scholarly journals The key enablers, techniques and benefits of managing stakeholders within BIM supported projects

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sukhtaj Singh ◽  
Ezekiel Chinyio ◽  
Subashini Suresh

Purpose Project managers still face challenges with managing stakeholders. Using building information modelling (BIM) has further increased these challenges. Meanwhile, there is a paucity of research specifically focussing on the techniques which organisations are adopting to manage stakeholders within BIM-implemented projects and the associated benefits which they can reap. Thus, this paper aims to identify the key techniques, enablers and benefits of managing stakeholders within BIM-implemented projects. Design/methodology/approach An exploratory approach was adopted due to the paucity of the variables on the topic. In total, 23 semi-structured interviews were conducted in the UK through purposive and snowball sampling. The data was analysed using content analysis and the “NVivo 11 Pro” software. Findings Two key techniques and two enablers required to manage stakeholders within BIM-implemented projects were identified. Nine benefits of managing stakeholders were identified which split into interim and eventual benefits. Originality This paper provides a richer understanding of the enablers and techniques which organisations should focus on while strategising for minimum resistance from stakeholders in their BIM implemented projects.

2019 ◽  
Vol 17 (3) ◽  
pp. 537-553 ◽  
Author(s):  
Mohammad Mayouf ◽  
Michael Gerges ◽  
Sharon Cox

Purpose This paper aims to investigate the integration of a quantity surveyor (QS) role and practice within the building information modelling (BIM) process to enable better implementation of five-dimensional building information modelling (5D BIM) (D is a result of the data/information dimension integrated in a BIM model). It proposes the use of a “level of development and level of detail” to provide a structured approach for QSs’ integration within the BIM process for an improved implementation of 5D BIM. Design/methodology/approach This paper uses semi-structured interviews with QSs from academic and industry in the UK. A total of 20 face-to-face semi-structured interviews were conducted with two groups (industrial and academic) of ten participants from the West Midlands region in the UK. The interview questions have focussed on gaining perspectives on BIM, BIM and government protocols for the QS profession, expectations and challenges when implementing 5D BIM. Findings The findings show that BIM is perceived differently, and limitation of information obtained from the 3D models in BIM reduce the reliability of 5D BIM for QSs and implementing of 5D BIM needs an understanding of BIM workflow and information requirements. Research limitations/implications Although the findings reveal many of the complexities that face QSs within the BIM process and the shortfalls of 5D BIM technology, the results may lack generalisation. Thus, future research seeks to test the proposed framework further. Practical implications This paper elicits implications of shortfalls that impact the implementation of 5D BIM technology and the complexities that face QSs within the BIM process. Originality/value This paper reveals the need to understand the process of integrating stakeholders and their information requirements for better implementation of technologies within BIM.


2019 ◽  
Vol 19 (3) ◽  
pp. 298-320 ◽  
Author(s):  
Maria Christina Georgiadou

Purpose This paper aims to present a state-of-the-art review of building information modelling (BIM) in the UK construction practice. In particular, the aim is to examine the scope, value and practical implications of BIM implementation in residential projects by evaluating practitioners’ perspectives working in the Greater London Area (GLA). Design/methodology/approach The paper outlines the general status quo of BIM adoption and maturity in the UK. It then discusses the feasibility of BIM use in residential projects drawing on an online survey and complementary semi-structured interviews with building professionals. The cross-comparison between the evidence base and literature review uncovers the specific benefits, challenges and risks to BIM implementation in the house building sector. Findings BIM is an evaluation methodology that helps the management of digital information throughout the project lifecycle. At a conceptual level, a BIM-enabled project offers quality assurance and on-time delivery, collaboration and communication improvement, visual representation and clash detection and whole lifecycle value. The findings, however, suggest that the most frequently reported benefits are related to collaboration and the blend of product (software) and process innovation, whilst lifecycle thinking and waste reduction are often overlooked. At present, there is widespread awareness on BIM but with a financial barrier to invest in developing digital capabilities, particularly for small- and medium-sized enterprises. Practical implications The paper concludes with a critical commentary on the lack of strategic leadership in both the supply and demand side. The role of policy to streamline commercial drivers for whole lifecycle costing in procurement is endorsed to drive the change management required to address the short-term mind-set of senior management and wider fragmentation of the construction industry, also serving as a research question for further research and development in the field. Originality/value There are relatively few studies evaluating BIM perspectives in UK residential projects. This paper explores the feasibility and “real-life” value of BIM in housing practice, drawing on views and experiences of building professionals in GLA. In particular, the research findings provide an evidence base evaluating the extent to which the house building industry has the expertise and capability to operate in a BIM environment and to comply with the Level 2 mandate and explore which of the generic barriers and drivers of BIM-readiness are more relevant to the design and construction of housing projects.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Barry Gledson

