30 Years of Power Generation in Berlín Geothermal Field E1 Salvador: A Review of Field Development and Challenges Faced to Mantain Long-Term Production

Author(s):  
R. Renderos
Energies ◽  
2021 ◽  
Vol 14 (15) ◽  
pp. 4402
Author(s):  
Chun-Kai Wang ◽  
Chien-Ming Lee ◽  
Yue-Rong Hong ◽  
Kan Cheng

Energy transition has become a priority for adaptive policy and measures taken in response to climate change around the world. This is an opportunity and a challenge for the Taiwan government to establish a climate-resilient power generation mixed to ensure electricity security as well as climate change mitigation. This study adopted a sustainable development perspective and applied optimal control theory to establish a cost-effective model to evaluate a long-term (2050), climate-resilient power generation mix for Taiwan. Furthermore, this study applies the STIRPAT approach to predict the demand of electricity by 2050 for the demand side management. The results not only showed the share of various power generation mixed, but also recommended the trajectory of electricity saving by 2050.


2020 ◽  
pp. 57-60
Author(s):  
K.I. Mustafaev ◽  
◽  
◽  

The production of residual oil reserves in the fields being in a long-term exploitation is of current interest. The extraction of residual oil in such fields was cost-effective and simple technological process and is always hot topic for researchers. Oil wells become flooded in the course of time. The appearance of water shows in production wells in the field development and operation is basically negative occurrence and requires severe control. Namely for this reason, the studies were oriented, foremost, to the prevention of water shows in production well and the elimination of its complications as well. The paper discusses the ways of reflux efficiency increase during long-term exploitation and at the final stages of development to prevent the irrigation and water use in production wells.


Energies ◽  
2018 ◽  
Vol 11 (9) ◽  
pp. 2442 ◽  
Author(s):  
Jussi Ekström ◽  
Matti Koivisto ◽  
Ilkka Mellin ◽  
Robert Millar ◽  
Matti Lehtonen

In future power systems, a large share of the energy will be generated with wind power plants (WPPs) and other renewable energy sources. With the increasing wind power penetration, the variability of the net generation in the system increases. Consequently, it is imperative to be able to assess and model the behavior of the WPP generation in detail. This paper presents an improved methodology for the detailed statistical modeling of wind power generation from multiple new WPPs without measurement data. A vector autoregressive based methodology, which can be applied to long-term Monte Carlo simulations of existing and new WPPs, is proposed. The proposed model improves the performance of the existing methodology and can more accurately analyze the temporal correlation structure of aggregated wind generation at the system level. This enables the model to assess the impact of new WPPs on the wind power ramp rates in a power system. To evaluate the performance of the proposed methodology, it is verified against hourly wind speed measurements from six locations in Finland and the aggregated wind power generation from Finland in 2015. Furthermore, a case study analyzing the impact of the geographical distribution of WPPs on wind power ramps is included.


Energies ◽  
2021 ◽  
Vol 14 (23) ◽  
pp. 7843
Author(s):  
Przemysław Kaszyński ◽  
Aleksandra Komorowska ◽  
Krzysztof Zamasz ◽  
Grzegorz Kinelski ◽  
Jacek Kamiński

Capacity remuneration mechanisms operate in many European countries. In 2018, Poland implemented a centralized capacity market to ensure appropriate funding for the existing and new power generation units to improve long-term energy security. One of the declarations made while the mechanism was deployed was its beneficial influence on incentives for investments in new units. In this context, this paper aims to analyze the effects of the capacity mechanism adopted for investments in new power generation units that may be financed under the capacity market mechanism in Poland. The analysis is conducted for four types of capacity market units, the existing, refurbishing, planned, and demand-side response types, and includes the final results of capacity auctions. The results prove that the primary beneficiaries of the capacity market in Poland have been the existing units (including the refurbishing ones) responsible for more than 80% of capacity obligation volumes contracted for 2021–2025. Moreover, during the implementation of the capacity market in Poland, the planned units that signed long-term capacity contracts with a total share of 12% of the whole market were already at the advanced phases of construction, and the investment decisions were made long before the implementation of the capacity market mechanism. Therefore, they were not associated with the financial support from the capacity market. The study indicates that the capacity market did not bring incentives for investments in new power generation units in the investigated period.


