Research on a Comprehensive Evaluation Method for Multidrop Overload Control

2013 ◽  
Vol 433-435 ◽  
pp. 1103-1108
Author(s):  
Yu Tian Zhou ◽  
Fei Tang ◽  
Jie Zhao ◽  
Song Jun Wang ◽  
Ya Jun Wang ◽  
...  

Power flow shift being one of the main reasons that cause a large-scale blackout of power system, it is important to get the power flow shift under control at the beginning of the failure. In view of multidrop overload which frequently occurs in power outage, a comprehensive evaluation method is proposed to control the power flow shift. This method synthetically considers the control nodes' ability to eliminate the overload of the transmission in combination with PCA in which nodes' sensitivity of branch is selected as the evaluation index, divides them into two types (nodes that increase the power output to branch and others that decrease the power output to branch) and then obtains the control nodes' operation sequence. Additionally, a reverse equal matching adjustment is used to realize the control over multidrop overload. Typical numerical example is used to verify the effectiveness of the comprehensive evaluation method.

2014 ◽  
Vol 638-640 ◽  
pp. 2446-2449 ◽  
Author(s):  
Bo Liu ◽  
Ju Qin Shen ◽  
Gao Yan Xu ◽  
Liang Tang ◽  
Zi Lin Xu ◽  
...  

With the aim to improve the controlling efficiency of engineering project, this essay probes into the comprehensive evaluation of controlling efficiency of engineering project and put forward scientific comprehensive evaluation method to provide support to reasonable comprehensive evaluation of controlling efficiency of engineering project. Complete comprehensive evaluation index system of controlling efficiency of engineering project is constructed from three aspects, i.e. implementation efficiency of construction objective, external coordination efficiency and professional qualification enhancement efficiency; based on matter-element analytical method, mathematic model that could evaluate controlling efficiency of engineering project comprehensively is constructed.


2012 ◽  
Vol 256-259 ◽  
pp. 2439-2443
Author(s):  
Bo Cui ◽  
Ning Liu ◽  
Chen Sheng Zhao

Construction progress and quality are two important objectives in the construction of high core rockfill dam. It is of great significance to evaluate their control effect comprehensively. In this paper, the progress and quality of high core rockfill dam construction management are the study objectives. in order to achieve the real-time control of coupling them, the comprehensive evaluation method for the quantitative analysis of their complex relationship is proposed. Based on the comprehensive analysis of the mechanisms of the influence related factors in the construction process, the comprehensive evaluation index system of the high core rockfill dam coupling construction progress and quality is designed ; the comprehensive evaluation index data acquisition process is analyzed; the comprehensive evaluation method for the high core rockfill dam filling unit is put forward. finally, a comprehensive evaluation of high core rockfill dam filling unit model based on TOPSIS is established. Engineering examples show that this method plays a guiding role in real-time control of coupling high core rockfill dam construction progress and quality.


2014 ◽  
Vol 919-921 ◽  
pp. 1451-1456 ◽  
Author(s):  
Qi Sheng Xu ◽  
Jian Gang Shi ◽  
Yong Gang Zhang

Infrastructure construction plays an important role in socio-economic development and urbanization level promotion. For the development of suburban infrastructure in Shanghai, the paper establishes the system of evaluation index and introduces the fuzzy comprehensive evaluation method. To make up for the insufficient of identification ability for determining the index weight by the AHP, the article uses the entropy method to make the results objective, scientific and reasonable.


2021 ◽  
Vol 256 ◽  
pp. 01027
Author(s):  
Youzhuo Zheng ◽  
Yu Fu ◽  
Xiaobing Xiao

To utilize the objective information of index data and consider the important role of subjective judgment in the evaluation of distribution automation equipment testing results, a comprehensive evaluation method based on AHP (Analytic Hierarchy Process) and CRITIC (CRiteria Importance Through Intercriteria Correlation) method is proposed. Firstly, an evaluation index system of distribution automation equipment testing results considering seven big indicators and thirty-six small indicators is established. Secondly, AHP and CRITIC method are adopted to solve a practical evaluation problem of distribution automation equipment testing results. The subjective weights of each evaluation index are calculated by AHP, the objective weights of each evaluation index are calculated by the CRITIC method. Then, to achieve the sorting of distribution automation equipment testing results accurately, the comprehensive weights are obtained by combining the two weights. Finally, the analysis and comparison of case studies show that the proposed evaluation index system can accurately reflect the performance of distribution automation equipment and the comprehensive evaluation method of distribution automation equipment testing results which comprehensively considers the subjective comprehensive evaluation results.


