Optimization of Project Management Processes Using the A* Project Management System (AStarPM)

Author(s):  
Alexander Marbach ◽  
Christian Roschke ◽  
Rico Thomanek ◽  
Claudia Hösel ◽  
Marc Ritter
Author(s):  
Franco Caron ◽  
Fulvio Salvatori

This paper proposes a risk based approach in order to obtain a quantitative estimate of the salience of the stakeholders involved in a project. The integration between stakeholders and risk management processes in the Project Management System allows us to realize a twofold objective: a quantitative estimate of the salience of each stakeholder in terms of the contribution to the overall project riskiness and an identification of the most effective responses as a function of the dynamics of the risks generated by each stakeholder. The proposed approach has been applied to an international project concerning the building of a pipe line.


2021 ◽  
Vol 7 (2) ◽  
pp. 428-435
Author(s):  
Natalia Valerievna Moskvicheva ◽  
Anna Anatolievna Burdina ◽  
Narmina Oktaevna Melik-Aslanova

Project management has received significant development in recent decades. The project approach to management is also applied in the field of communication, information technology, and research. The article analyzes the prerequisites for improving the modern theory and practice of project management. Problems and methods of project management in large industrial corporations are considered and the necessity of implementing an information management system designed to automate and maintain management processes. Authors identify the main prerequisites for implementing a corporate project management system: a sufficient level of the company development; limited financial and human resources; simplification of control over the activities of project managers.


Author(s):  
Franco Caron ◽  
Fulvio Salvatori

This paper proposes a risk based approach in order to obtain a quantitative estimate of the salience of the stakeholders involved in a project. The integration between stakeholders and risk management processes in the Project Management System allows us to realize a twofold objective: a quantitative estimate of the salience of each stakeholder in terms of the contribution to the overall project riskiness and an identification of the most effective responses as a function of the dynamics of the risks generated by each stakeholder. The proposed approach has been applied to an international project concerning the building of a pipe line.


The international experience of integrating building information modeling (BIM) into project management system with innovation implementation accent has been revealed in this article. The events carried out on federal and regional levels concerning the President of Russia directive on building construction industry modernization and construction objects transferring to life cycle management by means of BIM were analyzed. The large company experience of implementing BIM was summarized with describing some examples in different cities and regions of our country and thus the main directions of this technology development were determined. The key points of BIM and project management system pairing and impacting an innovation choice witch determine the project economic efficiency in the integrated management system were shown. The main reports of "Building construction projects technology and management: new practices and prospects" conference by Moscow Trade and Commerce Chamber were reviewed in this direction and problems of the new investment and construction project management technology implementation were shown. The ways to solve these problems were disclosed by work examples of PAO "Sberbank", and successfully working in our country firms Bilfinger Tebodin - BIM design and Beiten Burkhard -jurisdiction support. Some economic efficiency questions of BIM implementation were disclosed in the report delivered by The Plekhanov University of Economics (project and program management base department of Capital Group). Management system suggestions, regarding BIM implementation in Moscow construction were given.


2020 ◽  
Vol 2 (7) ◽  
pp. 49-54
Author(s):  
E. G. ERLYGINA ◽  
◽  
I. I. SAVEL’EV ◽  

Project approach in enterprise management is an important aspect in the company s performance which allows maintaining the company's leadership position in its field of activity. In this regard, the corporate project management system is an effective tool for managing the company's activities. The paper presents a possible typology of organizational projects, defines the place of project management in the strategic process of the organization. The classification of projects by main areas of activity is given. The problems of the project management system are considered and measures are developed to eliminate counteractions when implementing a corporate project management system.


2015 ◽  
Vol 19 (2) ◽  
pp. 9-18
Author(s):  
Ahmed Oraby ◽  
Mohamed Mohamdeen ◽  
Hassan Hassan ◽  
Ibrahim Nosseir

Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.