Purpose The purpose of this study is to establish an enhanced model of the innovation-decision process (IDP), specifically for construction. An enhanced model of the innovation-decision process (IDP), specifically for construction is established. As context, innovation diffusion theory (IDT) is concerned with explaining how some innovations successfully stick whilst others fail to propagate. Because theoretical models provide abstracted representations of systems/phenomena, established IDT models can help decision-making units with innovation-related sense-marking and problem-solving. However, these occasionally fail or require enhancement to represent phenomena more successfully. This is apparent whenever middle-range theory seems ill-fitted to the complexity of construction. Design/methodology/approach Qualitative research via 13 semi-structured interviews occurred, with participants recruited via convenience and purposive sampling strategies. The study forms part of a broader mixed-method study (n = 246) informed by a research philosophy of pragmatism, investigating the applicability of classic IDT to the adoption of four-dimensional (4D) building information modelling (4D BIM) by the UK construction sector. Findings This diffusion study resulted in the adaptation of an existing IDP model, ensuring a better contextual fit. Classified more specifically as a modular-technological-process innovation, 4D BIM with its potential to provide construction planning improvements is used as a vehicle to show why, for construction, an existing model required theoretical extensions involving additional stages, decision-action points and outcomes. Research limitations/implications This model can assist construction industry actors with future adoption/rejection decisions around modular-technological-process innovations. It also aids the understanding of scholars and researchers, through its various enhancements and by reinforcing the importance of existing diffusion concepts of compatibility and trialability, for these innovation types. Originality/value An enhanced model of the IDP, specifically for construction, is established. This construction-centric contribution to IDT will be of interest to construction scholars and to practitioners.


2019 ◽  
Vol 19 (2) ◽  
pp. 170-192 ◽  
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Colin Booth ◽  
Patrick Manu ◽  
Emmanuel Manu

PurposeIn spite of emerging research on building information modelling (BIM) capability assessment, there is a general dearth of knowledge about the links between often pre-emptive capability measurement attributes and actual delivery success. More so, current studies have not considered success from the wider construction supply chain (CSC) perspective. So far, the perceived importance of capability metrics is not based on post-project evaluations of their contribution to BIM delivery success. This paper aims to identify relevant BIM capability attributes used for qualifying CSC organisations for projects and further aims to investigate their relative importance and influence on some key aspects of BIM delivery success.Design/methodology/approachBased on heretofore validated set of BIM capability attributes from semi-structured interviews and a Delphi study, a survey of CSC firms on BIM-enabled projects was used to model the influence of BIM capability attributes on BIM delivery success. Multiple regression modelling was performed to ascertain the nature of the relationship between BIM capability attributes and the key aspects of BIM delivery success as identified from the literature.FindingsBIM staff experience and the suitability of proposed methodology prior to project commencement were identified as the most influential on BIM delivery quality, as well as delivery within schedule and on budget. Conversely, the administrative and strategic-level capacities were found as the most influential in leveraging collaboration, coordination or integration of the CSC on projects through BIM.Originality/valueThis study provides a step change in prioritising BIM capability criteria based on evidence of their contribution to delivery success in key performance areas, rather than their perceived importance as capability metrics as widely practised.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Oluwole Alfred Olatunji ◽  
Jane Jia Suen Lee ◽  
Heap-Yih Chong ◽  
Abiola Abosede Akanmu

