The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. According to Mendelson and Greenfield (1996) the remaining part of the twentieth century would involve corporations, institutions and government in a race to survive. A tremendous demand of development worldwide has gained interest of Malaysian construction firms to venture into international construction domain. Identifying and analysing major determinants of the firm's internal and external factors are crucial in order to ease the complexity in global market expansion. This study identifies the factors that are involved in reduction of international projects and its implications on the local economy and contractor companies. Construction projects are currently progressing slowly around the world as a result of the recent global economic crisis. In order to accommodate public needs within the current economic situation, the Malaysian Government has restricted the procurement of public sector projects to "necessary to meet public need" projects only thus narrowing the number of domestic projects available. Consequently, most major contractors have decided to change their focus by looking into international projects outside Malaysia not only to ensure the viability of their businesses but also for long-term survival. Although some Malaysian contractors have managed to penetrate successfully into international construction projects, Finally, this study is of relevance to Malaysian construction firms as it systematically highlights the internal and external factors those may affect their performance in international market. Type of Paper: Review Keywords: International Market; Malaysian Perspective; Causes; Critical Factors.

2020 ◽  
Vol 27 (9) ◽  
pp. 2687-2713
Author(s):  
Satish Kumar Viswanathan ◽  
Kumar Neeraj Jha

PurposeA number of previous studies have investigated international construction project risks and have proposed risk mitigation measures without examining their interdependence. The purpose of the current study is to identify the influence of various risk mitigation measures on macro-level risk factors in the international marketplace.Design/methodology/approachThe authors initially identified 26 risk variables and nine risk mitigation measures through a literature review, which were then verified for their pertinence to international projects by three experts. Subsequently, 105 questionnaire survey responses were collected and analysed using factor analysis and structural equation modelling to test the interrelations between the risk variables and mitigation measures.FindingsThe findings suggest that joint ventures with local partners is emerged as the most critical risk mitigation measure that influences the international projects, which are exposed to political, project and firm-specific risk factors. Further, it is worth noting that among the recognised risk mitigation measures in international projects, offering more local employment is the least critical mitigation measure in the international projects.Research limitations/implicationsThe findings of this study are based on the macro-risk factors encountered by Indian construction firms in international projects, mostly from specific Asian and African regions. Thus, the opinions of construction firms from the developed countries might be different.Originality/valueThe main contribution of this study to existing knowledge is empirical evidence of the interrelationships between risk mitigation measures and risk factors that are portrayed as latent variables of different manifest risk variables. The generated model can assist construction firms in emphasising several risk mitigation methods, in order to reduce risk and enhance performance in international construction projects.


2010 ◽  
Vol 16 (1) ◽  
pp. 47-56 ◽  
Author(s):  
Serdar Ulubeyli ◽  
Ekrem Manisali ◽  
Aynur Kazaz

This paper presents a study of subcontractor selection practices of Turkish contractors in international projects. The results highlight the current subcontracting practices of main contracting firms that have resulted in a long‐lasting market share abroad. Toward this aim, a detailed questionnaire was administered to 96 construction companies. Turkish and host countries’ subcontractors were shown to be frequently employed in international projects. However, subcontracting firms from other countries were found to not be used. Main contracting companies generally select subcontractors in the periods after the main tender or after the project's start. Although many of them often work with previously known subcontracting companies and do not take into account the lowest bid price as the primary criterion, systematic processes or models are not used to select the best subcontractor. Most importantly, main contractors not only use subcontractors but also carry out activities using their in‐house resources. Hence, this study will not only be a step for further works that can be performed by potential researchers who may find interesting similarities or differences between their countries and Turkey, but also assist contractors who plan to strengthen their positions and to increase work opportunities in the international market. Santrauka Straipsnyje pateikiami Turkijos generaliniu rangovu praktiniai subrangovu parinkimo tyrimai, vykdant tarptautinius pro‐jektus. Akcentuojama dabartine generalinio rangovo imoniu subrangos praktika, kuri sudaro ilgalaike ir plačia rinkos dali. Šiam tikslui buvo išsamiai apklausta iki 96 statybos imoniu. Turkijos ir kitu vadovaujančiaja pozicija užimančiu šaliu subrangovai teige, kad dažnai dirba su tarptautiniais projektais. Tačiau kitu šaliu subrangos imones nedalyvauja toje veik‐loje. Generalines rangovo imones paprastai pasirenka subrangovus pateikus pagrindini pasiūlyma arba projekto pradžioje. Nors daugelis iš ju dažnai dirba su jau anksčiau žinomomis subrangos imonemis ir pasirinkdamos geriausia subrangova neatsižvelgia i pagrindini rodikli‐ žemiausia siūloma kaina, nenaudoja sisteminiu procesu ar modeliu. Svarbiausia, kad generaliniai rangovai naudojasi ne tik subrangovu paslaugomis, bet ir vykdo veikla, naudodamiesi ju turimais vidaus ištekliais. Taigi šis tyrimas bus ne tik potencialiu tyreju žingsnis igyvendinti ir rasti idomiu panašumu bei skirtumu tarp šiu šaliu ir Turkijos, bet ir padeti rangovams stiprinti savo pozicijas bei didinti isidarbinimo galimybes tarptautineje rin‐koje.


