Aquifer injection for CSG water management in the Surat Basin, Queensland
Appropriate water management associated with CSG production is key to regulatory approval and public acceptance of CSG projects. Policy in Queensland makes injection of treated produced water the government's main and preferred option for CSG water management to ensure protection of the Great Artesian Basin as a groundwater resource. In 2010, Australia Pacific LNG started an extensive program of aquifer injection trials across its Surat and southern Bowen Basin CSG fields. The purpose of the trials is to assess the technical and economic feasibility of aquifer injection. The trial program comprises nine different injection targets across four locations and three aquifers. Target depths range from less than 100 m to about 1,500 m. A process of desktop study-exploration-testing has been followed. To date, Australia Pacific LNG has completed all exploration activities. These included about 1,200 m of coring, an extensive suite of geophysical logging and post processing, hydraulic testing and physical, geochemical and mineralogical analyses. This extended abstract describes the results of the exploration activities and the decisions made based on the acquired data. Comparisons are made between the different sites and aquifers. Results of the testing are discussed in the context of technical and economic feasibility of a large-scale injection scheme.