Distribution of Underground Pressure Law and Fracture Zone Prediction Research of Overburden in Steep and Multiple Coal Seams Mining

2013 ◽  
Vol 448-453 ◽  
pp. 3888-3892
Author(s):  
Ke Min Wei ◽  
Mao Sen Zhao ◽  
Ze Kang Wen ◽  
You Ling Fang

Use Taiping coal mines second horizontal (+1100m~+900 m level ) 1#, 3# and 5# coal seam in Panzhihua Baoding as the research object, apply the problem solving nonlinear large deformation finite difference method (FLAC), to research the steep multi-seam mining of pressure distribution and characteristics of fracture zone. The results show that: (1)During the course of three coal mining extraction, the stress of goaf surrounding rocks will be changed. (2)When the nearby coal is mining, the coal pillar come into being stress concentration near the area. when the mining work continues, the goaf will have an effect on the protection pillar, which is similar to the "liberate". the effect of coal pillar and stress concentration nearby will be eased; (3)After the coal mining, plastic failure has occurred over the protection pillar, forming a water guide channel. Research results can be as a reference for similar steep seam mining.

2012 ◽  
Vol 204-208 ◽  
pp. 1395-1400
Author(s):  
Chuan Wei Zang ◽  
Chuan Le Ma ◽  
Xue An Zhuang

During the extraction of steeply inclined coal seams, the coal recovery ratio is low be-cause of the coal pillar loss and the production of waste rock is high due to lots of rock roadways which causes serious environmental pollution. This status is conflicted with the strategy of Clean Coal Mining and Green Coal Mining in China, so it is necessary to develop new coal mining method. In this paper, Downward Stratified Gangue Self-filling Method on the Flexible Shield (DSGSMFS) is put forward first. It means that the coal face is lain horizontally and advances along the dip; the flexible shield is used to separate the gob area; the waste rocks are self-filled downward to the top the shield; the coal is broken by drilling and blasting method under the shield, and the broken coal is transported by the electrical winch and the scraping mucker; the flexible shield moves downward automatically by the weight of itself and waste rocks. Field test shows that the strata displacement is effectively controlled by using DSGSMFS, so some coal pillars are recovered; as a result the problem of large quantity gangue and low coal recovery ratio in steep coal seam is solved. DSGSMFS is proved to be a new hopeful and effective coal green mining method.


2021 ◽  
Vol 2021 ◽  
pp. 1-17
Author(s):  
Qingwei Bu ◽  
Min Tu ◽  
Baojie Fu

Due to the change of ground stress environment caused by underground coal mining, the intense lateral mining stress concentration is formed around the stope; so section coal pillar is generally set up to bear the mining pressure, but the different sizes of coal pillars have obvious influence on the bearing capacity of those pillars and the characteristics of mining pressure. Mastering the mechanism characteristics by which coal pillars bearing capacity and mining stress distribution is crucial to identify the reasonable coal pillar size and give full play to the bearing role of section coal pillar, given their importance for the safety and bearing stability of engineering rock mass in underground coal mining. Therefore, the bearing characteristics of section coal pillar and the redistribution of mining stress are achieved with a mechanical model analysis on the basis of the analysis of coal pillar bearing and mining influence characteristics. Moreover, applying the elastic-plastic mechanics theory revealed the mechanical equations of the effective bearing size of coal pillar and redistribution of mining stress in longwall face. Combined with the analysis of a specific engineering example, the research results are as follows. During a roadway excavation, the continuous mining stress transfer occurs “stress redistribution” and the mechanical failure of bearing coal pillar consists of lateral mining and roadway side failures. The bearing coal pillar has two critical dimensions (i.e., the critical dimension W e of the self-bearing stability coal pillar and the critical dimension W p of failure through the coal pillar). The mechanical state of the lateral mining stress redistribution and bearing coal pillar is divided into the three situations: ① when the width of coal pillar W  <  W p , only one stress concentration area exists, the bearing capacity of the coal pillar is invalid at this stage, and the lateral mining stress concentration transfers to the roadway solid coal side; ② when the width of the coal pillar W e  ≥  W  ≥  W p , two stress concentration areas appear at this stage, and the coal pillar is in the critical state of self-bearing stability; ③ when the width of the coal pillar W  >  W e , three stress concentration areas are present, and the coal pillar at this stage is in a self-bearing stable state. Among all these factors, only the size of coal pillar is completely controllable, so the aspects of safe bearing and reserved size design of coal pillar, after estimating the critical size of coal pillar, the coal pillar size design is carried out according to the mine pressure control needs of mining engineering, and the cohesion, internal friction angle, interlayer friction coefficient, and coal seam mining height are improved by artificial technology, so as to realize the resource safe and efficient mining of all kinds of coal seam mining conditions; in the calculation of wide coal pillar size, the advance mining stress concentration at the end of the self-working face should be taken as the mining load condition, and the reserved size meets the condition of W  >  W e , thereby ensuring the stable bearing of the wide coal pillar despite the advanced mining stress concentration during the self-working face mining; in the calculation of narrow coal pillar size, the lateral mining stress concentration before mining should be taken as the mining load condition and the reserved size meets the condition W  <  W p , thereby realizing the effective transfer of mining stress concentration to the roadway solid coal side.