PurposeThis study investigates building information modelling (BIM) penetration in quantity surveying (QS) practice by examining the significance attached to the benefits and barriers of BIM adoption, BIM capabilities and future directions of BIM in QS processes. A popular opinion amongst construction researchers is that BIM has the capacity to revolutionize the industry. The study draws-out information in the literature regarding discipline-specific penetration of BIM.Design/methodology/approachSnowball sampling method was used to obtain information through a survey questionnaire. A total of 73 participants, largely quantity surveyors in Western Australia, took part in the study. Reductionist methodology was used to identify key variables of QS-BIM competencies that are most significant statistically.FindingsBIM does not impose additional difficulties to traditional QS processes. Adherence to standard method of measurement and limited market demand do not hinder BIM deployment significantly. Quantity surveyors are able to use BIM to support their professional services once definitive design models are involved. In addition, the study identifies BIM penetration barriers to include constraints caused by centralised database management and interoperability issues, limitations imposed by market drivers, lack of in-house expertise to manage modelling needs and limited capability in software management.Practical implicationsFuture opportunities for skill development are in the areas noted in the findings. Whilst many studies have reported resistance and widespread scepticism amongst some construction disciplines regarding BIM adoption, this study finds BIM penetration in QS practice is considerable, a direction that could trigger further novel innovations.Originality/valueThe methodology reported in the study is novel. In addition, findings from the study inspires other discipline-specific studies to articulate their BIM-penetration trends so that t broad areas of construction can develop a balanced strategy around BIM and innovation development.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ana Karina Silverio ◽  
Subashini Suresh

Purpose The increased use and proven benefits of building information modelling (BIM) worldwide suggest that its implementation could be of great help in diminishing inefficient traditional practices in the Dominican Republic (DR) construction industry. However, there is no empirical work about the implementation of BIM in the country. This study aims to critically appraise and document the status of the implementation of BIM in the DR to raise awareness and understand how BIM can be successfully implemented in the country. Design/methodology/approach A qualitative approach was adopted in which data was collected through semi-structured interviews, with the participation of 53 professionals from 36 construction organisations. The data collected was analysed with the method of content analysis. Findings The results confirmed that the DR is a BIM infant country. There are low levels of BIM implementation. The reasons why BIM is not implemented are explored, and a significant interest in implementing BIM in the future was also reported. Drivers to implement BIM include BIM benefits, competitive advantage and pressure from external partners. Current BIM approaches are mainly single-disciplinary, principally in architecture, and the effectiveness and scope of implementation are highly affected by intra-organisational and inter-organisational barriers. Originality/value There is a lack of research about the implementation of BIM in the DR. This study bridges this research gap by collecting primary data from Dominican construction organisations and construction professionals to report findings related to BIM implementation.


2018 ◽  
Vol 36 (4) ◽  
pp. 400-422 ◽  
Author(s):  
Afifuddin Husairi Husain ◽  
Muhammad Najib Razali ◽  
Sabariah Eni

Purpose The purpose of this paper is to investigate the benefits that client organisations expect from building information modelling (BIM) investment in Malaysia. Furthermore, this paper investigates the outcomes that, from the stakeholders’ point of view, the BIM approach needs to present. Design/methodology/approach To achieve this aim, this research employed a series of structured interviews which were conducted with representatives from client construction organisations in Malaysia. A structured questionnaire, containing 34 items, was used to collect data from respondents. Findings This research’s findings indicated that increased project revenue is one of the most expected benefits of BIM investment. In addition, it has been revealed that the Malaysian construction industry has implemented the BIM approach to project management. Furthermore, the great deal of acceptance among industrial players has been significantly positive, and thereby it can be concluded that the implementation of BIM in Malaysia has lots of potential. Originality/value This paper’s finding offers great knowledge, policy, and academic contribution, acknowledging the development of BIM’s implementation within the Malaysian construction industry.


