A Case Study on the Verification of Passive Office Energy Performance Comparing Actual Energy Consumption to Simulation Result
The objective of this study is to verify energy performance of passive office building compared to existing building using computer simulation tool, EnergyPlus. S building was selected as a passive office building, which is the first passive office building in KOREA, and the building satisfy the passive house standard. The annual energy consumption data were compared to the heating and cooling load result of EnergyPlus, to verify simulation accuracy. The conditions of existing building were selected from Korean envelope standard and the categories of the conditions are the insulation thickness and glazing composition. As a result, the passive office showed 28% reduced energy consumption, compared to the existing building, with ordinary envelope under Korean building envelope standard.