40. To Quick Start or Not to Quick Start: Does This Method Influence Etonogestrel (ENG) Implant Premature Removal Rates Among Adolescents?

2021 ◽  
Vol 68 (2) ◽  
pp. S22-S23
Author(s):  
Alexandria Holliday ◽  
Seema Menon ◽  
Michelle L. Pickett ◽  
Keisha Adams ◽  
Mary Guillot ◽  
...  
1980 ◽  
Author(s):  
C. E. Curry ◽  
A. C. Wei

A general knowledge of aviation practices constituted the background for the identification of three distinct variables as the major drivers for engine removals in the operation of an aircraft. This study provides an insight into the interrelationships of the major drivers which determine engine removals for an aircraft: utilization rate (U), time between overhaul (TBO), and premature removal rate (PRR). Each of these elements is of concern to nearly every aircraft operator. For this study, it was assumed to be the same as aircraft flight hours per month.


1982 ◽  
Vol 17 (1) ◽  
pp. 135-148
Author(s):  
P.T. Wong ◽  
D.S. Mavinic

Abstract The treatability of a municipal leachate (BOD5 = 8090 mg/L) was investigated, by aerobic biostabilization, at a nutrient loading of BOD5:N:P of 100:3.2:1.1. The first stage effluents were subsequently polished by lime-magnesium coagulation. The ranges of ambient air temperature and sludge age studied were 5° to 25°C and 5 to 20 days, respectively. In the biostabilization phase, a BOD5:N:P loading of 100:3.2:1.1 was found to be “adequate” for treatment. Organic and metal removals in the first stage units were excellent. Under all conditions investigated, except for the two units close to washout conditions (5-day sludge age units at 5° and 10°C), BOD5 and COD removals of at least 99.4 and 96.4 percent, respectively, were achieved. Similarly, removal rates for most of the metals monitored were greater than 90 percent. In general, the removal of residual contaminants was not enhanced significantly by the addition of magnesium in the lime-magnesium polishing step.


1995 ◽  
Vol 32 (3) ◽  
pp. 263-270 ◽  
Author(s):  
Seni Karnchanawong ◽  
Jaras Sanjitt

Two pilot-scale studies were comparatively conducted under tropical conditions during December 1992 to September 1993. One study involved facultative ponds(FP) and the others water spinach ponds(SP). Four rectangular concrete ponds, 0.8 m × 2.4 m × 1.1 m (width × length × depth), were employed to treat the Chiang Mai University campus wastewater. Water spinach (Ipomoea aquatica) was planted in two of the ponds. The influent characteristics noted showed a low organic content, i.e. BOD 25.4-29.9 mg/l, with BOD:N ratio around 1:1. The investigations were conducted using the following hydraulic retention times (HRT): 1.6, 2, 2.7, 4, 8 and 16 d. The results showed that the BOD, COD and SS mass removal rates increased as the mass loading rates increased and the SP was significantly more effective in reducing the organic content than the FP. No relationship was found between TN mass removal and the loading rates. However, the TP mass removal rates in the SP and the FP were rather low and were considered to be insignificant. It was observed that SS accumulated in the water spinach root systems which tended to act as a strainer. This process led to plant growth inhibition and finally die-off. The average water spinach growth rates varied from 37 to 107 g wet wt./(m2.d) and no relationship was established between the growth rates and the HRT.


1998 ◽  
Vol 38 (8-9) ◽  
pp. 213-221 ◽  
Author(s):  
Mohamed F. Hamoda ◽  
Ibrahim A. Al-Ghusain

Performance data from a pilot-plant employing the four-stage aerated submerged fixed film (ASFF) process treating domestic wastewater were analyzed to examine the organic removal rates. The process has shown high BOD removal efficiencies (> 90%) over a wide range of hydraulic loading rates (0.04 to 0.68 m3/m2·d). It could also cope with high hydraulic and organic loadings with minimal loss in efficiency due to the large amount of immobilized biomass attained. The organic (BOD and COD) removal rate was influenced by the hydraulic loadings applied, but organic removal rates of up to 104 kg BOD/ m2·d were obtained at a hydraulic loading rate of 0.68 m3/m2·d. A Semi-empirical model for the bio-oxidation of organics in the ASFF process has been formulated and rate constants were calculated based on statistical analysis of pilot-plant data. The relationships obtained are very useful for analyzing the design and performance of the ASFF process and a variety of attached growth processes.


1998 ◽  
Vol 38 (7) ◽  
pp. 19-24 ◽  
Author(s):  
C.-J. Lu ◽  
C. M. Lee ◽  
M.-S. Chung

The comparison of TCE cometabolic removal by methane, toluene, and phenol utilizers was conducted with a series of batch reactors. Methane, toluene, or phenol enriched microorganisms were used as cell source. The initial cell concentration was about 107 cfu/mL. Methane, toluene, and phenol could be readily biodegraded resulting in the cometabolic removal of TCE. Among the three primary carbon sources studied, the presence of phenol provided the best cometabolic removal of TCE. When the concentration of carbon source was 3 mg-C/L, the initial TCE removal rates initiated by methane, toluene, and phenol utilizers were 1.5, 30, and 100 μg/L-hr, respectively. During the incubation period of 80 hours, TCE removal efficiencies were 26% and 96% with the presence of methane and toluene, respectively. However, it was 100% within 20 hours with the presence of phenol. For phenol utilizers, the initial TCE removal rates were about the same, when the phenol concentrations were 1.35, 2.7, and 4.5 mg/L. However, TCE removal was not proportional to the concentrations of phenol. TCE removal was hindered when the phenol concentration was higher than 4.5 mg/L because of the rapid depletion of dissolved oxygen. The presence of toluene also initiated cometabolic removal of TCE. The presence of toluene at 3 and 5 mg/L resulted in similar TCE removal. The initial TCE removal rate was about 95 μg/L-hr at toluene concentrations of 3 and 5 mg/L compared to 20 μg/L-hr at toluene concentration of 1 mg/L.


2000 ◽  
Vol 41 (4-5) ◽  
pp. 253-260 ◽  
Author(s):  
P. Buffière ◽  
R. Moletta

An anaerobic inverse turbulent bed, in which the biogas only ensures fluidisation of floating carrier particles, was investigated for carbon removal kinetics and for biofilm growth and detachment. The range of operation of the reactor was kept within 5 and 30 kgCOD· m−3· d−1, with Hydraulic Retention Times between 0.28 and 1 day. The carbon removal efficiency remained between 70 and 85%. Biofilm size were rather low (between 5 and 30 μm) while biofilm density reached very high values (over 80 kgVS· m−3). The biofilm size and density varied with increasing carbon removal rates with opposite trends; as biofilm size increases, its density decreases. On the one hand, biomass activity within the reactor was kept at a high level, (between 0.23 and 0.75 kgTOC· kgVS· d−1, i.e. between 0.6 and 1.85 kgCOD·kgVS · d−1).This result indicates that high turbulence and shear may favour growth of thin, dense and active biofilms. It is thus an interesting tool for biomass control. On the other hand, volatile solid detachment increases quasi linearly with carbon removal rate and the total amount of solid in the reactor levels off at high OLR. This means that detachment could be a limit of the process at higher organic loading rates.


Sign in / Sign up

Export Citation Format

Share Document