Mechanism Research about Impact of Transmission Channel Power Constraint on Grid Loss with Large-Scale Wind Power Integration

2014 ◽  
Vol 1070-1072 ◽  
pp. 919-922
Author(s):  
Peng Xia ◽  
Wen Ying Liu ◽  
Fu Chao Liu ◽  
Xi Wei Fu

With the significant development of wind power, it has been inevitable for wind farm cluster to integrate into the system from the grid end, therefore, the power grid loss problem of large-scale wind power integration is highlighted. At first, we construct a power transmission system model with large-scale wind power integration, get the power grid loss calculation formula of the system, and induce the change laws of the power grid loss by the constraints of power transmission channel flow. And then, based on the structure of Gansu power grid, we do some simulations about power grid loss distribution by the constraints of power transmission channel flow, and verify the correctness of theoretical derivation.

2014 ◽  
Vol 1070-1072 ◽  
pp. 183-186
Author(s):  
Hui Yong Li ◽  
Wen Ying Liu ◽  
Jing Jing Zheng ◽  
An Qi Liang ◽  
Pei Dong Du ◽  
...  

Large-scale wind power integration will increase the transmission channel flow and the network loss. Use of high-energy load to participate in wind power accommodation, will have a considerable impact on the network loss. This paper proposes several mathematical models in which high-energy load access power grid in different voltage levels and does a detailed analysis of the mechanism of high-energy load’s participation in the wind accommodation by layer. Based on that, combined with the actual structure of Hexi grid, the software PSASP is adopted to do detailed simulation analysis, so as to verify the correctness of the theoretical derivation.


2014 ◽  
Vol 672-674 ◽  
pp. 255-261
Author(s):  
Zhi Jian Liu ◽  
Zi Qi Zhao ◽  
Bo Li

As an increasing proportion of wind power in power grid, reactive power problem has become the most important problems in wind power integration. But as a result of wind power is a kind of intermittent energy sources, and put it into use in a large scale only just beginning. Many urgent problems which affect on system stability need to be resolved, such as voltage stability, reactive power compensation. This paper discussed the problems which around the reactive power compensation and angle stability issues while wind power integration. The reactive power compensation device named STATCOM instead of traditional capacitance. Establish the mathematical model of the Doubly-Fed Induction Generator (DFIG) and Static Synchronous Compensator (STATCOM) [3]. In order to meet the wind farm can transport reactive power quickly and continuously after fault. Establish the control strategy of DFIG combined with STATCOM [1]. Using the software MATLAB to simulate the wind power grid model and control system, verifies the rightness and effectiveness of model and STATCOM reactive power compensation effect for wind power integration.


2014 ◽  
Vol 953-954 ◽  
pp. 533-536
Author(s):  
Guang Lei Li ◽  
Xin Shi ◽  
Chun Xu Zhang ◽  
Hua Deng ◽  
Xian Zhen Zeng

At present, distributed wind is in its infancy, so engineering practice and related technology research and development is relatively lacking. The aging problem parallel operation between wind power and power grid enterprises is the issue that the whole world should be confronted with. This paper study the influence of wind power access to power grid operation, reveal the interactive mechanism of distributed wind power and power grid, formulate the corresponding technical specification and achieve the centralized control of distributed wind power. These can be used to guide the large-scale development of distributed wind power, which makes the development of distributed wind power guided by resource type guide transition to the grid type.


2014 ◽  
Vol 953-954 ◽  
pp. 380-383
Author(s):  
Kun Peng Shi ◽  
Wei Zhao ◽  
Ji Yue Fu ◽  
Guo Ying Fan ◽  
Ting Li

In this paper, the security and consumption problems of large-scale wind power integration to electric grid are briefly introduced, focusing on serious events that many installations went off the grid, failing to “ride through fault” (RTF), which happened successively since 2011. Then the mechanisms of coordinated development between wind power and electric grid are discussed, and suggestions on management & technical measures are proposed to realize a great friendly wind farm which can be developed in a scientific, healthy and sustainable manner.