2018 ◽  
Vol 13 (1) ◽  
pp. 35-45
Author(s):  
Cut Zukhrina Oktaviani

This paper aims to reviewed construction projects complexity in construction complex procurement. Construction complexity is influenced with many internal and external factors. Complexity covers entire construction project cycles. At construction work procurement stage, organization and processes complexity is a major concern, especially in government procurement. Complexity requires regulation and control are such that it does not happen obstacles at every project construction cycle stage. 


Author(s):  
Lana Lovrenčić Butković

Abstract Due to the wide range of opportunities, collaborations, and challenges offered by the international construction sector, interest in international construction is on the rise. Construction companies must be able to carry out international construction projects (ICPs) more effectively and efficiently. However, executing ICPs is more challenging than executing domestic construction projects. Considering the peculiarities of the construction industry and the associated complexity of construction projects, construction companies should decide on international capability and the selection of an ICP through a careful evaluation of their critical success factors (CSFs). Most of the previous research deals with the concept of CSFs in the context of project management in general, but few studies have identified CSFs for ICPs. To fill that gap in current research, the main objective of this study was to identify and group CSFs for ICPs. A total of 37 CSFs were identified after conducting a detailed literature review and a pre-pilot study. A new framework of CSFs for ICPs was proposed following primary research, which was conducted through in-depth interviews with leading experts in international projects. Although the constructability/complexity factor of the project received the highest rating in terms of importance to the success of the ICP, the next most critical factors were found to be external factors, such as local contractor/subcontractor, investor, and presence of a foreign partner. The results of this research may help participants involved in ICPs to improve their understanding of the international construction environment and deliver more successful ICPs.


2020 ◽  
Vol 27 (5) ◽  
pp. 1169-1190 ◽  
Author(s):  
Satish Kumar Viswanathan ◽  
Kumar Neeraj Jha

Purpose International construction projects encompass various risks, and it is essential to evaluate and manage them to achieve project and firms’ success. As approaches to addressing international market risks vary from one country to another, the purpose of this paper is to identify the critical risk factors of embarking on international construction projects according to Indian experiences. Design/methodology/approach After primarily verifying the identified 26 risk variables, a questionnaire survey was conducted to draw upon the views of experts who possess international project experience. The 105 responses were analyzed using univariate and multivariate techniques. An analysis of variance identified the significant variables that influence overall performance on international construction projects, which were then grouped according to underlying relationships using factor analysis to determine the specific risk factors. Furthermore, considering these risk factors as independent variables and overall project performance as a dependent variable, a stepwise regression analysis was carried out to identify relatively critical risk factors. Findings The results revealed that of the identified four risk factors, the project-specific risk factor emerged as the foremost critical risk factor, the economic and market-specific risk factor was the second most critical risk factor, the firm-specific risk factor was the third most critical risk factor and the political-specific risk factor was the least critical risk factor. These findings were also validated appropriately. Research limitations/implications This study was limited to the data acquired from Indian construction firms, predominantly consultants and contractors. Though the survey respondents possessed adequate familiarity in international construction, commonly perceived limitations in self-reported surveys such as the lack of conscientious responses and reporting bias were not an exception in this research. Practical implications The risk factors and their criticality – as identified in this study – can aid the multinational firms and international aspirants to prioritize the critical aspects and develop a suitable risk mitigation strategy to achieve greater project success in international market. Originality/value By investigating the various risk factors that influence overall performance of international construction projects, this research considerably contributes to the body of knowledge pertaining to international construction risk management that will enable firms from India and similar developing nations to emphasize on critical risk factors.


2006 ◽  
Vol 33 (1) ◽  
pp. 58-68 ◽  
Author(s):  
Irem Dikmen ◽  
M Talat Birgonul

Risk assessment of international projects is a complicated task because of the sensitivity of project success related to country specific risks as well as project risks. Decision makers face the difficulty of weighing project opportunities against risks and determining attractiveness of projects while giving bidding decisions. The aim of this paper is to propose a methodology for risk and opportunity assessment of international projects. The proposed model uses an analytic hierarchy process for calculation of risk and opportunity ratings. A risk breakdown structure, specific to international construction projects, is proposed as well as a list of factors that affect the ability of construction companies to manage risk. An application of the proposed methodology is demonstrated by using real data supplied by a construction company that is experienced in international markets. Ranking of project options is made according to the opportunity and risk ratings that are calculated by using the proposed methodology based on the judgments of company professionals.Key words: international construction, risk assessment, analytic hierarchy process.


