The Risk Management of Reducing Merger and Acquisitions Risks for Construction Enterprise

2014 ◽  
Vol 584-586 ◽  
pp. 2359-2362
Author(s):  
Fang Jing Ma

In order to study the Merger and Acquisition (M&A) risk management for construction enterprise with the Hierarchical Holographic Modeling (HHM) is used to identify potential risks during different phases of M&A. In addition, Risk Filtering, Ranking and Management, which is short for RFRM, can also be used as a tool of risk level assessment to find more effective risks and find the suitable solutions. If M&A is used to identify the potential risks and analyze the risk factors of construction enterprises, they can be very helpful for finding out the solutions for the potential risk factors. At the same time it is useful for managing the M&A project potential risks and implementing well to increase the successful rate.

Author(s):  
FM Saty ◽  
A Fitri

This paper aims to analysis of potential risks in terms of capital, production, and marketing aspects at the SMEs center for salted fish manufacturing in Lampung. This research location was Pulau Pasaran Kota Karang, Teluk Betung, Bandar Lampung. The data was collected using questionnaires then processed. The research method is conducted by classifying the potential risk of SMEs, rating and predicate potential risk factors for MSMEs and establish a composite rating of potential risks of MSMEs. Based on 3 aspects of research, there is MSMEs no high and medium risk potency that is in capital aspect. Based on the production rating of the potential risks of MSMEs there are 7 MSMEs that have low risk potential, and 12 MSMEs have medium risk potential. Marketing aspect, there are 13 MSMEs with low risk potential and only 6 MSMEs with medium risk potential.


2021 ◽  
Vol 5 (6) ◽  
pp. 10-23
Author(s):  
Hongyun Tian

This paper mainly starts from the perspectives of management and economics, combined with the characteristics of the construction industry, conducts qualitative and quantitative analysis of the risks involved, studies various factors that cause construction enterprise risks from multiple angles, and uses scientific and effective methods to identify and evaluate risks, as well as determine the risk level. Through the overall risk management response strategies and empirical research of construction enterprises, this paper analyzes the general theory and main avoidance strategies of risk response of construction enterprises, and lays the foundation for follow-up risk management response in the form of cases through the implementation of technical route and innovation points.


2012 ◽  
Vol 178-181 ◽  
pp. 2788-2792 ◽  
Author(s):  
Hao Zhang

Meteorological disasters have a negative influence on highway safety operations. In order to efficiently enhancing emergency response capabilities for prevention of meteorological disasters and to carry out study of the ranking of risk factors about meteorological disasters, fuzzy mathematical method (expertise method) was applied to estimate the two indexes of risk factors of meteorological disasters in freeway normal operation: probability of risk factors and losses value of risk factors. Risk matrix method was used to analyze qualitatively and quantitatively the potential risk factors of meteorological disasters. By analyzing the potential risk factors of meteorological disasters in the normal operational process of a freeway in south China, it came to that risk level of typhoon was divided into four levers, dense fog and heavy rain were three, thunderstorms and heat were two. The result was consistent with the actual thing, and it provided a good analytic basis for follow-up emergency strategic planning.


1990 ◽  
Vol 63 (01) ◽  
pp. 013-015 ◽  
Author(s):  
E J Johnson ◽  
C R M Prentice ◽  
L A Parapia

SummaryAntithrombin III (ATIII) deficiency is one of the few known abnormalities of the coagulation system known to predispose to venous thromboembolism but its relation to arterial disease is not established. We describe two related patients with this disorder, both of whom suffered arterial thrombotic events, at an early age. Both patients had other potential risk factors, though these would normally be considered unlikely to lead to such catastrophic events at such an age. Thrombosis due to ATIII deficiency is potentially preventable, and this diagnosis should be sought more frequently in patients with arterial thromboembolism, particularly if occurring at a young age. In addition, in patients with known ATIII deficiency, other risk factors for arterial disease should be eliminated, if possible. In particular, these patients should be counselled against smoking.


Author(s):  
Syahrun Neizam Mohd Dzulkifli ◽  
◽  
Abd Halid Abdullah ◽  
Yee Yong Lee ◽  
Mohd Mahathir Suhaimi Shamsuri ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document