Mid-Term Stability Assessment of Jiangxi Power Grid

2013 ◽  
Vol 732-733 ◽  
pp. 882-887
Author(s):  
Yong Chun Su ◽  
Hao Wei Jia

Mid-term stability assessment is an important work to support power system operation in a province power grid of China every year. The stability assessment method and process was introduced in this paper. As an example, the stability of Jiangxi province power system was evaluated in the following two years. Weak area and weak transmission line were found out in each power supply area. Prevention and control measures were proposed. According to problems among the assessment process and using the state monitoring data, an approach was discussed to increase the assessment result accuracy. The analysis conclusion provides the reference to the safe and stable operation of Jiangxi power system.

2013 ◽  
Vol 341-342 ◽  
pp. 1374-1379
Author(s):  
Yang Liu ◽  
Zhen An Zhang ◽  
Wei Liu ◽  
Ya Nan Wang

With different element models and parameters in power system, the transient stability analysis results are also different, especially the model of generator and load. Based on the actual parameters of Hunan power grid, this paper builds the synthesis load model of the distribution network with small hydropower considered, and then the Hunan simulation network can also be got. Using PSASP, analyses the transient stability of Hunan power system with distributed small hydropower under different operation modes systematically and comprehensively. Through an overall check of the stability level in each Hunan area, and then compared with the analysis results of Hunan power grid based on the currently used load model , the influences of the distributed small hydropower on the safe and stable operation of the large power network are summarized.


Author(s):  
Yu Cai ◽  
Wei Li ◽  
Bao Zhang ◽  
Wenjian Wu ◽  
Deren Sheng ◽  
...  

Fast valving of ultra-supercritical unit has great effects on over-speed prevention, load-shedding control, transient stability analysis of electrical system and other security problems. The purpose of fast valving is to maintain the stability of power system once fault or load shedding of unit occurs in the electric power system. Therefore, it is of great significance to study the reliability of fast valving for ultra-supercritical unit. In this paper, the KU ( short shedding) logic condition of SIEMENS T3000 system is analyzed as the research object of fast valving. The unit can be avoided over speed by monitoring the unit load and fast valving under faulty grid conditions based on the KU control. A series of measures will be taken after KU is triggered, for instance the governing valving will be closed quickly and the DEH (digital electro-hydraulic) control of the steam turbine will be switched to speeding control mode. On the other hand, the unit will return to normal operation if the transient fault of power grid disappears. The key contributions of this thesis include three parts: Firstly, based on the analysis of control characteristics of ultra-supercritical unit and protective logic and triggered conditions of KU function, a novel dynamic model by coupling the fast valving of steam turbine and the transient stability of generator is established by applying the PSCAD software. Then, the dynamic response process of ultra-supercritical unit is simulated and calculated by adopting the coupling dynamic model when KU function is triggered. Also the influence factors and reliability of fast valving are analyzed under transient fault conditions. Finally, two optimized measures by increasing the time delay and the speed of quantitative judgment are put forward to reduce risks and avoid the misoperation of signal distortion which may be caused by the power transmitter under transient fault conditions. The results of this study can not only help to evaluate the reliability of fast valving function scientifically in power grid transient fault, but also guide the technicians to analyze the stability of the power grid.


2014 ◽  
Vol 960-961 ◽  
pp. 1588-1591
Author(s):  
Xiang Dong Zhao ◽  
Xin Zhao ◽  
Ming Jun Lv ◽  
Jian Guo Liu ◽  
Feng Zhen Liu ◽  
...  

The Internet and the gradual implementation of the continuous power grid market in recent years make the power system more complex under different operating environment. Safe and stable operation of power grids have become increasingly important . With the rapidf development of the grid and constant innovation, safe and stable operation also has a new requirement , because the rapid development of the power system brings more This paper analyzes the causes of blackouts and reviews security of the power system stability problems related to measures on the security and stability of the power system operation .