Author(s):  
Avinash Nayak ◽  
Jonathan Ajo-Franklin ◽  

Abstract The intrinsic array nature of distributed acoustic sensing (DAS) makes it suitable for applying beamforming techniques commonly used in traditional seismometer arrays for enhancing weak and coherent seismic phases from distant seismic events. We test the capacity of a dark-fiber DAS array in the Sacramento basin, northern California, to detect small earthquakes at The Geysers geothermal field, at a distance of ∼100  km from the DAS array, using beamforming. We use a slowness range appropriate for ∼0.5–1.0  Hz surface waves that are well recorded by the DAS array. To take advantage of the large aperture, we divide the ∼20  km DAS cable into eight subarrays of aperture ∼1.5–2.0  km each, and apply beamforming independently to each subarray using phase-weighted stacking. The presence of subarrays of different orientations provides some sensitivity to back azimuth. We apply a short-term average/long-term average detector to the beam at each subarray. Simultaneous detections over multiple subarrays, evaluated using a voting scheme, are inferred to be caused by the same earthquake, whereas false detections caused by anthropogenic noise are expected to be localized to one or two subarrays. Analyzing 45 days of continuous DAS data, we were able to detect all earthquakes with M≥2.4, while missing most of the smaller magnitude earthquakes, with no false detections due to seismic noise. In comparison, a single broadband seismometer co-located with the DAS array was unable to detect any earthquake of M<2.4, many of which were detected successfully by the DAS array. The seismometer also experienced a large number of false detections caused by spatially localized noise. We demonstrate that DAS has significant potential for local and regional detection of small seismic events using beamforming. The ubiquitous presence of dark fiber provides opportunities to extend remote earthquake monitoring to sparsely instrumented and urban areas.


2021 ◽  
Author(s):  
Nasser AlAskari ◽  
Muhamad Zaki ◽  
Ahmed AlJanahi ◽  
Hamed AlGhadhban ◽  
Eyad Ali ◽  
...  

Abstract Objectives/Scope: The Magwa and Ostracod formations are tight and highly fractured carbonate reservoirs. At shallow depth (1600-1800 ft) and low stresses, wide, long and conductive propped fracture has proven to be the most effective stimulation technique for production enhancement. However, optimizing flow of the medium viscosity oil (17-27 API gravity) was a challenge both at initial phase (fracture fluid recovery and proppant flowback risks) and long-term (depletion, increasing water cut, emulsion tendency). Methods, Procedures, Process: Historically, due to shallow depth, low reservoir pressure and low GOR, the optimum artificial lift method for the wells completed in the Magwa and Ostracod reservoirs was always sucker-rod pumps (SRP) with more than 300 wells completed to date. In 2019 a pilot re-development project was initiated to unlock reservoir potential and enhance productivity by introducing a massive high-volume propped fracturing stimulation that increased production rates by several folds. Consequently, initial production rates and drawdown had to be modelled to ensure proppant pack stability. Long-term artificial lift (AL) design was optimized using developed workflow based on reservoir modelling, available post-fracturing well testing data and production history match. Results, Observations, Conclusions: Initial production results, in 16 vertical and slanted wells, were encouraging with an average 90 days production 4 to 8 times higher than of existing wells. However, the initial high gas volume and pressure is not favourable for SRP. In order to manage this, flexible AL approach was taken. Gas lift was preferred in the beginning and once the production falls below pre-defined PI and GOR, a conversion to SRP was done. Gas lift proved advantageous in handling solids such as residual proppant and in making sure that the well is free of solids before installing the pump. Continuous gas lift regime adjustments were taken to maximize drawdown. Periodical FBHP surveys were performed to calibrate the single well model for nodal analysis. However, there limitations were present in terms of maximizing the drawdown on one side and the high potential of forming GL induced emulsion on the other side. Horizontal wells with multi-stage fracturing are common field development method for such tight formations. However, in geological conditions of shallow and low temperature environment it represented a significant challenge to achieve fast and sufficient fracture fluid recovery by volume from multiple fractures without deteriorating the proppant pack stability. This paper outlines local solutions and a tailored workflow that were taken to optimize the production performance and give the brown field a second chance. Novel/Additive Information: Overcoming the different production challenges through AL is one of the keys to unlock the reservoir potential for full field re-development. The Magwa and Ostracod formations are unique for stimulation applications for shallow depth and range of reservoirs and fracture related uncertainties. An agile and flexible approach to AL allowed achieving the full technical potential of the wells and converted the project to a field development phase. The lessons learnt and resulting workflow demonstrate significant value in growing AL projects in tight and shallow formations globally.


Sign in / Sign up

Export Citation Format

Share Document