2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Dequan Sun ◽  
Xiaoyan Li ◽  
Zhijie Zhu ◽  
Yang Li ◽  
Fang Cui

The height of the fractured zone caused by coal mining is extremely significant for safely mining under water, water conservation, and gas treatment. At present, the common prediction methods of overburden fractured zone height are only applicable to thin and medium-thick coal seams, not suitable for thick and extra-thick coal seams. In order to determine the overburden fractured zone distribution characteristics of extra-thick seam mining, failure process analysis method of overlying strata was proposed based on key strata theory. This method was applied to 15 m coal seam of Tongxin coal mine, and fractured zone height was determined to be 174 m for 8100 panel. EH4 electromagnetic image system and borehole televiewer survey were also conducted to verify the theory results. The distribution of the electrical conductivity showed that the failure height was 150–170 m. Observation through the borehole televiewer showed that the fractured zone height was 171 m. The results of the two field test methods showed that the fractured zone height was 150–171 m, and it was consistent with the theory calculation results. Therefore, this failure process analysis method of overlying strata can be safely used for other coal mines.


2019 ◽  
Vol 23 (Suppl. 3) ◽  
pp. 907-915
Author(s):  
Jianguo Zhang ◽  
Man Wang ◽  
Yingwei Wang

As coal mining gradually extends deeper, coal seams in China generally show high stress, high gas pressure and low permeability, bringing more difficulty to coal mining. Therefore, in order to strengthen gas extraction, it is necessary to carry out reservoir reconstruction after deep coal seams reached. In this paper, the distribution and evolution laws of fracture zone overlaying strata of J15 seam in Pingdingshan No. 10 coal mine after excavation were studied by combining similar simulation and numerical simulation, meanwhile, the gas transport law within fracture zone was numerically simulated. The results show that the fracture zone reaches a maximum of 350 mm in the vertical direction and is 75 mm away from W9,10 coal seams in vertical distance. Since W9,10 coal seams are in an area greatly affected by the bending zone of J15 coal seam under the influence of mining, the mining of J15 coal seam will exert a strong permeability enhancement effect on W9,10 coal seams. The J15 coal seam can act as a long-distance protective layer of W9,10 coal seams to eliminate the outburst danger of the long-distance coal seams in bending zone with coal and gas outburst danger, thereby achiev?ing safe, productive and efficient integrated mining of coal and gas resources. The gas flux of mining-induced fractures in the trapezoidal stage of mining-induced fracture field is far greater than that in the overlaying stratum matrix. The horizontal separation fractures and vertical broken fractures within the mining-induced fracture field act as passages for gas-flow. Compared with gas transport in the overlaying stratum matrix, the horizontal separation fractures and vertical broken fractures within the mining-induced fracture field play a role in guiding gas-flow. The research results can provide theoretical support for the arrangement of high-level gas extraction boreholes in roof fracture zones.


