within these standards. This paper proposes an extension of the IFC schema to enrich this standard with semantics inherent in the O&M phase of road infrastructures. This extension, based on IFCInfra4OM ontology, allows the OpenBIM process to be fully applied to road infrastructures. Its implementation on a case study relative to the A7 Agadir–Marrakech Highway in Morocco enables, on the one hand, analysis and compliance with O&M management requirements on the basis of a single container: the IFC-BIM-based model. On the other hand, it allows comparison of the OpenBIM process with that of ClosedBIM for the integration of O&M data into BIM for a road infrastructure.

2012 ◽  
Vol 16 (3) ◽  
pp. 253-260 ◽  
Author(s):  
John Gelder

This paper looks at the evolution of the structure of construction contract documentation over time, from ancient Greece through to the near future, in terms of the degree to which the contract documentation is integrated. Documentation might comprise anything from a single ‘integrated’ text to a range of ‘dis-integrated’ documents, fashioned by different players in the procurement process and not offering an easily appreciable integrated whole. The paper ends with the hope that new digital methods of information production will lead to better integrated and more easily readable ‘wholes’ in the new forms offered by building information modelling (BIM), which in turn will facilitate collaborative working.The paper shows that contract documentation has evolved through four stages of integration: Integrated: up to the end of the medieval period construction contract documentation was essentially fully integrated – everything that was required was stated in the one written document, which typically covered contract conditions, building layouts, assembly descriptions, quantities of components and requirements for quality.


Buildings ◽  
2021 ◽  
Vol 11 (8) ◽  
pp. 323
Author(s):  
Vachara Peansupap ◽  
Pisal Nov ◽  
Tanit Tongthong

The kingpost was a vertical element that was used to support the structural strut in the deep excavation. The structural kingpost was commonly arranged by experienced engineers who used two-dimensional construction drawings. Thus, it was still time-consuming and error-prone. Currently, an available construction program has been developed to arrange the structural kingpost by identifying the clash problems in the 3D environment. However, they have a limitation for detecting the clash that was unable to visualize the concurrent clashes between kingpost and many underground structures. Then, the engineer cannot see all the clash incidents with each kingpost and move the kingpost to avoid the clashes successfully. Since the kingpost arrangement was still an inefficient practice that was limited in the visualization aspect, this research used engineering knowledge and advanced construction technology to detect and solve the clashes between kingposts and underground structures. The methodology used engineering knowledge of kingpost arrangement to develop the system modules by using a rule-based approach. Then, these modules were developed into the system by using visual programming of Building Information Modelling (BIM). To test the system, an underground structure from building construction was selected as a case study to apply the developed system. Finally, the finding of this study could overcome human judgment by providing less interaction in the kingpost arrangement and visualization improvement of clash occurrences in the 3D model.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
S. Hemalattha ◽  
R. Vidjeapriya

PurposeThis study aims to develop a framework for optimizing the spatial requirements of the equipment in a construction site using a geographic information system (GIS).Design/methodology/approachAn ongoing construction project, an existing thermal powerplant in India, is considered to be the case study, and the corresponding construction activities were scheduled. The equipment spaces were defined for the scheduled activities in building information modelling (BIM), which was further imported to GIS to define the topology rules, validate and optimize the spatial requirements. The BIM simulates the indoor environment, which includes the actual structure being constructed, and the GIS helps in modelling the outdoor environment, which includes the existing structures, temporary facilitates, topography of the site, etc.; thus, this study incorporates the knowledge of BIM in a geospatial environment to obtain optimized equipment spaces for various activities.FindingsSpace in construction projects is to be considered as a resource as well as a constraint, which is to be modelled and planned according to the requirements. The integration of BIM and GIS for equipment space planning will enable precise identification of the errors in the equipment spaces defined and also result in fewer errors as possible. The integration has also eased the process of assigning the topology rules and validating the same, which otherwise is a tedious process.Originality/valueThe workspace for each activity will include the space of the equipment. But, in most of the previous works of workspace planning, only the labour space is considered, and the conflicts and congestions occurring due to the equipment were neglected. The planning of equipment spaces cannot be done based only on the indoor environment; it has to be carried out by considering the surroundings and topography of the site, which have not been researched extensively despite its importance.


Author(s):  
L. Gobeawan ◽  
S. E. Lin ◽  
X. Liu ◽  
S. T. Wong ◽  
C. W. Lim ◽  
...  

