Forensic Engineering Analysis Of A Concrete Pumping Accident
2010 ◽
Vol 27
(2)
◽
Keyword(s):
This Paper Describes The Writer Forensic Engineering Approach In Analyzing Concrete Pump Lessor, Pump Operator, General Contractor, And Subcontractor Roles And Responsibilities In An Accident Where A Concrete Finisher Was Using A Concrete Pump In An Unsafe Matter. The Paper Also Includes A Discussion Of The Applicability Of Osha Regulations Regarding Employer Responsibility For Construction Safety At Multi-Employer Jobsites.
2006 ◽
Vol 23
(1)
◽
2006 ◽
Vol 23
(2)
◽
Keyword(s):
2010 ◽
Vol 27
(2)
◽
2012 ◽
Vol 29
(2)
◽
2013 ◽
Vol 30
(1)
◽
2015 ◽
Vol 32
(1)
◽
Keyword(s):