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
YingJie Liu ◽  
Qingjie Qi ◽  
Anhu Wang

The absence of a key stratum during overburden rock movement is crucial to the mining pressure of fully mechanized coal mining faces. Using physical and numerical simulations, the 21304 mechanized mining in Daliuta and Huojitu coal mining faces 1−2 appeared twice during a pressure frame accident analysis. The results indicate that a lack of key overlying strata is crucial to the mining of lower coal seams, particularly for the upper sections of a single key stratum of coal. When the key stratum of the upper coal seam is absent, a stable masonry structure is formed after mining. It is easy to form stable stacked strata at the bottom of a coal seam. When developing gullies in deep terrains, the formation of the key stratum will be an upper rock fracture affected by the impact, resulting in a partial absence of the key stratum. When the key stratum is absent, the mining of upslope working faces and the probability of dynamic strata pressure increase with the overburden on the working face and mining of downslope faces. The face mine pressure development laws on the upper and lower coal seam mining were similar, mainly manifesting as “slope section >valley bottom section >back slope section.”


2012 ◽  
Vol 616-618 ◽  
pp. 402-405 ◽  
Author(s):  
Hong Chun Xia ◽  
Guo Sheng Gao ◽  
Bin Yu

According to the specific geological conditions in themulti-layer worked-out areas of Yongding coal seam, by the methods of integration of theoretic analysis, numerical value calculation and so on, we studied movement law of Overlaying Strata and influence of coal pillar in Coal seam mining, obtained the basic law of the overlying strata movement in multiplayer, provides a theoretical basis for the safe and efficient exploitation of the success of multiplayer. Many mining area in China is mining of closed distance coal seam group, By the impact of coal seam in the overlying, face and the tunnel roof structure will be different injury in sub-coal seam mining, Roof structure has changed greatly, even damage and easily take the roof leakage, When the the goaf communication with the overlying coal seams, caused by the induced secondary disasters such as face air leakage, Therefore, exploitation of the law of motion of the overlying strata in the multiplayer is a pressing problem. Exploitation multiplayer seam few theoretical and technical foundation at home and abroad, affecting the validity of the mining, rationality. although a lot of research on theory and technology of coal mining over the years[1~5], But it was not able to an overall comprehensive analysis of upper goaf adjacent goaf and overlying the coal pillar and present mining face, create a dynamic structural mechanics model, which is likely to cause the occurrence of disasters.


2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Zhiyuan Jin ◽  
Tao Peng

In Northwest China, rainfall is low, water resources are scarce, and the ecological environment is fragile. For shallow-buried and close-spaced coal seams with a thickness of upper coal bed >60∼70 m, the water-conducting fissures of the overlying rock will not penetrate the water-isolating layer after the upper coal seam is mined; the internal and external gap angles of the water-conducting fissures are not generated from the water-isolating layer. We set out to explore the critical internal and external dislocations for the second significant development of water-conducting fissures in the overlying rock after coal mining under control. A calculation model for the critical internal and external staggered distances of coal mining face in shallow-buried and close-spaced coal seams is established, the calculation formula is given, and the calculation formula for the critical seam mining ratio under the condition of internal staggered mining mode is given. Numerical simulation performed by UDEC methods: taking the overburden strata in the shallow-buried and close-spaced coal seam mining area of Shigetai Coal Mine as a prototype, it was verified that the critical internal and external offsets of the coal mining face in shallow-buried and close-spaced coal seams have a significant effect on the overlying water flow cracks in the mining of the lower coal seam. For the feasibility of developmental control, according to the engineering geological conditions of Shigetai, through the calculation method of external staggered distance, it is concluded that the distance of the open cut of the lower coal face and the upper coal face is only 21∼27 m, which is much smaller than the water barrier. It does not produce the critical distance of the water-conducting cracks. Therefore, in the process of mining the lower coal seam, the water-proof layer will produce water-conducting cracks, lose its water-proof performance, and cause water loss. This is also the cause of the water inrush accident in Shigetai Coal Mine.


2020 ◽  
Vol 2020 ◽  
pp. 1-14
Author(s):  
Zhiqiang Wang ◽  
Peng Wang ◽  
Lei Shi ◽  
Wenyu Lv ◽  
Chao Wu ◽  
...  

