Managing Information for a Risk Based Approach to Stakeholder Management

Author(s):  
Franco Caron ◽  
Fulvio Salvatori

This paper proposes a risk based approach in order to obtain a quantitative estimate of the salience of the stakeholders involved in a project. The integration between stakeholders and risk management processes in the Project Management System allows us to realize a twofold objective: a quantitative estimate of the salience of each stakeholder in terms of the contribution to the overall project riskiness and an identification of the most effective responses as a function of the dynamics of the risks generated by each stakeholder. The proposed approach has been applied to an international project concerning the building of a pipe line.

Author(s):  
Franco Caron ◽  
Fulvio Salvatori

This paper proposes a risk based approach in order to obtain a quantitative estimate of the salience of the stakeholders involved in a project. The integration between stakeholders and risk management processes in the Project Management System allows us to realize a twofold objective: a quantitative estimate of the salience of each stakeholder in terms of the contribution to the overall project riskiness and an identification of the most effective responses as a function of the dynamics of the risks generated by each stakeholder. The proposed approach has been applied to an international project concerning the building of a pipe line.


Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.


2019 ◽  
Vol 1 (1) ◽  
pp. 234-239 ◽  
Author(s):  
Anna Kiełbus ◽  
Dariusz Karpisz

AbstractThe article presents the essence and significance of risk management processes in the project, as the key field for successful completion of the project, in the field of project management. Based on literature review, the methods and standards of risk management in the project as well as standards related to process safety were defined. The risk management process according to the PMBoK methodology was discussed as an example of an international project entitled 3DCentral – Catalyzing Smart Engineering and Rapid Prototyping.


2021 ◽  
Vol 7 (2) ◽  
pp. 428-435
Author(s):  
Natalia Valerievna Moskvicheva ◽  
Anna Anatolievna Burdina ◽  
Narmina Oktaevna Melik-Aslanova

Project management has received significant development in recent decades. The project approach to management is also applied in the field of communication, information technology, and research. The article analyzes the prerequisites for improving the modern theory and practice of project management. Problems and methods of project management in large industrial corporations are considered and the necessity of implementing an information management system designed to automate and maintain management processes. Authors identify the main prerequisites for implementing a corporate project management system: a sufficient level of the company development; limited financial and human resources; simplification of control over the activities of project managers.


2021 ◽  
Vol 2021 (4) ◽  
pp. 8-17
Author(s):  
Aleksey Bobryshev ◽  
Nelli Agafonova

The article reveals the impact of risks on the implementation of projects of various directions. The mechanism of identifying and managing risks in the project management system is considered in order to make effective management decisions and bring the actual indicators of time, resources and quality to the planned values. The paper uses the SWOT analysis method, which allows strategic planning based on the study of external and internal environment conditions, followed by the formation of four groups: strengths and weaknesses, opportunities and threats. As a result, of the conducted research, a project risk register was formed.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


Sign in / Sign up

Export Citation Format

Share Document