2020 ◽  
Author(s):  
Shutang You

Due to a series of supporting policies in recent years, China wind power has developed rapidly through a large-scale and centralized mode. This paper analyzes the two major concerns faced by China’s wind power development: wind generation reliability and wind energy balancing. More specifically, wind farm tripping-off-grid incidents and wind power curtailment issues, which caused huge economical loss, are investigated in details. Based on operation experience of large wind power bases, technical recommendations and economic incentives are proposed to improve wind power integration and power grid reliability. As a summary and outlook of wind power development in China, this paper provides a reference on future wind power development for other countries.


2014 ◽  
Vol 672-674 ◽  
pp. 361-366
Author(s):  
Ya Di Luo ◽  
Jing Li ◽  
Zi Ming Guo ◽  
Gui Rong Shi ◽  
Dong Sheng Wang ◽  
...  

According to the characteristics of the wind farm measuration and the impact of bad data on the state estimation, this paper introduces the reference value of measurement type and the bad data reference factor into the weight function, and then presents the calculation method of state estimation method for solving residual contamination problem caused by large-scale wind power integration. In order to improve the software computing speed and the data section real-time performance of robust state estimation, using parallel algorithms to do Givens transformation. Finally, the simulation tests of a regional power grid to prove that the proposed method can effectively identify telemetry bad data of wind farms eliminate residual pollution caused by it, which improve the speed and accuracy of the State Estimation.


2013 ◽  
Vol 380-384 ◽  
pp. 2994-2998
Author(s):  
Xiang Yu Lv ◽  
Xue Fei Chang ◽  
De Xin Li ◽  
Ye Yuan

Owing to the fluctuating and the randomness of wind speed, the influences of large-scale wind power integration on the grid should not be ignored. The output fluctuation of wind farm has serious effect on power quality, causing the problems like voltage flicker and harmonic, it will pose a threat on the safe and stable operation of power grid. This paper mainly analyzed the influence mechanism of wind power integration on power quality and studied the detection method of power quality. The effectiveness of the proposed method was verified by the simulation of real operation data of a wind farm in Jilin Province. The method presented in this paper will provide a reference for the establishment of Chinas wind power testing system and has important engineering significance.


2013 ◽  
Vol 860-863 ◽  
pp. 414-418
Author(s):  
Yan Qing Li ◽  
Hao Shan Li ◽  
Chi Dong ◽  
Jian Wang

Large-scale wind power integration constituted great challenges for the power system operation and dispatching, due to the volatile and peak-reversal nature of wind power.The multi-objective optimization model of the wind farm combined with pumped-storage was studied to solve the problem.An optimization model for wind-storage combined operation was established, aiming at tracking load changes ,improving wind power economic benefits and peak shaving benefits, using improved multi-objective particle swarm optimization.The optimization calculation attempted to reduce volatility of the remaining load after removal of wind-storage joint output and increase economic benefits of wind farrms. Through the optimization calculation the wind farm and storage plant scheduling values of each time are available. The calculation example shows that the model and method are conducive to large-scale wind power integration and have a certain practicality and effectiveness.


2012 ◽  
Vol 608-609 ◽  
pp. 569-572 ◽  
Author(s):  
Xi Chao Zhou ◽  
Fu Chao Liu ◽  
Jing Jing Zheng

In recent years, wind power penetration into the grid has increased rapidly with abundant wind resources in Jiuquan, according to the policy of the Chinese government to “establish a ‘Hexi Wind Power Corridor’ and rebuild another Western ‘Terrestrial Three Gorges Dam’”. By the end of 2010, the total installed capacity of wind power in Jiuquan has reached 5160 MW. The wind farms are connected to 110 kV transmission network or above in Jiuquan, the studies of their impacts on the grid, in particular, the grid operation are becoming serious and urgent. Jiuquan is far away from the load center with a weak grid configuration, therefore issues such as transmission line overloading, local grid voltage fluctuation, and transient stability limitation are looming with large scale wind power integration. The power system dispatch and operation are influenced by the intermittent nature of the wind power, which should be regulated by the system reserves. This paper discusses the recent integration of wind power into the grid with a focus on the impact on the Gansu power grid operation. The paper also presents the measures to deal with these issues.


Sign in / Sign up

Export Citation Format

Share Document