scholarly journals Impact of proactive behaviour antecedents on construction project managers’ performance

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Georgios Kapogiannis ◽  
Terence Fernando ◽  
Ahmed Mohammed Alkhard

Purpose Many aspects of social behaviour are manifested in project managers in interaction with team members in the construction sector. Proactive behaviour as a social behaviour impacts on project and organizational effectiveness. This paper aims to explore and explain how project managers’ proactive behaviour could be enhanced in a project by the use of integrated collaborative environments. The paper aims to discuss these issues. Design/methodology/approach To investigate this interrelationship, researchers used a survey methodology involving gathering both quantitative and qualitative data, and used regression analysis to assess the strength of impact of proactive behaviour antecedents on project manages’ performance on a construction project when using integrated collaborative technologies. For the qualitative data, researchers used content analysis. Findings The research showed that by developing a proactive personality, the construction project manager is more likely to pre-identify “accurately” project time and costs, and to identify project culture, collaboration strategy and project risks. Moreover, co-worker trust as a proactive behaviour antecedent has been shown to impact on raising quality issues in a project. Furthermore, project managers’ flexibility could assist them in designing procurement strategies as well as designing a project business plan and avoiding conflict. Nevertheless, flexibility, including self-efficacy, control appraisal, change orientation, job autonomy and supportive supervision, plays a significant role in the development of proactive behaviour in construction project managers and enhances project performance. Research limitations/implications The sample is limited, but the research methodology is acceptable because the authors use mixed approach to check the correlation. Practical implications How project managers can use integrated collaborative technologies on developing their proactive behaviour and thus impacting project performance is observed. Originality/value The value of this paper is to contribute understanding of the impact of the use of integrated collaborative technologies on developing project managers’ proactive behaviour and thus impacting project performance.

2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.


2014 ◽  
Vol 63 (8) ◽  
pp. 1070-1090 ◽  
Author(s):  
Abdulaziz M. Jarkas ◽  
Milan Radosavljevic ◽  
Liu Wuyi

Purpose – An extensive search of the literature revealed a dearth of research on the demotivational factors affecting the performance and productivity level of site-based construction project managers. Following the announcement of awarding the FIFA 2022 World Cup hosting rights to the State of Qatar, the State is pledging to spend tens of Billions of Dollars on hundreds of new construction projects. Therefore, the purpose of this paper is to identify, explore, and rank the relative importance of the demotivational factors influencing the productivity of the State's construction management force. Design/methodology/approach – A structured questionnaire survey comprising 38 potential demotivational factors, which were shortlisted based on relevant previous studies on the impact of motivation on construction productivity, and numerous interviews with local industry professionals, was distributed to a relatively large sample of site-resident project managers. Using the “Relative Importance Index” technique, the influence ranks of the factors explored were determined. Findings – The results obtained reveal the following as the prominent demotivational factors influencing the productivity of construction project managers: lack of financial incentive schemes; slow decision-making process by owners; remuneration scale; delay in responding to Requests For Information (RFI); shortage of skilled labour force; shortage of materials; clarity and completeness of technical specifications; frequent changing orders during execution; drawings quality level; and rework. Research limitations/implications – It is clear, based on the outcomes, that the cultural background of individuals, and the prevalent practices within the environment in which they operate, are two critical factors in determining their motivation drivers. Hence, it is prudent to explore the dominant culture and values of the management workforce, in addition to the characteristics of the working environment, before trying to apply relevant motivational theories, or even implement new management strategies. Practical implications – The results demonstrate that, within the geographical setting and cultural aspects of the sample surveyed, “tributes” and “pecuniary” may be interpreted to have the largest effect on the productivity of construction project managers. Originality/value – The findings not only contribute to the overall body of knowledge related to the effect of the motivation phenomenon on the productivity of the construction operation, but can also be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the significant demotivational factors affecting the efficiency of the construction project management force practicing in State.


2015 ◽  
Vol 26 (4) ◽  
pp. 479-498 ◽  
Author(s):  
Lianying Zhang ◽  
Xiaoyan Huo

Purpose – The purpose of this paper is to examine the relationship between interpersonal conflict and construction project performance. The authors test the proposition that this relationship is mediated by negative emotions and moderated by political skill. Design/methodology/approach – This study used a structured questionnaire survey and gathered 266 completed data from 45 construction project teams in mainland China. To test the hypotheses, bootstrapping procedures were used. Findings – The results show that interpersonal conflict and negative emotions all have inverse relationships with project performance. Additionally, negative emotions mediated the relationship between interpersonal conflict and project performance, and this indirect relationship will be mitigated when team members have a high level of political skill. Research limitations/implications – These findings indicate that interpersonal conflict has a detrimental influence on project performance and should attract broad attention for future empirical literature. Furthermore, political skill is an effective contingent factor to suppress the detrimental influence of interpersonal conflict. Practical implications – The findings imply that managers should highlight the importance of interpersonal conflict in construction projects. Originality/value – This paper addresses a moderated mediation model to examine the relationship among interpersonal conflict, negative emotions and construction project performance, and it takes into account the moderating role of political skill. The paper also offers practical assistance to construction project managers in managing interpersonal conflict.