2014 ◽  
Vol 1073-1076 ◽  
pp. 2852-2856
Author(s):  
Zhi Jin Xu ◽  
Yan Kui Song

The implemented performance of enterprise’s patent strategy is an important component to measure its comprehensive benefits. It is of strategic significance for an enterprise to evaluate objectively its implemented performance of patent strategy. From the perspective of sustainable development, according to the 4 aspects of creation, application, protection and management of patent, the essay constitutes preliminarily a comprehensive evaluation index system of the implemented performance of enterprise’s patent strategy which is composed of a set of 21 indexes on the basis of an amount of domestic and foreign literature survey, case study and expert consultation, and analyzes the evaluation model and method of implemented performance of enterprise’s patent strategy with the fuzzy comprehensive evaluation and through a real case. The essay thinks the constitution of evaluation index system should obey a series of basic principles of objectivity, systematization, science and conciseness and the evaluation in essence is multi-object, multi-factor and multi-layer. Therefore, it is effective and feasible to select the Fuzzy Comprehensive Evaluation method.


2012 ◽  
Vol 253-255 ◽  
pp. 1593-1597 ◽  
Author(s):  
Jian Long Yan ◽  
Yong Cheng ◽  
An Hu Zhang ◽  
Yun Gang Zhao

Highway collapse hazard is the combined result of many factors. Based on the formation mechanism of the road collapse hazard and main the factors, they are selected from three aspects of risk assessments master factor: the regional geological structure, slope characteristics, and regional environmental characteristics, also ultimately select the spacing of the joints, slope lithology, slope structure, slope height, slope gradient, rainfall (rainfall in 24 hours to ≥ 25mm of days), the vegetation coverage degree and earthquake strong eight main control factors, above all these factors, they established a road collapse hazard evaluation index system. Based on the fuzzy comprehensive evaluation method, it establishes a road collapse hazard evaluation model. Analytic Hierarchy Process is used to determine the evaluation index system of layers in index weight values. Risk index is based on the evaluation criteria. Finally, an empirical study of two highway projects instances.


2013 ◽  
Vol 291-294 ◽  
pp. 2789-2793
Author(s):  
Jun Fang Xue ◽  
Ying Li Zhang ◽  
Xin Jian Zhang

In order to assess product’s disassembly sequences simply and effectively, we present the objective adaptive entropy way, which judge information according to the difference of the evaluation indexes, and get the importance of each evaluation index in the comprehensive assessment of the project (i.e. weight of indexes). So we in turn get the comprehensive evaluation method which is based on the product disassembly sequences of information entropy .This method offers the optimal result and provides the objective weight of each index. So that the designers can improve the relative devises and plan the resource of disassembly. Thereby we can get the best disassembly sequences. At last, taking the example of the 9 kinds of optimal disassembly sequence of a certain type air-condition’s outdoor, we can verify the availability of this method.


2011 ◽  
Vol 255-260 ◽  
pp. 1125-1129
Author(s):  
Da Wei Zheng ◽  
Li Xiao Qi

Guantifying the aseismatic factor of bridge and determining the factor domain,the weight and evaluation vector in different levels using the basic principle of fuzzy mathematics.Besides, the aseismatic performance of a large-scale bridge in Sichuan were studied and analysised by using the fuzzy comprehensive evaluation method.


2014 ◽  
Vol 1010-1012 ◽  
pp. 333-338
Author(s):  
Li Tuo Cui ◽  
Zhi Wei Li

Based on the comprehensive evaluation method, the evaluation index system, composed of port resources, tourism resources, fishery resources, space and other resources,was established to evaluate the influence of the intensive using the sea in Caofeidian area on marine resources.The evaluation standard about the influence of the intensive using the sea on marine resources was founded.The comprehensive influence of theintensive using the sea in Caofeidian area on marine resources was evaluated.The results showed that the intensive using the sea in Caofeidian has an certain effect on marine resources and the influence degree is still in the acceptable range.The sea in Caofeidian can be appropriately used for the intensive using the sea. But in comparison,the influence of the intensive using the sea in implementing process is greater than that after the completion of the intensive using the sea. There is difference in the infulence of intensive using the sea on marine resources.The infulence degree on fishery reources is the greatest and reaches unacceptable leve,follwed by the spatial resources.The influence on the port and channel resources and the tourism resources is smaller.


Sign in / Sign up

Export Citation Format

Share Document