2019 ◽  
Vol 11 (2) ◽  
pp. 182
Author(s):  
Nirmala Dewi ◽  
Moh Arafa ◽  
Rika Suprapty

The purpose of this research is investigatinhg and analyzing the basic needs of Community-Based Savings and Loan Institutions as well as efforts in local economic development and determining the strategies needed in developing the capacity of Community-Based Savings and Loan Institutions (LSPBM) and Small and Medium Enterprises (SME) in Siboang Village. This research also investiagates the role of LSPBM in the social and economic fields as well as internal and external factors to create strategies supporting the existence of LSPBM in Siboang village in order to empower local communities.This study applies a qualitative approach supported by the study of quantitative data. The data collected consists of primary data and secondary data. Primary data was collected by in-depth interviews with key figures and the researcher conducted observations, while secondary data were obtained from various literature studies including population documents from Sojol Subdistrict, Siboang Village and the 2016 Joint Venture LSPBM Annual Report. Information consisted of the Joint Venture LSPBM Management of Siboang Village, Secretary of Siboang Village, and Village Head. The technique of analyzing primary data and secondary data is processed through three stages of activity and carried out simultaneously, namely data reduction, data presentation and drawing conclusions through verification. Furthermore, qualitative data is processed into quantitative data, the researcher applies the SWOT analysis method that deals with internal and external factors of qualitative research that will produce a development strategy for the Joint Venture LSPBM.The results shows that the role of LSPBM is quite large in encouraging the local economy and is able to provide loans to LSPBM members in order to increase business, and it can develop and strengthen Joint Ventures LSPBM with SMEs in business and sharing cooperation for service and service coverage. It increases business capital with a savings pattern to get used to saving for members of the Joint Venture LSPBM. It also encourages LSPBM Assistance through institutions related in Donggala Regional Government for supervision and development of institutions, improvement of managerial human resources to be more optimal and professional.


2021 ◽  
Vol 10 (2) ◽  
pp. 259-274
Author(s):  
Masruri Muchtar

Retail sukuk is a sharia product offered to Indonesian citizens as a safe and profitable investment instrument. This study identified the strengths, weaknesses, opportunities, and threats that the government may face in offering retail sovereign sukuk. It aimed to provide the government the appropriate strategies based on the historical data of listed retail sukuk and its peripherals during 2009-2020. This paper used a qualitative research approach. The data collection techniques used were literature review and in-depth interview. Internal and external factors were identified. SWOT matrix was made prior to analysis. The results show that the coupon rate offered by retail sovereign sukuk is mostly higher than BI rate. Market expansion is needed. The government shall optimize all distribution partners. Newly innovated products should be developed. Certain criteria should be formulated to determine coupon rate. This research suggests that an independent Special Purpose Vehicle should be reconstructed as a separate entity.JEL Classification: E62, G23, G28, H63How to Cite:Muchtar, M. (2021). Opportunities and Challenges of Retail Sovereign Sukuk Issuance: Lessons from Twelve Years’ Experience. Signifikan: Jurnal Ilmu Ekonomi, 10(2), 259-274. https://doi.org/10.15408/sjie.v10i2.20093.


2016 ◽  
Vol 25 (2) ◽  
pp. 91
Author(s):  
Carlos José Espindola

O período compreendido entre 2003-2011 configura-se na economia brasileira como um ciclo de crescimento impulsionado por fatores internos e externos. Nesse ciclo merece destaque o dinamismo produtivo e comercial do agronegócio brasileiro e catarinense. Assim sendo, o objetivo geral deste texto é desvendar o desempenho do agronegócio catarinense, procurando identificar as múltiplas determinações responsáveis pela dinâmica recente dos agronegócios catarinense no território brasileiro e a sua consolidação no mercado internacional AbstractThe period between 2003 and 2011 represents a growing cycle driven by internal and external factors, in the Brazilian economy. In that period, it is worth highlighting the productive and commercial dynamism of the Brazilian and Catarinense agribusiness. Therefore, the text objective is to reveal the performance of Santa Catarina agribusiness, seeking to identify the multiple determinants responsible for recent dynamics of the Catarinense agribusiness, in the Brazilian territory, and its consolidation in the international market. 


Sign in / Sign up

Export Citation Format

Share Document