Understanding the kinematic behavior of the active Gascons rockslide from in-situ and satellite monitoring data

2015 ◽  
Vol 195 ◽  
pp. 1-15 ◽  
Author(s):  
Catherine Cloutier ◽  
Jacques Locat ◽  
François Charbonneau ◽  
Réjean Couture
2021 ◽  
Vol 64 ◽  
pp. 1248-1254
Author(s):  
Darragh S. Egan ◽  
Caitríona M. Ryan ◽  
Andrew C. Parnell ◽  
Denis P. Dowling

2019 ◽  
Vol 260 ◽  
pp. 105244 ◽  
Author(s):  
Nicoletta Nappo ◽  
Dario Peduto ◽  
Olga Mavrouli ◽  
Cees J. van Westen ◽  
Giovanni Gullà

2012 ◽  
Vol 204-208 ◽  
pp. 196-201 ◽  
Author(s):  
Jian Cong Xu ◽  
Yi Wei Xu

The parabolic-apex numerical back-analysis method (PNBM) was proposed to obtain such physical-mechanics parameters as Young's modulus and lateral pressure coefficient of surrounding rock by 3D FEM numerical analysis based on in-situ monitoring data. Taking Xiang-an Subsea Tunnel (located in Xiamen, Fujian Province, China) for example, adopting the PNBM using ABAQUS software, three dimensional elastic-plastic FEM-PNBM of tunnel surrounding rock was validated using in-situ monitoring data. The results show as follows: Using the PNBM, not only may high calculation precision be obtained, better meeting the demand of actual projects, but also more reasonable and reliable physical mechanics indices of surrounding rock such as Young's modulus and lateral confinement pressure coefficient, may be obtained. The applicability and the simplicity of this proposed method also support its usefulness.


2010 ◽  
Author(s):  
M. A. Zoran ◽  
R. S. Savastru ◽  
D. M. Savastru ◽  
S. I. Miclos ◽  
M. N. Tautan ◽  
...  

2018 ◽  
Vol 178 ◽  
pp. 40-54 ◽  
Author(s):  
Nick Eleftheroglou ◽  
Dimitrios Zarouchas ◽  
Theodoros Loutas ◽  
Rene Alderliesten ◽  
Rinze Benedictus

2014 ◽  
Vol 580-583 ◽  
pp. 787-790
Author(s):  
Hai Xia Sun ◽  
Ke Zhang ◽  
Si Li Chen

This article mainly expounds the importance of in-situ monitoring on the construction process of deep foundation pit. Taking the deep foundation pit of some Shenyang metro station for example, the deformation features of the supporting structure and the internal and external of foundation pit is analyzed, according to the monitoring data of the fender pile displacement during the excavation of deep foundation pit. The conclusion is obtained that the timely and accurate in-situ monitoring information is necessary to guaranteeing construction safety. We should pay more attention to the excavation speed and exert the interior support timely during the excavation of foundation pit to avoid large deformation and danger. The analytical results of monitoring data shows that the whole stage of foundation pit excavation is stable and the fender pile with internal supports can guarantee the stability of foundation pit.


Sign in / Sign up

Export Citation Format

Share Document