scholarly journals MONITORING DAN KONTROL PADA UPS MENGGUNAKAN MONITORING HUMAN MACHINE INTERFACE ( HMI ) SEBAGAI MEDIA PEMBELAJARAN DI LABOLATORIUM LISTRIK POLITEKNIK PENERBANGAN SURABAYA

2019 ◽  
Vol 4 (4) ◽  
pp. 10-17
Author(s):  
Kustori Kustori

Gedung Labolatorium Praktik Integrasi di Politaknik Penerbangan Surabaya, belum memiliki alat peraga ( Praktikum ) Uninterruptible Power Supply(UPS), sebagai supply catu daya cadangan apabila PLN OFF. Generator set (genset) membutuhkan waktu sekitar 12 detik untuk menyala setelah PLN OFF, oleh karena itu dibutuhkan adanya UPS guna memberikan perlindungan listrik bersih tak terputus atau interupt pada beban yang terhubung. Jadi, sistem kerja dari UPS tidak pernah OFF dan selalu standby dengan berbagai situasi dan kondisi. Dengan demikian, sistem di dalam UPS semakin lama semakin berkurang ketahanan dan usianya. Ketahanan dalam penyimpanan catu daya cadangan akan semakin melemah karena penggunaan yang setiap saat. Oleh karena itu apabila terjadi gangguan pada salah satu UPS yang dapat menyebabkan UPS tersebut tidak dapat bekerja sebagai mana mestinya, dibutuhkannya backup lain yang tetap akan dapat mem-backup beban UPS yang tidak dapat bekerja tersebut. Peneliti mencoba untuk membuat monitoring dan kontrol pada UPS menggunakan monitoring Human Machine intervase ( HMI ) yang bertujuan untuk menjaga suatu sistem tetap berfungsi dengan normal walaupun terdapat elemen yang tidak berfungsi. Hal ini biasanya dicapai dengan memiliki komponen backup yang berfungsi sama dengan elemen sistem. Sistem HMI pada UPS menekankan pada parameter seperti arus dan tegangan menggunakan personal computer (PC) sebagai interface dengan device pengontrol yaitu Mikrocontroller.

JURNAL ELTEK ◽  
2018 ◽  
Vol 16 (1) ◽  
pp. 24
Author(s):  
Irwan Heryanto Eryk ◽  
Slamet Nurhadi

This research is studying the automation of substation monitoring system especially in metering equipment. It was aimed to plan and implemented the substation design that monitored with SIMATIC WinCC program. The equipments are PLC, PM-710, SIMATIC WinCC, Movicon, relay, MCB, CT and Transformers. It used 3 phase power supply connected to several load of Resistor (R),Inductor (L), and Capacitor (C). PM-710 was used to measure the outgoing load datas that connected and saved to Personal Computer (PC). The experiment were using the varied load. Base on the module, the power substation simulated with WinCC and the reading metering datas such as real power, apparent power and power factor also frequency by MOVICON that displayed in the PC monitor.


2020 ◽  
Vol 1 ◽  
Author(s):  
Waylon J. Hastings ◽  
Dan T.A. Eisenberg ◽  
Idan Shalev

Abstract Technical challenges associated with telomere length (TL) measurements have prompted concerns regarding their utility as a biomarker of aging. Several factors influence TL assessment via qPCR, the most common measurement method in epidemiological studies, including storage conditions and DNA extraction method. Here, we tested the impact of power supply during the qPCR assay. Momentary fluctuations in power can affect the functioning of high-performance electronics, including real-time thermocyclers. We investigated if mitigating these fluctuations by using an uninterruptible power supply (UPS) influenced TL assessment via qPCR. Samples run with a UPS had significantly lower standard deviation (p < 0.001) and coefficient of variation (p < 0.001) across technical replicates than those run without a UPS. UPS usage also improved exponential amplification efficiency at the replicate, sample, and plate levels. Together these improvements translated to increased performance across metrics of external validity including correlation with age, within-person correlation across tissues, and correlation between parents and offspring.


Sign in / Sign up

Export Citation Format

Share Document