2015 ◽  
Vol 20 (3) ◽  
pp. 235-251 ◽  
Author(s):  
Olugbenga Jide Olaniran

Purpose – This paper aims to present the outcome of a study conducted on the impact that cost-based contractor selection (CBCS) might have on construction project performance. Several criteria are normally used to select construction contractors, competitiveness of the quoted prices of the prospective contractors is one such important criterion. However, choosing contractors solely on the basis of the quoted price may cause poor performance in the construction project. Design/methodology/approach – A quantitative approach was adopted. A critical review of the literature was conducted to develop 50 survey questions relating to the problems that CBCS might have on construction project performance. Findings – Analysis of close data obtained from the survey of construction experts showed the nature of project performance problems associated with the CBCS to be project time delays and non-compliance with construction standards. The major reason they occurred was found to be the reduced profit margin for contractors. Research limitations/implications – The research sample size is small and restricted to construction professionals in Brunei. Practical implications – The study findings present updated information to construction professionals about the inherent impacts of choosing contractors based on cost. Furthermore, this study enhances the approach of selecting contractors within the construction industry. Originality/value – The study made strong and unique arguments about the problems associated with choosing construction contractors based on cost. This study contributes to the body of knowledge relevant to the management of construction projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Guofeng Ma ◽  
Shan Jiang ◽  
Ding Wang

PurposeAlthough social media has been increasingly applied and valued in the construction industry, there has been little evidence revealing the influence mechanism of social media use in the construction context. In this way, this paper aims to explore how different purposes of social media use affect project performance from a project manager's perspective.Design/methodology/approachDrawing on the mechanism–outcome–performance framework, this paper developed a research model to figure out the mechanism through which work-oriented and socialization-oriented social media use influences construction project performance. The empirical data were collected from a survey of 249 construction project managers, and the structural equation modeling technique was applied to test the proposed model.FindingsResults indicate that both work-oriented and socialization-oriented social media use promote knowledge acquisition and project social capital, which both further positively impact the project performance. Additionally, the negative moderating role of information overload is identified on the relationship between social media use and knowledge acquisition.Originality/valueThis study fulfills the need for an in-depth investigation of social media use on construction project performance, contributing to the project management and social media literature. Furthermore, this study provides recommendations for project managers to advance social media applications in the construction domain.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Muhammad Sami Ur Rehman ◽  
Muhammad Tariq Shafiq ◽  
Muneeb Afzal

Purpose The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE). Design/methodology/approach This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal. Findings The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic. Research limitations/implications The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research. Practical implications The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE. Originality/value This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Gopal Sekar ◽  
Murali Sambasivan ◽  
Kuperan Viswanathan

PurposeThe purpose of this study is to analyze and compare the impact of project-factors and organization-factors on five indicators of project performance for small and medium enterprise (SME) and large construction contracting firms that are fully responsible for the successful completion of the projects. The five performance indicators are time, cost, safety, quality and financial.Design/methodology/approachA questionnaire survey was conducted to solicit responses from project managers/directors from 342 construction firms in Malaysia. The construction firms included in this study came from various sectors: civil, building and infrastructure; oil and gas; marine and multidiscipline. Hierarchical multiple-regression was used to analyze the data.FindingsThe salient findings are as follows: (1) impacts of project-factors and organization-factors on performance indicators are different for SMEs and large construction firms and (2) relative impact of organization-factors on performance is much higher than the project-factors.Originality/valueAnalyzing the relative impact of project- and organization-factors on the performance of SMEs and large construction firms can significantly enhance the body of knowledge about performance levels and boost best practices in this respect related to construction industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nguyen Van Tam ◽  
Nguyen Quoc Toan ◽  
Vu Van Phong ◽  
Serdar Durdyev

PurposeThis study aims to investigate the impact of primary building information modelling (BIM)-related factors, extracted from the literature on the subject, on construction project performance.Design/methodology/approachBased on data collected from 134 BIM users, this study used structural equation modelling to assess the impact of these factors in five main BIM-related factor clusters.FindingsThe results of the analysis confirmed the reliability and validity of the research design and outcomes. The findings indicated that the BIM-related external factors cluster is the most influential cluster affecting construction project performance. BIM-related project factors and BIM-related technological factors also had a significant impact on project performance. These were followed by the BIM-related management factors cluster, while the BIM-related human factors cluster had a low impact on project performance.Research limitations/implicationsThis study will contribute to fostering BIM adoption and implementation in the construction industry in developing countries.Originality/valueThis study has filled a crucial knowledge gap by providing information on manageable primary BIM-related factors affecting construction project performance.


2018 ◽  
Vol 8 (1) ◽  
pp. 24-38 ◽  
Author(s):  
Georgios Kapogiannis ◽  
Fred Sherratt

Purpose Research has shown that the lack of forming team collaboration works as a barrier in the use of collaborative technologies such as Building Information Modelling. So, there is a need to investigate whether and how integrated collaborative technologies have an impact on team collaboration between stakeholders, including clients, in the planning, design and construction stages. The paper aims to discuss these issues. Design/methodology/approach In order to investigate this interrelationship, researchers used a survey methodology involving gathering both quantitative and qualitative data, and used regression analysis to assess the strength of impact of integrated collaborative technologies on team collaboration. For the qualitative data researchers used content analysis. Findings Findings show that integrated collaborative technologies impact on team collaboration by assisting the development of a collaborative culture throughout a project. This collaborative culture is deployed due to access to information by stakeholders from anywhere at any time. In this culture environment, stakeholders can share and access knowledge and awareness about the project and thus gain common ground and understanding about the project brief. In addition, integrated collaborative technologies give stakeholders the capacity to control the project process, to enhance the interaction and networking project processes as well as to pre-identify and promptly respond to project errors and uncertainties. Originality/value The value of this paper is to contribute in the identification and impact of collaboration culture in the architecture, engineering and construction sector.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


Sign in / Sign up

Export Citation Format

Share Document