scholarly journals Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Barry Gledson

Purpose The purpose of this study is to establish an enhanced model of the innovation-decision process (IDP), specifically for construction. An enhanced model of the innovation-decision process (IDP), specifically for construction is established. As context, innovation diffusion theory (IDT) is concerned with explaining how some innovations successfully stick whilst others fail to propagate. Because theoretical models provide abstracted representations of systems/phenomena, established IDT models can help decision-making units with innovation-related sense-marking and problem-solving. However, these occasionally fail or require enhancement to represent phenomena more successfully. This is apparent whenever middle-range theory seems ill-fitted to the complexity of construction. Design/methodology/approach Qualitative research via 13 semi-structured interviews occurred, with participants recruited via convenience and purposive sampling strategies. The study forms part of a broader mixed-method study (n = 246) informed by a research philosophy of pragmatism, investigating the applicability of classic IDT to the adoption of four-dimensional (4D) building information modelling (4D BIM) by the UK construction sector. Findings This diffusion study resulted in the adaptation of an existing IDP model, ensuring a better contextual fit. Classified more specifically as a modular-technological-process innovation, 4D BIM with its potential to provide construction planning improvements is used as a vehicle to show why, for construction, an existing model required theoretical extensions involving additional stages, decision-action points and outcomes. Research limitations/implications This model can assist construction industry actors with future adoption/rejection decisions around modular-technological-process innovations. It also aids the understanding of scholars and researchers, through its various enhancements and by reinforcing the importance of existing diffusion concepts of compatibility and trialability, for these innovation types. Originality/value An enhanced model of the IDP, specifically for construction, is established. This construction-centric contribution to IDT will be of interest to construction scholars and to practitioners.

2017 ◽  
Vol 24 (6) ◽  
pp. 950-967 ◽  
Author(s):  
Barry J. Gledson ◽  
David Greenwood

Purpose British construction industry KPI data collected over recent years shows a trend in projects exceeding their time schedules. In 2013, the UK Government set a target for projects timeframes to reduce by 50 per cent. Proposed interventions included more rapid project delivery processes, and consistent improvements to construction delivery predictions, deployed within the framework of 4D Building Information Modelling (BIM). The purpose of this paper is to use Rogers’ Innovation Diffusion theory as a basis to investigate how this adoption has taken place. Design/methodology/approach In total, 97 construction planning practitioners were surveyed to measure 4D BIM innovation take-up over time. Classic innovation diffusion research methods were adopted. Findings Results indicated an increasing rate of 4D BIM adoption and reveal a time lag between awareness and first use that is characteristic of this type of innovation. Research limitations/implications Use of a non-probability sampling strategy prevents the results being generalisable to the wider construction population. Future research directions and methods are suggested, including qualitative investigations into decision-making processes around 4D BIM, and case studies exploring the consequences of 4D BIM adoption. Practical implications Recommendations of how to facilitate the adoption of 4D BIM innovation are proposed, which identify the critical aspects of system compatibility and safe trialling of the innovation. Originality/value This paper reinforces 4D BIM as an innovation and records its actual UK industry adoption rate using an accepted diffusion research method. By focusing on UK industry-wide diffusion the work also stands apart from more typical research efforts that limit innovation diffusion exploration to individual organisations.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sukhtaj Singh ◽  
Ezekiel Chinyio ◽  
Subashini Suresh

Purpose Project managers still face challenges with managing stakeholders. Using building information modelling (BIM) has further increased these challenges. Meanwhile, there is a paucity of research specifically focussing on the techniques which organisations are adopting to manage stakeholders within BIM-implemented projects and the associated benefits which they can reap. Thus, this paper aims to identify the key techniques, enablers and benefits of managing stakeholders within BIM-implemented projects. Design/methodology/approach An exploratory approach was adopted due to the paucity of the variables on the topic. In total, 23 semi-structured interviews were conducted in the UK through purposive and snowball sampling. The data was analysed using content analysis and the “NVivo 11 Pro” software. Findings Two key techniques and two enablers required to manage stakeholders within BIM-implemented projects were identified. Nine benefits of managing stakeholders were identified which split into interim and eventual benefits. Originality This paper provides a richer understanding of the enablers and techniques which organisations should focus on while strategising for minimum resistance from stakeholders in their BIM implemented projects.


2017 ◽  
Vol 24 (6) ◽  
pp. 1119-1154 ◽  
Author(s):  
Ruwini Edirisinghe ◽  
Kerry Anne London ◽  
Pushpitha Kalutara ◽  
Guillermo Aranda-Mena

Purpose Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process. Design/methodology/approach In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research. Findings Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research. Originality/value This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.


