Impact of hydraulic retention time and organic matter concentration on side-stream aerobic granular membrane bioreactor

2019 ◽  
Vol 693 ◽  
pp. 133525 ◽  
Author(s):  
Arezoo Tavana ◽  
Roya Pishgar ◽  
Joo Hwa Tay
2006 ◽  
Vol 53 (11) ◽  
pp. 269-276 ◽  
Author(s):  
C.T. Hay ◽  
D.D. Sun ◽  
S.L. Khor ◽  
J.O. Leckie

A high strength industrial wastewater was treated using a pilot scale submerged membrane bioreactor (MBR) at a sludge retention time (SRT) of 200 d. The MBR was operated at a high sludge concentration of 20 g/L and a low F/M ratio of 0.11 during 300 d of operation. It was found that the MBR could achieve COD and TOC overall removal efficiencies at more than 99 and 98% TN removal. The turbidity of the permeate was consistently in the range of 0.123 to 0.136 NTU and colour254 absorbance readings varied from 0.0912 to 0.0962 a.u. cm−1. The sludge concentration was inversely proportional to the hydraulic retention time (HRT), yielded excellent organic removal and extremely low sludge production (0.0016 kgVSS/day).


2016 ◽  
Vol 73 (12) ◽  
pp. 2904-2912 ◽  
Author(s):  
D. Güven ◽  
E. Ubay Çokgör ◽  
S. Sözen ◽  
D. Orhon

Abstract High rate membrane bioreactor (MBR) systems operated at extremely low sludge ages (superfast membrane bioreactors (SFMBRs)) are inefficient to achieve nitrogen removal, due to insufficient retention time for nitrifiers. Moreover, frequent chemical cleaning is required due to high biomass flux. This study aims to satisfy the nitrification in SFMBRs by using sponge as carriers, leading to the extension of the residence time of microorganisms. In order to test the limits of nitrification, bioreactor was run under 52, 5 and 2 days of carrier residence time (CRT), with a hydraulic retention time of 6 h. Different degrees of nitrification were obtained for different CRTs. Sponge immobilized SFMBR operation with short CRT resulted in partial nitrification indicating selective dominancy of ammonia oxidizers. At higher CRT, simultaneous nitrification–denitrification was achieved when accompanying with oxygen limitation. Process kinetics was determined through evaluation of the results by a modeling study. Nitrifier partition in the reactor was also identified by model calibration.