Status Analysis on Construction and Operational Effectiveness of Municipal Wastewater Treatment Plants in Guangxi
2014 ◽
Vol 587-589
◽
pp. 808-811
Keyword(s):
In “Eleventh Five-Year” period, Guangxi has vigorously promoted the construction of municipal wastewater treatment plants. The statistics about construction scale shows that most of sewage treatment plants are small-scale. The main processes adopted in the plants are Oxidation ditch(OD), A²/O and SBR and its improved processes. The loading rate is generally low. COD and BOD removal effect are 78% and 87%. In scale of below 2×104m³/d, 2-5×104m³/d,5-10×104m³/d and more than 10×104m³/d, the costs of Diatomite, Oxidation ditch(OD), Oxidation ditch(OD), A²/O processes are relatively provincial, respectively. Meanwhile, the running costs of sewage treatment plants are mainly affected by the scale of construction and loading rate.
2018 ◽
Vol 154
◽
pp. 162-170
◽
2013 ◽
Vol 12
(1)
◽
pp. 163-166
◽
2013 ◽
Vol 12
(7)
◽
pp. 1367-1373
2003 ◽
Vol 3
(5-6)
◽
pp. 321-327
◽
2020 ◽
Vol 396
◽
pp. 125327
◽