Gob-side entry is an area where it is difficult to prevent and control the frequent occurrence of rock burst. Based on “Longwall Mining with Split-level Gateways” (LMSG), this paper puts forward the technology of preventing rock burst by a new gob-side entry (NCPG). The abutment pressure distribution of LMSG shows that the stress peak of solid coal is lower than the conventional panel, and the width of the limit equilibrium zone is also reduced by a small percentage. After the narrow coal pillar gob-side entry has been excavated, the peak stress in solid coal increases, and the width of the limit equilibrium zone decreases, so the practical stress concentration increases. However, the NCPG located in areas of lower stress. The peak stress in solid coal of the NCPG does not increase, but the width of the limit equilibrium zone increases, so the practical stress concentration decreases. NCPC makes the concentrated stress transfer into the deep coal body and plays the role of pressure avoidance. Compared with the narrow coal pillar gob-side entry, the NCPG reduces the energy stored in coal and rock masses and increases the energy consumption. It has significantly improved the regionality, initiative, safety, and timeliness of rock burst prevention in deep high-stress coal seam mining.


Symmetry ◽  
2020 ◽  
Vol 12 (9) ◽  
pp. 1428
Author(s):  
Zhenyue Shi ◽  
Qingbiao Wang ◽  
Pu Wang ◽  
Donglin He ◽  
Yun Bai ◽  
...  

The surface subsidence caused by coal mining is a large area, and computer simulation is a fast and intuitive method, which can help us understand the macroscopic subsidence law. The mined-out area left over by coal mining is not disposed of appropriately for a long time. Thus, it can easily cause ground subsidence, collapse, or spot cracking, especially when mining multiple coal seams, which seriously restricts the construction and safety of the near-surface rock and soil layers. Based on the engineering background of five-layer coal mining in the Beibu Coal Mine of Laiwu City, a “Fast Lagrangian Analysis of Continua in 3D” numerical calculation model was established. The model was used to analyze the surface deformation indexes of four groups with different mining sequences in multiple coal seams, revealing the sequence effects of mining time on the surface deformation law in the goaf collapse areas, hence obtaining optimal mining sequences. The results showed that the four groups of mining sequences (including vertical settlement and horizontal deformation) have stable surface deformation centers, but the deformation ranges and amounts are quite different. The settlement deformation is the main difference. Mining sequence I has the largest deformation of 62.7 cm, followed by mining sequence III. Mining sequences II and IV are basically the same, at only 22% of the value of mining sequence 1. A multi-index analysis of the surface deformation curve including the inflection point, stagnation point, and slope showed that the larger the surface deformation, the more evident the change of the curve (concave or convex) and slope, the more uneven the foundation stress, the more severe the damage to the surface structures, and the less suitable the surface construction. Finally, upon analyzing the indicators of surface stability and adaptability, mining sequence IV was indicated as the optimal scheme. It is suggested that an optimal mining sequence should be appropriately selected before the mining of multiple coal seams. The research results can provide effective guidance for addressing surface deformations under similar geological conditions, and can provide scientific evaluations for the safety and stability of surface buildings and structures, leading to considerable economic and social benefits.


2014 ◽  
Vol 543-547 ◽  
pp. 3967-3973
Author(s):  
Bao Shan Han

There are abundant CBM (Coalbed Methane) in China. These CBM has caused a remarkable problem to the coal-mining in China. In order to improve the structure of Chinese energy and eliminate the risk of coal mine gas, the relevant industries and sections have implemented many explorations in CBM enriched areas. With great achievements, there are many important problems in the actions of CBM exploitation. The disadvantageous interaction of the surface CBM well and the later coal mining has been ignored at all. There are many disadvantages and defects. To solve these problems and eliminate or weaken the disadvantageous, the scientific and reasonable design of surface CBM well location is an important step. With the thinking of surface condition, coal mining plan, the arrangement of coal mine laneway, the direction and scale of the in-situ stress, and thinking more about the negative influence to and of surface CBM well, according to the theories of mining dynamics, mining engineering, mining geomechanics, and the CBM engineering, the design theory of the surface CBM well net can be studied. Finally, the arrangement principle of CBM product well in coal field is presented. The existing or future coal pillar will be a critical location for the surface CBM well location.


Sign in / Sign up

Export Citation Format

Share Document