scholarly journals Novel Pneumatic System for Lime Dosage in Water Treatment Application

2021 ◽  
Vol 2129 (1) ◽  
pp. 012076
Author(s):  
Farid Othman ◽  
Nur Azam Abdullah ◽  
Erwin Sulaeman ◽  
Sher Afghan Khan

Abstract This paper proposes a new pneumatic mechanism for lime dosage in water treatment application. Conventionally, current water treatment system technologies utilising pump system, which requires scheduling maintenance of operation to avoid choke problem due to scaling development. The choke formation depends on the lime dosage concentration, which will be based on the time of operations. Technically, the pneumatic system uses such a hydraulic mechanism consisting of fluid, especially liquid oil, to operate, requiring higher maintenance costs. Based on these arguments, this research investigates the potential of replacing the pump system with an air pneumatic system for water treatment. For that reason, this study proposed a new design of pneumatic mechanism as the alternative solution for pump system. Several analyses have been performed from fluid mechanics to study the water treatment plant flow rate that could be competitive with the conventional pump system.

2016 ◽  
Vol 23 (3) ◽  
pp. 435-445 ◽  
Author(s):  
Izabela Zimoch ◽  
Jolanta Szymik-Gralewska

Abstract In last years all countries of the European Union experience decrease of water consumption. What is worse, in most cases large European water treatment plants (WTP) have been design and built decades ago, when water consumption was much higher than nowadays. It is a challenging task to adjust WTP’s capacity to the current water demand as it is associated with costs and safety issues. Minding that fact, authors decided to propose an new authorial methodology of combined reliability-cost efficiency assessment for water supply system with exceeded redundant capacity, based on new index - unit indicator of reliability-cost efficiency. It included both reliability and costs aspects. It was decided to present the new method on example of the pumping subsystems working for WTP in Poland. The research was based on Activity-Based Life Cycle Costs (AB-LCC) methodology together with two-parametric reliability evaluation. Using real operational and financial data an application of proposed authorial reliability-cost indicator was presented. The reliability-cost efficiency assessment allowed to present how operation of each pumping subsystem influenced global operational costs of WTP. This information is essential for decision-making process for rational management of technical facilities.


2019 ◽  
Vol 10 (1) ◽  
pp. 16
Author(s):  
V. MANE-DESHMUKH PRASHANT ◽  
B. MORE ASHWINI ◽  
B. P. LADGAOKAR ◽  
S. K. TILEKAR ◽  
◽  
...  

2017 ◽  
Vol 16 (10) ◽  
pp. 2303-2315 ◽  
Author(s):  
Djamel Ghernaout ◽  
Abdelmalek Badis ◽  
Ghania Braikia ◽  
Nadjet Mataam ◽  
Moussa Fekhar ◽  
...  

2008 ◽  
Author(s):  
Angelina Johnston ◽  
Kevin O'Connor ◽  
Todd Criswell

2001 ◽  
Vol 1 (3) ◽  
pp. 91-96 ◽  
Author(s):  
L.J. Hem ◽  
E.A. Vik ◽  
A. Bjørnson-Langen

In 1995 the new Skullerud water treatment plant was put into operation. The new water treatment includes colour removal and corrosion control with an increase of pH, alkalinity and calcium concentration in addition to the old treatment, which included straining and chlorination only. Comparative measurements of internal corrosion were conducted before and after the installation of the new treatment plant. The effect of the new water treatment on the internal corrosion was approximately a 20% reduction in iron corrosion and a 70% reduction in copper corrosion. The heavy metals content in standing water was reduced by approximately 90%. A separate internal corrosion monitoring programme was conducted, studying the effects of other water qualities on the internal corrosion rate. Corrosion coupons were exposed to the different water qualities for nine months. The results showed that the best protection of iron was achieved with water supersaturated with calcium carbonate. Neither a high content of free carbon dioxide or the use of the corrosion inhibitor sodium silicate significantly reduced the iron corrosion rate compared to the present treated water quality. The copper corrosion rate was mainly related to the pH in the water.


2002 ◽  
Vol 2 (1) ◽  
pp. 233-240 ◽  
Author(s):  
J. Cromphout ◽  
W. Rougge

In Harelbeke a Water Treatment Plant with a capacity of 15,000 m3/day, using Schelde river water has been in operation since April 1995. The treatment process comprises nitrification, dephosphatation by direct filtration, storage into a reservoir, direct filtration, granular activated carbon filtration and disinfection. The design of the three-layer direct filters was based on pilot experiments. The performance of the plant during the five years of operation is discussed. It was found that the removal of atrazin by activated carbon depends on the water temperature.


1991 ◽  
Vol 24 (10) ◽  
pp. 161-170 ◽  
Author(s):  
M. D. Sinke

Until a century ago, The Hague's waste water was discharged directly into the city's canals. However, the obnoxious smell and resultant pollution of local waters and beaches then necessitated the implementation of a policy of collecting and transferring waste water by means of a system of sewers. By 1937, it was being discharged, via a 400 metre-long sea outfall, directly into the North Sea. By 1967, however, the increasing volume of waste water being generated by The Hague and the surrounding conurbations called for the construction of a primary sedimentation plant. This had two sea outfalls, one 2.5 km long and the other 10 km long, the former for discharging pre-settled waste water and the latter for discharging sludge directly into the North Sea. This “separation plant” was enlarged during the period 1986-1990. On account of the little available area - only 4.1 ha - the plant had to be enlarged in two stages by constructing a biological treatment section and a sludge treatment section with a capacity of 1,700,000 p.e. (at 136 gr O2/p.e./day). In order to gain additional space, a number of special measures were introduced, including aerating gas containing 90% oxygen and stacked final clarifiers. Following completion of the sludge treatment section, it has become possible, since 1st May 1990, to dump digested sludge into a large reservoir (“The Slufter”), specially constructed to accommodate polluted mud dredged from the Rotterdam harbours and waterways. As a result of these measures, there has been a reduction of between 70% and 95% in North Sea pollution arising from the “Houtrust” waste water treatment plant. Related investment totalled Dfl. 200 million and annual operating and maintenance costs (including investment charges) will amount to Dfl. 30 million. Further measures will have to be taken in the future to reduce the discharge of phosphorus and nitrogen. So this enlargement is not the end. There will be continued extension of the purification operations of the “Houtrust” waste water treatment plant.


Sign in / Sign up

Export Citation Format

Share Document