Author(s):  
Oriel Prizeman ◽  
Christopher Bernard Jones ◽  
Mariangela Parisi ◽  
Camilla Pezzica

PurposeThe purpose of this paper is to describe a novel approach to inform heritage conservation based on the effective integration of documentation-based research with advanced survey methods for the creation of a sharable historic building information modelling (HBIM) objects database, specifically oriented to the study of Carnegie libraries whose designs in the USA and the UK were somewhat systematised by early principles of standardisation. The aim is to generate an exemplar developing new methodologies for the salvage, re-use and re-invigoration of shared inherited public buildings which have many common and standardized features.Design/methodology/approachThis project will also involve the collaboration of conservation practice and digital recording together with library history. Digital laser scanning and structure from motion will be used together with archival documents to accurately build an information-rich framework for CAD and building information modelling applications.FindingsBy providing the base elements for the semi-automatic generation of a wide variety of morphological typologies and construction elements, this work ultimately promotes a shift towards the implementation of HBIM to support the conservation, maintenance and management of a high number of insufficiently protected public buildings from the turn of the last century.Originality/valueThe intention is that the resulting multidimensional parametric object library will provide suitable support for the faster generation of enriched 3D historic models and ultimately support the preservation of a large proportion of the huge but threatened public library building heritage in the UK and USA.


2016 ◽  
Vol 19 (2) ◽  
pp. 33-44 ◽  
Author(s):  
Martin Whiteford ◽  
Glenn Simpson

Purpose The purpose of this paper is to provide an exploratory account of the links between devolution, homelessness and health in the UK. Specifically, it focusses on the policy context and governance structures that shape the systems of healthcare for homeless people in London, Scotland, Wales and Northern Ireland. Design/methodology/approach Empirically the paper draws on semi-structured interviews with a small sample of policy and practice actors from the devolved territories. Qualitative interviews were supplemented by a comparative policy analysis of the homelessness and health agenda within the devolved regions. Theoretically, it takes inspiration from Chaney’s concept of the “issue salience of homelessness” and explores the comparative character of healthcare as pertains to homeless people across the devolved territories. Findings The paper provides clear evidence of areas of divergence and convergence in policy and practice between the devolved regions. These features are shown to be strongly mediated by the interplay of two factors: first, the scope and scale of national and local homelessness prevention strategies; and second, intra-national variation in public health responses to homelessness. Originality/value The paper offers considerable insight from a comparative policy perspective into the nature of healthcare provision for homeless people in the devolved regions.


2018 ◽  
Vol 18 (1) ◽  
pp. 20-42 ◽  
Author(s):  
Amal Abuzeinab ◽  
Mohammed Arif ◽  
Mohd. Asim Qadri ◽  
Dennis Kulonda

Purpose Green business models (GBMs) in the construction sector represent the logic of green value creation and capture. Hence, the call to examine GBMs is growing ever louder. The aim of this paper is to identify benefits of GBMs by adopting five essential elements of the GBM from the literature: green value proposition; target group; key activities; key resources (KR); and financial logic. Design/methodology/approach In all, 19 semi-structured interviews are conducted with construction sector practitioners and academics in the UK. Thematic analysis is used to obtain benefits of GBMs. Further, the interpretive ranking process (IRP) is used to examine which elements of the GBM have a dominant role in providing benefits to construction businesses. Findings The benefits are grouped into three themes: credibility/reputation benefits; financial benefits; and long-term viability benefits. The IRP model shows that the element of KR is the most important when evaluated against these three benefit themes. Practical implications Linking GBM elements and benefits will help companies in the construction sector to analyse the business case of embracing environmental sustainability. Originality/value This research is one of the few empirical academic works investigating the benefits of GBMs in the construction sector. The IRP method is a novel contribution to GBMs and construction research.