2014 ◽  
Vol 950 ◽  
pp. 314-320 ◽  
Author(s):  
Jun Jia ◽  
Xin Xin Hu ◽  
Ping Ping Han ◽  
Yan Ping Hu

With the scale of wind farm continuously increasing, when grid fault, the influences of the wind turbines connected to the grid on the stability of the power grid can never be ignored. Therefore, there are higher standards of the wind turbines’ abilities of fault ride-through (FRT) and producing reactive power. This paper studies the direct-drive wind power system, and the main point is the fault ride-through (FRT) of the permanent magnetic synchronous generator (PMSG) with Chopper. By establishing the dynamic model of PMSG under the environment of DigSILENT, this paper simulates the fault ride-through (FRT) of the direct-drive wind power system connecting into power grid. During the research, we focus on the stability of voltage about the Chopper to the DC bus under faults. What’s more, in this paper, we analysis the data about how the Chopper help the DC bus to improve its stability. The simulation results show that: when there is a fault on the point of common coupling, the permanent magnetic synchronous generator has the capability of fault ride-through (FRT). Especially when there is a voltage dip on the grid side, the permanent magnetic synchronous generator could produce reactive power for power grid, effectively preventing the system voltage from declining seriously, so as to improve the system stability under faults.


2013 ◽  
Vol 446-447 ◽  
pp. 853-857
Author(s):  
Qian Jin Wu ◽  
Xue Zhi Wang

Commutation Failure is the common fault of HVDC, continuous commutation failure may lead to HVDC block and affect the stability of the power system. Especially in southern power grid, china, its special that the end of four HVDC system are all in Guangzhou. If the AC system occurs serious fault, all of the HVDC system may occur commutation Failure, HVDC block, even occurs large area blackout. So how to avoid continuous commutation failure and restore the stability of HVDC is important for AC and DC parallel power system. This paper based on the mechanism of commutation failure, analyze the reason of commutation failure and identification method, preventive measures. At last, this paper uses actual recorded wave to analyze the diversification of system after commutation failure.


2021 ◽  
Vol 2087 (1) ◽  
pp. 012083
Author(s):  
FengKai Lin ◽  
YanRong Li ◽  
YaWei Liu ◽  
LingXiao Chen

Abstract As a large, complex system with wide distribution and high real-time, the safe, stable and reliable operation of the power system is inseparable from the power automation system. In this paper, an in-depth study is conducted on the key issues of this solution in the process of software cross-platform integration around the EPRI graphic center method, combined with the power data interface standard. The dispatch center graphics system and the dispatch center power graphics application method are discussed in detail in the paper. In addition, the paper also explains the online calibration system for relay protection ratings with smart grid dispatching technology support system. The methods and sample systems in this paper have been practically applied in large scale power grid dispatching centers, providing a reliable guarantee for the safe and stable operation of the power grid.


Energies ◽  
2020 ◽  
Vol 13 (11) ◽  
pp. 2705 ◽  
Author(s):  
Triantafyllia Nikolaou ◽  
George S. Stavrakakis ◽  
Konstantinos Tsamoudalis

The aim of the present paper is to investigate the use of the site “Potamon” Dam in the Prefecture of Rethymnon, Crete island, Greece, as a “virtual” renewable electricity supply of a pumped storage plant (PSP) in order to save and exploit the maximum possible part of the rejected wind energy of the autonomous power system of the Crete island. Taking into account the annual time series of the rejected power of the Crete power grid, the present research work targets the optimal configuration of the proposed PSP power station, including the sizing of its individual components as well as the determination of the capacity it could guarantee in order to be economically viable. The rejected electric energy from the actually operating wind farm production, which is not possible to be absorbed by the grid of Crete due to its stable operation limitations, could be absorbed by the here proposed pump storage plant (PSP) and converted to hydraulic energy. This can be achieved by pumping the water from the lower reservoir, which is the existing reservoir of the site “Potamon” Dam, with a storage capacity of about 22.5 million m3, up to the upper reservoir, which must be constructed accordingly. For the proposed PSP’s optimal size determination, established financial indices are used as an evaluation criterion for an investment life cycle of 25 years. The proposed PSP optimization is based on the dynamic mathematical model of the simulation results of the PSP’s hourly operation when incorporated in the Crete power grid for a whole year, performed in the Matlab 2016b computational environment (The MathWorks, Inc., Natick, MA, USA). The results of this research demonstrate the PSP’s technical feasibility and determine the PSP’s optimal CAPEX and the PSP’s whole life-time financial indicators in order that the whole investment be viable. Furthermore, the appropriate selling prices of the electricity produced from the proposed PSP were determined to achieve the PSP’s financial viability. The results comprise the key elements to prove the necessity for the establishment a.s.a.p. of the appropriate legal framework in order to have authorization to exploit the rejected RES (renewable energy sources) electric energy or the major part of it through PSPs, in priority in both the non-interconnected, as well as the interconnected power systems.