Abstract. There has been a growing interest in integrating vegetation into the built environment in order to ameliorate the negative effects of increasing urbanisation. In Singapore, government policies encourage the inclusion of skyrise greenery into new and existing buildings. To further streamline workflows, statutory BIM (Building Information Modelling) submissions in architecture, engineering and construction (AEC) industries have been mandated. However, landscape plans are still excluded from these BIM submissions due to the lack of a centralised vegetation database and the absence of a standardised BIM format for landscape architectural submissions. This paper presents a streamlined methodology for creating and using a centralised vegetation library for landscape architects. The workflow leverages off the Industry Foundation Classes (IFC) standard for data exchange regardless of the BIM authoring software used and provides a framework of four operational modules: an expandable and low-maintenance species-level vegetation library, a BIM authoring workflow that allows inclusion of vegetation objects, an IFC interface, and a lightweight 3D vegetation model generator. This paper also showcases a use-case of embedding information-enriched 3D vegetation objects into a simulated landscape plan. The proposed workflow, when adopted in AEC industries, will enable governing agencies to track diverse greening efforts by the industry and to potentially include other measurements such as cooling performance or maintainability.


2021 ◽  
Vol 26 ◽  
pp. 643-656
Author(s):  
Amichai Mitelman ◽  
Ury Gurevich

The topic of Building Information Modelling (BIM) adoption by public organizations has become a central subject of research, and a significant amount of BIM documents, guidelines, and standards have been created to meet different organizational purposes. Compared to the building industry, the application of BIM tools for tunnel project management is lagging far behind. This paper proposes a methodology for integrating BIM tools for conventional tunnelling. A fundamental distinction is made between the tunnel internal architectural domain and the external structural domain. For the former, BIM methodology can be applied similarly to the building industry. For the latter, it is suggested that a BIM model be built according to the essential information generated during tunnelling excavation. The proposed methodology was put to test for an actual tunneling project. A routine was established where the supervisor on behalf of the owner was responsible for gathering and reporting essential data in tabular form. Via REVIT's Application Programming Interface (API), a code was developed so that a BIM model was built and updated automatic to data insertion. Ultimately, the final BIM model allows managing up-to-date qualitative and quantitative information visually. Thus, human understanding and interpretation are enhanced for future uses, such as maintenance, future renovations and project post-analysis.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Zul-Atfi Bin Ismail

PurposeThe contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes.Design/methodology/approachThis paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system.FindingsConventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed.Originality/valueThe conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.


2017 ◽  
Vol 15 (1) ◽  
pp. 15-34 ◽  
Author(s):  
Olufolahan Oduyemi ◽  
Michael Iheoma Okoroh ◽  
Oluwaseun Samuel Fajana

Purpose The purpose of this paper is to explore and rank the benefits and barriers (technological and non-technological) of using Building Information Modelling (BIM) in sustainable building design. It also employs the use of a design tool analysis of a case study using BIM compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North. Design/methodology/approach The paper explores the benefits and barriers of using BIM through a literature review. Regression and factor analysis were used to rank these benefits and barriers. A questionnaire was distributed to a sample of 120 practitioners with 69 completing the survey. Finally, the paper employs the use of a design tool analysis of a case study using BIM-compatible tools (Ecotect and Green Building Studio) to determine the environmental performance of a proposed multi-use building at Derby North riverside. Findings The key findings of the statistical analysis indicated that professionals ranked the integrated project delivery as the most established benefit, while the lack of interoperability was ranked the greatest technological challenge. Only three of the attributes of non-technological challenges made statistically unique contributions, namely, training costs and software costs, client demand and potential legal issues. It was also discovered that BIM delivers information needed for environmental performance. In a forward-looking approach, the paper attempts to provide some recommendations that would encourage the continuous application of BIM in sustainable building design. Research limitations/implications This paper does not cover all features of BIM functionality, as the scope of BIM is very enormous and the resources of this research were limited. Practical implications The implication of the study is that it will assist in exploring and ranking the benefits and barriers (technological and non-technological) of using BIM while proffering recommendations for future use. This research will be of interest to industry practitioners and academic researchers with an interest in building information modelling. Originality/value This paper contributes with new outlooks aimed at syndicating sustainability with environmental performance and adds to the limited empirical studies on the benefits and barriers of the application of BIM.


2020 ◽  
Vol 897 ◽  
pp. 166-172
Author(s):  
Zahraa Ali Jalil ◽  
Hafeth I. Naji ◽  
Mohammed Mahmood

The number of destroyed cities in Iraq has increased significantly over the last five years. It presents a negative impact on the country's economy on the one hand and on the environment on the other. Reconstruction of these cities requires substantial capital to provide building materials needed for reconstruction and this leads to depletion of natural resources. This paper aims at finding an effective management method that contributes to the investment of the remnants of the components of destroyed buildings, including reinforcing steel, using the building information modelling (BIM) technique. The results showed that the amount of steel reinforcement that can be obtained from the destroyed buildings is enormous. Therefore, these quantities must be addressed through reusing or recycling. The sale of these quantities as recycling materials can provide a large income which can be added to the capital of the project.