2019 ◽  
Vol 17 (3) ◽  
pp. 537-553 ◽  
Author(s):  
Mohammad Mayouf ◽  
Michael Gerges ◽  
Sharon Cox

Purpose This paper aims to investigate the integration of a quantity surveyor (QS) role and practice within the building information modelling (BIM) process to enable better implementation of five-dimensional building information modelling (5D BIM) (D is a result of the data/information dimension integrated in a BIM model). It proposes the use of a “level of development and level of detail” to provide a structured approach for QSs’ integration within the BIM process for an improved implementation of 5D BIM. Design/methodology/approach This paper uses semi-structured interviews with QSs from academic and industry in the UK. A total of 20 face-to-face semi-structured interviews were conducted with two groups (industrial and academic) of ten participants from the West Midlands region in the UK. The interview questions have focussed on gaining perspectives on BIM, BIM and government protocols for the QS profession, expectations and challenges when implementing 5D BIM. Findings The findings show that BIM is perceived differently, and limitation of information obtained from the 3D models in BIM reduce the reliability of 5D BIM for QSs and implementing of 5D BIM needs an understanding of BIM workflow and information requirements. Research limitations/implications Although the findings reveal many of the complexities that face QSs within the BIM process and the shortfalls of 5D BIM technology, the results may lack generalisation. Thus, future research seeks to test the proposed framework further. Practical implications This paper elicits implications of shortfalls that impact the implementation of 5D BIM technology and the complexities that face QSs within the BIM process. Originality/value This paper reveals the need to understand the process of integrating stakeholders and their information requirements for better implementation of technologies within BIM.


2016 ◽  
Vol 19 (2) ◽  
pp. 33-44 ◽  
Author(s):  
Martin Whiteford ◽  
Glenn Simpson

Purpose The purpose of this paper is to provide an exploratory account of the links between devolution, homelessness and health in the UK. Specifically, it focusses on the policy context and governance structures that shape the systems of healthcare for homeless people in London, Scotland, Wales and Northern Ireland. Design/methodology/approach Empirically the paper draws on semi-structured interviews with a small sample of policy and practice actors from the devolved territories. Qualitative interviews were supplemented by a comparative policy analysis of the homelessness and health agenda within the devolved regions. Theoretically, it takes inspiration from Chaney’s concept of the “issue salience of homelessness” and explores the comparative character of healthcare as pertains to homeless people across the devolved territories. Findings The paper provides clear evidence of areas of divergence and convergence in policy and practice between the devolved regions. These features are shown to be strongly mediated by the interplay of two factors: first, the scope and scale of national and local homelessness prevention strategies; and second, intra-national variation in public health responses to homelessness. Originality/value The paper offers considerable insight from a comparative policy perspective into the nature of healthcare provision for homeless people in the devolved regions.


2018 ◽  
Vol 18 (1) ◽  
pp. 20-42 ◽  
Author(s):  
Amal Abuzeinab ◽  
Mohammed Arif ◽  
Mohd. Asim Qadri ◽  
Dennis Kulonda

Purpose Green business models (GBMs) in the construction sector represent the logic of green value creation and capture. Hence, the call to examine GBMs is growing ever louder. The aim of this paper is to identify benefits of GBMs by adopting five essential elements of the GBM from the literature: green value proposition; target group; key activities; key resources (KR); and financial logic. Design/methodology/approach In all, 19 semi-structured interviews are conducted with construction sector practitioners and academics in the UK. Thematic analysis is used to obtain benefits of GBMs. Further, the interpretive ranking process (IRP) is used to examine which elements of the GBM have a dominant role in providing benefits to construction businesses. Findings The benefits are grouped into three themes: credibility/reputation benefits; financial benefits; and long-term viability benefits. The IRP model shows that the element of KR is the most important when evaluated against these three benefit themes. Practical implications Linking GBM elements and benefits will help companies in the construction sector to analyse the business case of embracing environmental sustainability. Originality/value This research is one of the few empirical academic works investigating the benefits of GBMs in the construction sector. The IRP method is a novel contribution to GBMs and construction research.


2014 ◽  
Vol 15 (4) ◽  
pp. 404-417 ◽  
Author(s):  
Gareth Chaplin ◽  
Paul Wyton

Purpose – The purpose of this paper is to present the findings of research that aimed to determine what university students living in Unite accommodation in the UK understand about the concept of sustainable living. It considers what barriers they perceive to be standing in the way of following sustainable living practices. In particular, the research aimed to explore any value–action gap for the student population with a view to informing future actions to help close any gap. Design/methodology/approach – The study was completed through an online questionnaire survey of students living in halls of residence operated by provider The Unite Group Plc. The survey informed semi-structured interviews and focus groups that explored the issues raised in greater detail. Findings – It was found that students living in Unite properties believed sustainable living to be important, yet levels of understanding were very low and there appeared to be a wide value–action gap. Reasons for this are varied; however, an unexpected theme emerged around the association of effort and importance. There was a very strong association between sustainable living and recycling, which, therefore, saw the lack of adequate recycling facilities as a significant barrier to sustainable living. There were also issues around a lack of information, cost and respondents’ flatmates as further barriers. However, the most significant barrier was the displacement of responsibility for sustainable living to other people or organisations. Originality/value – Gaining an insight into the complexity of attitude and behaviour of students with the sustainability agenda will enable understanding that can be applied to activities that promote sustainability.


