Groundwater Numerical Simulation in an Open Pit Mine in a Limestone Formation Using MODFLOW

2015 ◽  
Vol 35 (2) ◽  
pp. 145-155 ◽  
Author(s):  
José Paulino Fernández-Álvarez ◽  
Lorena Álvarez-Álvarez ◽  
Ramón Díaz-Noriega
2020 ◽  
Vol 2020 ◽  
pp. 1-17
Author(s):  
Kai Zhang ◽  
Xiaojie Yang ◽  
Xuebin Cui ◽  
Yong Wang ◽  
Zhigang Tao

Nanfen open-pit iron mine is the largest single open-pit mine in Asia. Because of the lag of the extension project, the section has slowly spread in the shape of “V,” and disasters such as landslides occur frequently. In this study, first, the NPR anchor cable monitoring, which shows supernormal mechanical characteristics and can realize the monitoring and early warning target for the whole landslide process and early warning curve of bedding rock “2016-1101 landslide” in the lower wall of Nanfen open-pit mine, was analyzed, revealing the failure process of the bedding rock landslide and the force evolution characteristics of the NPR anchor cable. Then, based on the Fish language in FLAC3D and 3DEC software, the mechanical model of the NPR anchor cable was constructed, and numerical simulation was performed on the whole process of “16-1101 landslide” induced by accumulation of old landslide body. The results of this study indicate that the stress monitoring curves and failure characteristics of the NPR anchor cables in the whole process of landslide by the two numerical simulation methods are basically consistent with the field measurement results, providing a theoretical and practical basis for the mechanistic analysis and numerical simulation of other similar slopes.


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Zhiheng Dang ◽  
Zuoming Yin ◽  
Desheng Wang ◽  
Mingyu Fu ◽  
Qi Yin

The microparameter calibration of the particle flow parallel bond model (PBM) is mostly based on a uniaxial compression test. The microparameters calibrated only by uniaxial compression tests cannot be directly used to study the mechanical properties of rocks with surrounding pressure conditions. To analyze the relationship between the macroparameters and microparameters in the model and select appropriate particle flow model parameters, this study conducted a particle flow numerical simulation experiment based on the basic test principles of the uniaxial compression, Brazilian splitting, and triaxial compression tests. An orthogonal experimental design was performed for the calibration of the microparameters of the particle flow PBM, and multifactor analysis of variance was used to screen out the factors that have a considerable influence on the experimental indicators. Regression analysis was performed on the significant influencing factors and test indicators, and the corresponding linear and nonlinear relationships between the macroparameters and microparameters were obtained. Lastly, the microparameters of the model were determined in accordance with the macroparameters of the mechanical test of the Barun open-pit mine dolomite, and a numerical simulation test was conducted. Simulation test results were consistent with the actual test results, thus providing a basis for a subsequent numerical simulation study on the mechanical properties of dolomite.


2000 ◽  
Vol 94 (2) ◽  
pp. 197-224 ◽  
Author(s):  
Yong Shi ◽  
X. S. Feng ◽  
F. S. Wei ◽  
Weimei Jiang

2012 ◽  
Vol 446-449 ◽  
pp. 1853-1857
Author(s):  
Chen Peng ◽  
Peng Fei Chen ◽  
Zheng Yi Ti

To ensure the non-working wall's slope stability in Weijiamao open-pit mine,the paper analysis the engineering geological condition and hydrogeology condition of Weijiamao open-pit mine's slope,on this basis,combine the typical rocky slope's deformation and failure mode,physical properties of glutenite and weak layer from experiment,determined the latent destruction mode of non-working wall's slope in Weijiamao open-pit mine;calculated the slope's stable coefficient and the stable coefficient after cutting slope and unloading with rigid body limit equilibrium method ;make the numerical simulation of slope stability with FLAC3D,these expound the evolution law of slope rock mass stress field,reveal landslide mechanism of non-working wall,determined the landslide model is along the circular slip surface;basis for the numerical simulation result,puts forward prevention measures by cutting slope and unloading to realize stable slope.All these provide guidance for slope stability in Weijiamao open-pit mine,provide reference for open-pit mine's slope stability.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


Sign in / Sign up

Export Citation Format

Share Document