Digital Transformation of TPP Control Systems: Transition to an Intelligent Equipment Life Cycle Management Model

Author(s):  
Valentin Ya. Afanasiev ◽  
Eugene P. Grabchak ◽  
Eugene L. Loginov ◽  
Sergey V. Mischeryakov
2021 ◽  
Vol 21 (1) ◽  
Author(s):  
Jinghua Dai ◽  
Xiaoqiang Ren ◽  
Peng Wu ◽  
Xiangdong Wang ◽  
Jiang Li ◽  
...  

Abstract Background This study aims to explore the information chain management model of large instrument and equipment inter-working in the operating room (OR) led by information nurses. Methods Through the chain management process of large instruments and equipment in the OR, which was based on information nurses, the management model of inter-working and integrating information chain was established, the key links were controlled, and the whole life cycle management of instruments and equipment from expected procurement to scrapping treatment was realized. Using the cluster sampling method, 1562 surgical patients were selected. Among these patients, 749 patients were assigned to the control group before the running mode, and 813 patients were assigned to the observation group after the running mode. The related indexes for large instrument and equipment management in the department before and after the running mode were compared. Results In the observation group, the average time of equipment registration was (22.05 ± 2.36), the cost was reduced by 2220 yuan/year, and the satisfaction rate of the nursing staff was 97.62%. These were significantly better, when compared to the control group (P < 0.05). Furthermore, the awareness rate of the whole staff for equipment repair application was 95.12%, and the arrival time of maintenance personnel and the examination and approval time of equipment management were greatly shortened (P < 0.05). Conclusion The integrated management model of large instrument and equipment interworking in the OR based on chain flow realizes the whole life cycle management of instruments and equipment, which is essential to improve management efficiency.


Models are expected to present near real life situations and possible effects on the deliverables based on given input environment. However, models do not necessarily indicate the true solutions and provide scope to work on them incrementally. As discussed earlier, organizations may not follow similar paths to acquire IT and may not even derive desired results despite adopting one. This chapter considers it important to include IS as critical input to managing IT acquisition life cycles and delves further into the IT life cycle management principles to conceptualize a model to specific contributions to assess organizational preparedness for IT acquisitions. This model largely includes discussions on IS centric models and argues in favour of assessing the preparedness across three phases, pre-acquisition, acquisition, and post-acquisition. Each phase considers specific inputs with expected deliverables for successful assessment of the preparedness of the organization in that phase.


2021 ◽  
Vol 334 ◽  
pp. 02019
Author(s):  
Alexey Nekrasov ◽  
Anna Sinitsyna

The paper considers an innovative approach to life-cycle management of transportation-logistical infrastructure, basing on proactive management concept. It recommends new processes, providing for sustainability and adaptation of complex organisational-technical objects in digital transformation of Industry 4.0. Highly-effective infrastructure is based on coordinated interaction of enterprises at different stages of the life-cycle «design – operation – monitoring and correction».


Author(s):  
Sandra Skarić Palić ◽  
Irina Stipanović Oslaković ◽  
Meho Saša Kovačević ◽  
Kenneth Gavin

2012 ◽  
Vol 209-211 ◽  
pp. 1476-1479
Author(s):  
Jie Ru Zhang

With the development of economy and the improvement of living standards, people pay much attention to quality of dwellings rather than quantity. What is more, the traditional house building method is inefficient and the poor quality cannot meet the demand of the market. Therefore, a new architecture building method, prefabricated housing appears and the management method also needs to be changed. This article analyses the features of prefabricated housing in order to build a new management model for Chinese prefabricated housing. The theory of life cycle management is chosen to manage this new building mode. The technology of BIM and mass customization strategy are treated as basic theories to support this essay. Det Ljuva Livet is used as an example to prove that the life cycle management of prefabricated housing is reasonable and feasible.


2021 ◽  
Vol 13 (4) ◽  
pp. 2264
Author(s):  
Pedro César Martínez-Morán ◽  
Jose Maria Fernández-Rico Urgoiti ◽  
Fernando Díez ◽  
Josu Solabarrieta

The digital transformation means that companies are redefining the process of talent management. Previous models involved functions, practices and processes that ensured a correct flow of employees towards key positions or a generic talent management view. The digital breakthrough, together with the growing panorama of competition for talent in the market, requires a different focus to enable well-grounded and agile decision-making processes in a sustainable world. The current research considers the functions that applied research has established as the limits of talent management, and that are the key topics in an employee life cycle, namely, talent attraction and acquisition, training, evaluation, and development. In addition, new tools such as employee advocacy and/or brand ambassadors have been added towards to draw conclusions about the future trends of talent management. This article examines the employee life cycle of talent attraction, and acquisition, training, evaluation, and development in the study of the main digital tools utilized in the Spanish market, by both national and multinational corporations. The results indicate that future investments are needed to correlate the digital tools and take advantage of a better employee life cycle management. The main results show a rapid increase in the number and variety of tools used in the talent acquisition process, an expanded use of social networks to enhance the scope of those processes, and conversely, a minor use of digital tools for both talent development and talent retention processes.


It is noted that modeling techniques envisage capturing the inputs, processes, and the deliverables in an agreed environment. The modeling process argues in favour of measurements and establishing certain standards to validate the outcomes. Therefore, it is important to establish methods for validation of the model. This chapter discusses a framework for the assessment of preparedness in each phase of the model with support from various existing models associated. It includes broad understanding of the whole gamut of the challenges related to IT acquisition preparedness exercise across all the phases. Goal-Question-Metrics (GQM) principles are adopted to validate various hypotheses developed to assess phase specific deliverables. This process is described in detail to appreciate the cyclic behavior of the assessment model conceptualized for an IT acquiring organization. It is also indicated that this framework can be used at any point in the acquisition life cycle.


Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


Sign in / Sign up

Export Citation Format

Share Document