2018 ◽  
Vol 35 (6) ◽  
pp. 890-913 ◽  
Author(s):  
Pushyarag N. Puthusserry ◽  
Zaheer Khan ◽  
Peter Rodgers

PurposeThe purpose of this paper is to examine the role that different collaborative entry modes play in how international new ventures (INVs) expand into international markets.Design/methodology/approachThe paper’s arguments are based on the INVs and social network literatures. In order to investigate the entry modes adopted by British and Indian small and medium information and communication technology (ICT) firms into each other’s markets, the paper outlines the results of qualitative semi-structured interviews with the key decision makers of ten British and ten Indian ICT firms.FindingsThe findings contribute to the relatively under-researched area of how INVs enter foreign markets through collaborative entry mode. The findings suggest that INVs utilize both equity and non-equity modes of collaboration to expand their international operations. The findings also indicate that financial and non-financial resources always limit the market expansion and internationalization of such companies. Against this background, the INVs rely on building collaboration as one of the safest methods for foreign market expansion and successful internationalization. The collaborative entry mode is enhanced by entrepreneurs’ prior experience, social ties and knowledge of the foreign market.Research limitations/implicationsSet against the backdrop of an ever-increasing trend of internationalization of small and medium enterprises (SMEs), the paper offers important implications for understanding the conditions and factors behind the choice of collaborative and non-collaborative entry modes by INVs in particular and SMEs more broadly.Originality/valueThe paper is one of the few studies that have examined the role of collaborative entry modes choice adopted by INVs from two of the largest economies – the UK and India.


2018 ◽  
Vol 4 (4) ◽  
pp. 513-526 ◽  
Author(s):  
Daniel Baxter ◽  
Jenny Flinn ◽  
Lucrezia Flurina Picco

Purpose The purpose of this paper is to investigate major event related terrorism and the resulting challenges that event professionals may face when hosting major events in cities as part of a destination marketing strategy. Design/methodology/approach The research was based in the UK due to the significant rise in terrorist activities that have taken place in its urban cities in recent years. The exploratory nature of this study utilised semi-structured interviews with UK event professionals, enabling a preliminary, in-depth investigation of the challenges that events professionals face as a result of major event related terrorism. Findings The research findings identify three challenges faced by event professionals when organising major events: knowledge and understanding in relation to major event related terrorism; the impact of major event related terrorism in terms of responsibility and accountability; and managing for major event related terrorism in budgetary terms. Research limitations/implications The research is limited to the UK, other destinations will pose their own unique challenges when hosting and managing events. It is suggested that this research be evaluated against similar studies in other destinations. This is a preliminary study and each of the topics identified within the findings warrant further exploration in their own right. Originality/value The paper offers an insight into the challenges faced by event professionals in the UK when delivering major events as part of a destination marketing strategy. With the increase in major event related terrorism in cities the findings of this research are of relevance not only to event professionals but anyone with a role in destination and tourism development.


2014 ◽  
Vol 27 (3) ◽  
pp. 212-224 ◽  
Author(s):  
Malcolm Prowle ◽  
Don Harradine

Purpose – This research concerns the issue of financial governance within the UK NHS and aims to assess the effectiveness of existing financial governance arrangements in the main providers of health services in the UK. Also considered is the importance of good financial governance in a time of financial austerity. Design/methodology/approach – The primary research for this project was based on the use of a questionnaire to all finance directors in NHSTs in England supported by semi-structured interviews with: finance directors, non-executive directors, executive directors and senior finance staff. Findings – Among the main findings of the study were: certain financial management systems were not prioritised in line with what is seen as good practice; existing financial management systems were not always seen as adequate for the achievement of good financial governance; there was sometimes a lack of understanding of financial issues by non-executive directors; and the complexity of the NHS funding process often resulted in opaqueness of the financial risks. Research limitations/implications – The research is limited by the relatively small coverage of NHS trusts but this has been compensated for by a series of in-depth interviews with key stakeholders in the governance process. Practical implications – Weaknesses in financial governance could result in further scandals which result in loss of life and poor patient care. Originality/value – There are many papers on the issue of governance in the public sector in general and the NHS in particular. However, there is little published on the issue of financial governance in the NHS. Also of great value is the emphasis on strengthening financial governance in an era of austerity